ML18227A916
| ML18227A916 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 03/29/1973 |
| From: | Knighton G US Atomic Energy Commission (AEC) |
| To: | Coughlin J Florida Power & Light Co |
| References | |
| Download: ML18227A916 (8) | |
Text
Dr. Games Coughlin 3
tIiAR 8e Sg sampling in the cooling channels and assessment of food-chain concentration
- factors, as well as radiation doses from shoreline'and water of the channels (FES, pages Y-56 and -57}.
Your response on revised proposed Technical Specifications shou'id also cover these additional points.
It $s recognized that use of the proposed environmental limits on operation of the Turkey Point Units 3 and 4 may need to be modified in light of implementing actions taken under the Federal Water Pollution Control Act.
Sincer ely, cc:
ftr. Back Newman Newman 8I Reis 1100 Connecticut Avenue, HH Washington, D, C.
20036 Original.".igI>cd by Georg~ hA HIIi"hton George W. Knighton, Chief Environmental Projects Branch No.
1 Directorate of Licensing DISTRIBUTION:
AEC PDR Local PDR Docket File (Environ)
EP>>l Reading EP-1 File
H. Denton, SS, L
G. Knighton, EP-1 D. Muller, ADEP AGiambusso, RP, L
P. Check, L, PWR K. Kniel See previous yellow for concurrences OFFICE P SURNAME P DAIEP Form AEC-318 (Rcv. 9-33) hECM 0240 ohio ol3 IcSNOT I 44&4}TS
J
~ l I
S '.
II'
~
C C
Docket No. 50-250 MAR 29
>9>~
Florida Power 8 Light Company ATTN:
Dr. James Coughlin Senior Vice President P, D. Box 3100 Miami, Florida 33101 Gentlemen:
This letter is in confirmation of the discussions held.>vith Nr. Orin Pearson and others of your staff relative to the visit of l<r.richard Cleveland of this office to the Turkey Point site on. February 13, fl973 concerning the proposed Environmental Technical Specifications for Turkey Point Units 3 and 4 and the progress of the construction and testing program for the cooling channel system.
We are in basic agreement v~ith the majority of your proposals for limits on operations, monitoring of d)scharges, and surveil-lance of environmental conditions and changes.
We understand you are proceeding to develop a revised set of proposed Technical Specifications.
The following changes should be covered in this revision:
,1. The Environmental Technical'Specifications should be prepared as an Appendix B to the licenses.
Format should follow the outline of (1) Definitions, (2) Protection Conditions, (3)
Monitoring Requirements, (4) Surveillance and Special Study
- Programs, and (5 Administrative Requirements.
Bases should be included for 2), (3), and (4).
The administrative section should provide for review and audit of the environmental
- program, action on vio1ations of Technical Specifications, establishment of operating procedures for the environmental program, reporting requirements, and records retention.
- 2. An operating limit for salinity in discharge water should be specified (not to exceed 110$ of the ambient salinity.in the receiving water and not to exceed 44 parts per thousand).
- 3. Turbidity limits should be specified.
We feel operations and constrpction should not be causing discharges with turbidity more than 10 Jackson Turbidity Units greater than that of the receiving water.
Even at this level, we have observed at Turkey Point there can be a marked degradation in the visual quality of the receiving waters',
and average discharge levels va ue.
OFFICEi SURNAME >... ~.. ~ ~-------:-~-
DATE>
Form hKC-318 (Rcv. 9-33) hEChS 0240 ohio ore 10 Swor-r 4r~r8
I t ~
gr
'E I
I t
I I
~ t
'l I
t IJ h
I I
I=
~
fl It K
I li J
r I
I I
I I
I I
Kf
'I I
It I
v
,Jht I
II II tv I
f f,
t IJ h
C Il f
~
I*
I I
t I'
t I
t
~ LE ".
t'I t
t I
I I
I I hi I
V JL Ei \\'
f p
I t t'I J
II h
I I <
DATE P Form hEC-318 IRev. 9-53) hECM 0240
~
I
~
I 4
P I
j 44 I
44 Vt" I
I 4 4 C
h
~,
li 4
14 4
I 4
4 4 4 4
~
~
I V
J I
I Ci k
h' I $
Ik I 1
Z.
~ n C,
~ 4 4
I I
4 C
4 44, 4
4 VP I
4 I
4 k
4 I
4 II 44 F
~
C 4
h 4 'I C.
1
Dr. James Coughl)n sampling 3n the cooling channels and assessment of food-chain concentration
- factors, as well as radiation doses from shoreline and water of the channels (FES, pages V-56 and -57).
Your response on revised proposed 1'echnical Specifications shou'Id also
~ove~ these additional points.
Sincerely George ll. Knighton, Chief Environmental Pro)ects Branch No.
1 Directorate of Licensing cc:
Hr. Jack Neman II Newman 8 Refs 1100 Connect)cut Avenue, NM DISTRIBUTION:
washington D.. C.
20036 AEC PDR Local PDR Docket File EP-1 File EP-1 Reading
H. Denton, SS, L
G. Knighton, EP-1 D. Huller, ADEP A. Giambusso, RP, L
P. Check, L, PWR K. Kniel,-
OFFICE p kt\\
~
RCle and:mw SURNAME >
3/Rg/73 DATE>
Form hEC-518 (Rev. 9-53) hECM 0240
.......OGG..
JGal 1 3/)$/73
......L J'.P.-3 GWKnighton 3/
/73 dto a48 16 Sll05 1 44~78
\\
l II c
e
~
~
C J
l 1