ML18227A937

From kanterella
Jump to navigation Jump to search
Letter Submitting Three Signed Originals and Seventeen Copies of the Semi-Annual Environmental Monitoring Report No. 4 Covering Period from January 1 Through June 30, 1975
ML18227A937
Person / Time
Site: Turkey Point  
Issue date: 08/27/1975
From: Robert E. Uhrig
Florida Power & Light Co
To: Muller D
Office of Nuclear Reactor Regulation
References
Download: ML18227A937 (6)


Text

0 NRC DISTRIBUTION FOR I'ABT 50 DOCl(.ET MATERIAL (TEMPORARY FORM)

CONTROL NO:

FILE

~

~ -

~

FROM.Florida Power. & Light Co, Miami, Fla Robert E

Uhri TO

~ '

Mr.'nie1 Ri'uller DATE OF DOC 8-2 -75

ORIG 3-signed DATE R EC'D 9 CC OTHER LTR TWX RPT SENTNRC PDR SENT LOCAL PDR OTHER CLASS UNCLASS PROPINFO INPUT NO CYS REC'D

'DOCKET NO

-2 and 251 PLANT NAME:

Turke Point j)f3 and 4 DESC R IPTION:

Ltr trans the following:

ACRS-1 Dept of Interior-2

~ EPA-2 Cys sent to Euviro Lic Asst for,Dist ENCLOSURES:

Semi-Annual

(. Environmental Report No, 5

January 1,

1975 through'une 30, 1975

( ZO cys enc'1 rec'd)

ACKN0%I.HBGIif"D.

DO NOT azMOv'"

FOR ACTION/INFORMATION BUTLER (L)

W/ Copies CLARK (L)

W/ Copies PARR (L)

W/ Copies KNIEL (L)

W/ Copies SCHWENCER (L)

W/ Copies STOLZ (L)

W/ Copies VASSALLO (L)

W/ Copies PURPLE (L)

W/ Copies ZlEMANN (L)

W/ Copies DICKER (E)

W/ Copies

~GIPON (E)

W/copies YOUNGBLOOD W/ Copies REGAN (F)

/ Copies EAR (L)

W/j Copies.

SPIES W/ Copies (F)

W/~opies REID(L)

W/

COPIES BC PDR OGC, ROOM P-506A GOSSI CK/STAF F CASF GIAMBUSSO BOYD MOORE (L)

DEYOUNG (L)

SKOVHOLT (L)

GOLLEB (L) (Ltr)

P. COLLINS DENISE

~G OPB FILE 8( REGION (2)

MIPC')

TECH REVIEW SCHROEDF R MACCARY KNIGHT PAWLICKI SHAO STELLO HOUSTON NOVAK ROSS IPPOLITO TEDESCO MCOLLINS LAIN AS BENABOYA VOLLMEB INTERNALDISTRIBUTION DENTON LIC ASST.

GRIMES B. DIGGS (L)

MILL H. GEAR IN (L)

ASTNER F GOULBOURNE (L)

~LLARD P. KBEUTZEB (E)

SPANGLEB J. LEE (L)

M. RU3HBROOi<{L)

ENVIBO S. REED (E)

MULLER M. SERVICE (L)

DICKER S. SHEPPARD (L)

KNIGHTON tkVSLATER (E) ~~

YOUNGB LOOD H. SMITH (L)-

EGAN

~TEETS (L) ~~

ROJECT LDR G. WILLIAMS(E)

IA.

V. IVI LSON (L)

HARLESS R, INGRAM (L)

II~DDNCAI( Q)

EXTFBNALDISTRIBUTION A/T IND

~

BRAITMAN SALTZMAN ME LTZ PLANS MCDONALD CHAPMAN.

DUBE (Ltr)

E. COUPF PETERSON HARTFIELD (2)

KLECKEB EISENHUT WIGGINTON

~- LOCALPDB Miami, Fla M-TIC (ABERNA1 HY) O'RE)~) NATIONALLABS+tC~ (

~- NSIC (BUCHANAN) 1 W. PENNINGTON, Rm E.201 GT 1 ASLB 1

CONSULTANTS 1 Newton Anderson NEWMABK/8LUME/AGBABIAN ACBS HOLDING/SENT 1 P D B.SAN/LA/NY 1 BROOKHAVEN NAT LAB 1 G. ULBIKSON OBNL

~

~ '~~

I' 22%.~l,

~ 'I s

p'

P. O. BOX 013100, MIAMI,FLORIDA 33IOI

-FLORIDA POWER 5 LIGHT COMPANY August 27, 1975 L-75-410 Hr. Daniel R. Muller, Assistant Director for Environmental Projects Division of Reactor Licensing Office of Nuclear Reactor Regulation U.

S. Nuclear Regulatory Commission Washington, D.

C.

20555

Dear Nr. Muller:

Re:

Semi-Annual Environmental Monitoring Report No.

4 Turke Point Units 3 and '4, Docket Nos.

50-250 and 50-251 Xn accordance with Appendix B, Section 5.4.2, of the Turkey Point Environmental Technical Specifications, Florida Power 6c Light Company herewith submits three signed originals and seventeen copies of the semi-annual environmental monitoring report for the Turkey Point Plant.

This report covers the period from January 1 through June 30, 1975.

Yours very truly, Robert E. Uhrig Vice President REU:nch Enclosure cc:

Jack R.

Newman, Esquire HELPING BUILD FLORIDA

\\'~

l' 0

~

i

P.O. BOX 013100 MIAMI,F LA. 33101 i'll(ji FLORIDA POWER & LIGHT COMPANY August 27, 1975 L-75-410 Nr. Daniel R. Huller, Assistant Director for Environmental Projects Division of Reactor Licensing Office of Nuclear Reactor Regulation U.

S. Nuclear Regulatory Commission Washington, D.

C.

20555

Dear Nr. Huller:

Re:

Semi-Annual Environmental Monitoring Report No.

Turke Point Units 3'nd,

Docket Nos.

50'-250 and 50-251 In accordance with Appendix B, Section 5.4.2, of the Turkey Point Environmental Technical Specifications, Florida Power c Light Company herewith submits three signed originals and seventeen copies of the semi-annual environmental monitoring report for the Turkey Point Plant.

This report covers 'the period from January 1 through June 30, 1975.

Yours very truly, Robert E. Uhrig Vice President REU:nch Enclosure cc:

Jack R.

Newman, Esquire HE LP IN G BUILD FLOR I DA

0 0

O.