Letter Requesting Official Change in the Requirements as Set Forth in Section 4.A.1.g of the AEC Technical Specifications, Appendix B, for Turkey Point Electric Generating Plant
ML18227A876
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 05/20/1974
From: Robert E. Uhrig
Florida Power & Light Co
To: Muller D
US Atomic Energy Commission (AEC)
References
Download: ML18227A876 (6)


Text

AEC TRIBUTIOH FOR PART 50 DO"KET V

'.RIAL

-(m~PORARY rOm)

CONTROL NO:

4586 FROM:

Florida Power

& Light Co'~'.

Miami, Fla.

Robert E. Uhri 5-20-74 5-22-74 DATE OF DOC DATE REC'D LTR MEMO RPT OTHER TO:

Daniel R. Muller ORIG 3 signed CC OTEER

  • 'LASS UNCLASS PROP INFO INPUT NO C S REC'D DOCKET NO:

DESCRiPTION:

ENCLOSURES:

50-250 51 Ltr requesting change in requirements of Tech Specs Appendix B

(Ltr notarized 5-20-74)

>CENTI,mGEB 3)0 NOT REMOVE PLANT NA1&:

TURKEY POINT UNITS 1 & 2 FOR ACTION/XNFORMATIOH BUTLER(L)

W/

Copies CLARK(L)

W/

Copies PARR(L)

W/

Copies KHIEL(L)

W/

Copies SCHWEHCER(L)

W/

Copies STOLZ(L)

W/

Copies VASSALLO(L)

'/

Copies 4 PURPLE (L)

W/g,Copies info ZIEIAHN(L)

W/

Copies DICKER(E)

W/

Copies 4KNIGHTON(E) "

W/1 Copies YOUNGBLOOD(E)

W/

Copies REGAN (E)

W/

Copies W/

Copies ll/

Copies W/

Copies IN RNAL DISTRIBUTION REG FILE Ltr 251 3E~)V Ltr251

ZOGC, ROOM P-506A MUHTZING/STAFF CASE GIAHBUSSO BOYD MOORE (L) (BWR)

DEYOUHG (L) (PWR)

SKOVHOLT (L)

GOLLER(L)

P.

COLLINS DENISE jREG OPR FILE & REGION(3)

MORRIS STEELE TECH REVIEW HENDRIE SCHROEDER MACCARY KNIGHT PAWLICKX SHAO S TELLO HOUSTON NOVAK ROSS PPOLITO TEDESCO (2)

LONG LAINAS BENAROYA VOLLHER EHTON GRIMES GAi2EILL VKASTNER JBALLARD SPANGLER ENVIRO MULLER DXCKER KNIGHTON YOUNGBLOOD REGAN PROJECT LDR J CLEVELAND 2 )

HARLESS

'XC ASST DIGGS (L)

GEARXN (L)

GOULBOURNE (L)

LEE (L)

MAXGRET (L)

REED (E)

SERVICE (L)

SHEPPARD (L)

SLATER (E)

SMITH (L)

TEETS (L)

WADE (E)

WXLLIAMS (E)

WILSON (L)

A/T 1ND BRAT1NAN SALTZHAN B.

HURT PLANS CDO'lALD DUQE w/Input INFO C. MILES B. KING (E/W-358)

KLECKER EXSENEHJT EXTERNAL DISTRIBUTION 1 - LOCAL PDR HOMESTEAD FLA

" TXC (ABERNATEiY)

~1 - NSXC(BUCHANAN) 1 - ASLB Po Ro DAVXS (AEROJET NUCLEAR) 16 - CYS ACRS HOLDING (1) (S)(SSB) NATIONAL LAB'S PNNL 1-ASLBP(S/N Bldg,Ra S29) l-ti, PENNXNGTON Rm E-201 GT 1-CONSULTANT'S NElkfARK/BLUHE/AGMBIAN 1-GERALD ULRXKSOH...ORHL 1-B &,M SWINEBROAD, Rm E-201 1-PDR-SAN/LA/NY 1-GERALD LELLOUCHE'ROOKHAVEHNAT. "LAB 1"AGHED(Ruth Gussma

)

EM-B-127, GT.

1-RD..HULLER..F-309 GT GT

0 0

I l

P.o. 8OX 3100 MIAMI,FLORIDA 33101 FLORIDA POWER 5 LIGHT COMPANY May 20,,1974.

V

+n

~*'r.

Daniel R. Muller, Assistant for Environmental Projects Directorate of Licensing Office of Regulation U. S. Atomic Energy Commission Washington, D.

C.

20545

Dear Mr. Muller:

Re:

Turkey Point Units 3 6 4 Docket Nos.

50-250

& 50-'251 Director 5gr Sgy g~

)

ijjjCg@@~~4 )

Cg II. 04 This letter is being written to request an official change in the requirements as set forth in Section 4.A.l.g of the AEC Technical Specifications, Appendix B, for the Turkey Point electric generating plant, Operating Licenses DPR 31 and 41.

As presently written, this Section of the Technical Specifications states that a one year study will be performed from July 1, 1973 to July 1, 1974.

The purpose of this study is to assess the potential effect on surrounding bodies of water of discharge from the plant under emergency conditions.

A written report is to be submitted to the AEC 60 days after completion of the study; i.e.,

on September 1, 1974.

This study has been funded and is being conducted by a qualified scientist at the University of Miami.

An unavoidable delay in the initiation of this work resulted both from our wish to have a relevant indicator species assayed and the already full schedule of the biology scientist expert in that partic-ular field.

Consequently, this study was started on October 1, 1973 rather than July 1, 1973 as originally anticipated.

The one year of study will, therefore, be complete on, October 1, 1974.

This letter is a request that we be permitted to submit the results of this program to you by written report on November 1, 1974 rather than the present required'eptember 1,

1974 deadline.

Your favorable consideration of this request will be much appreciated.

Very truly yours,

) 4 De A~Q Robert E. Uhxig Director of Nuclear Affairs APPROVED:

REU:nch cc:

Mr. Jack R.

Newman E. A.

domat Executive Vice President 8-GULATORYDOCI~>1 T EHEL I

G BUILD FLORIDA

I

STATE OF FLORIDA )

)

COUNTY OF DADE

)

E. A. ADOMAT, being first duly sworn, deposes and says:

That he is an ExecutiveiVice President of Florida Power 6 Light

Company, the Licensee",herein; That he has executed the for'cgoing instrument; that the statements made in this said instrument are true and correct to the best of his knowledge, information and belief; and that he is authorized to execute the instrument on, behalf of said Licensee.

E. A. Adomat Subscribed and sworn to before me this 'F20' 'ay of ' '974 Notary.Publ in and for the County.of Dade,, Stat of Florida NQTARY PUBLIc sTATE QF FLoRIDA AT lARGE MY COMMISSION EXPIRES FEE 9, 1F/7 ireS s BONDED THRU GENERAL INSURANCE UNDERWRITERS

s-C I

I

'R I I

"a rr

)h I

I e

V 1t g )