Letter Reporting Abnormal Occurrence No. 251-75-4, Supplemental Report No. 2 of Lateral Restraints for Spent Fuel Racks Broken, in Unit 4 on 3/12/1975
ML18227A452
Person / Time
Site: Turkey Point  
Issue date: 08/05/1975
From: Schmidt A
Florida Power & Light Co
To: Rusche B
Office of Nuclear Reactor Regulation
References
Download: ML18227A452 (6)


Text

(TEMPORAR Y FORM) c'

)

MoONTROL NO:

FILE XNCIDENf REPORT FXL=

~OMp'lorida."o:ser ci l.ignt i;o.

,i)iami, i.'la.'.

D, Schmidt DATE OF DOC 8>>5-75 DATE REC'D LTR 5-9-/0 TWX RPT OTHER henard C. tcusche ORIG 1 Sign d

CC OTHER SENT AEC PDR SENT LOCAL PDR ASS

='SCR IPTION:

UNCLASS PROPINFO INPUT NO CYS REC'D ENCLOSURES:

DOCKET NO:

>0-'<<>1 I<<normal occurrence l />-4, on 3-12-75,..

~ ~

irni"hing Supplementary t(eport 0 2--'Lateral straints For Spent Fuel l<a'cps <<<<rolcen...".

~.

NAME i.uraicij Poin't 9 4 FOR ACTION/INFORMATION VGi<

5 / 0 I fLER (L)

IJ/ Copies

.ArIIC (L) 0/ Cooies inn (L) if/ Copies IJIEL (L}

V/ Copies SCHWEf JCER (L)

. W/ Cof'>ies STOLZ (L)

W/ Cooies VASSALLO (L)

W/ Copies r Unr LE (L)

DW/ Copies ZIEMANN(L)

W/ Copies DICKER (E)

W/ Cooies KNIGHTON (E)

W/ Copies YOUINGBLOOD W/ Copies REGAN (E)

W/ Copies

~LEAR (L)

W/ Copies SPELS W/ Copies (E)

W/ Copies INTERNAL DISTRIBUTION TEGH RFvIEw

<C I'D I< 'SCHROI=DE n

<<C, ROOiVi P.b06A

~IACCARY

)SSI CK/STAF F KNIGHT

<SE PAWLICK I AMBUSSO SHAO JYD

"'"'<<STE LLO

)Ofay E (L)

-""-<<HOUSl ON

YOUNG (L)

-~'<<NOVAK

OVHOLT (L)

<<ROSS JI LER (L) (Lir)

<<IPPOLITO COLLINS PTEDESCO NlSL J.

COLLXI></l'-

f:)

VOLLMEn EELE DFINTON

~GRIMES GAMM ILL KASTNEn BALLAf<D SPAflG LE R ENvl RO MULLER.

DICKER KNIGHTON YOUNG B LOOD BEGAN PROJEcT LDR HAHLESS LIC ASST R. DIGGS ILI H. GEAnlN (L)

E. GOULf3OURNE (L)

r. KREUTZER. (E)

J., LEE (L)

M. RuS1113ROOZ. (r.)

'. REED (E)

M. SERVICE (L)

S. SHEf'PARD (L)

M. SLATER (E)

H. SMITH (L)

<<S. TEETS (L)

G. WILLIAiViS(E)

V. WILSON (L)

n. INGRAM (L)

II.

DUN~CAN A/T IND

~

BRAITiViAf'J.

SA LTZMAI J ME LTZ P LAlx MCDOiIJALD CHAPMAiN DUBF (Ltr)

E. COUPF PETERSON HART F I E LD (2) m KLECKER EISENHU.r

'WIGGINTOiN

~ F.

MILLI~'~~IS

~ )1ANii EXTERNAL DISTflll3UTIOIIJ LOCALPDR 1 IC (ABERNATHY)

(1)(2)(10) NATIONALLABS NSIC (BUCHANAN) 1 W. PENNINGTON, Rm E.201 QT nSLB 1

CONSULTANTS Nvivton An<ferson NEWM ARK/BLUME/AGBAH IAN i-hens sE;<r To Llo,,ssT

'> SEND 0;fLY 'iEA DAY REPORTS PD n.sAN/LA/NY 1 BROOKHAVEN NAT LAB 1 G. ULHIKSON, Oni J L 1 AGMED (RUTH GUSSiMAN)

Rm B-127.GT 1

J. D. RUNKLES, Rm E-201 GT

/

e i,nIY0 I egMIAILIA~ 33, jl P'ltI 0OX 013100, MIAMI, FLORIDA 33101 AA FLORIDA POWER EI LIGHT COMPANY August 5, 1975

~u,%>>>s-~

M'04( 0 Cl~ I40 4

0040 Mr. Benard C. Rusche, Director Office of Nuclear Reactor Regulation~

U.

S. Nuclear Regulatory Commission Washington, D.

C.

20555

Dear Mr. Rusche:

ABNORMAL OCCURRENCE NO. 251-75-4 TURKEY POINT UNIT NO.

4 DATE OF OCCURRENCE:

MARCH 12, 1975 SUPPLEMENTARY REPORT NO.

2 LATERAL RESTRAINTS FOR SPENT FUEL RACKS BROKEN A.

BACKGROUND In early March, several stainless steel seismic restraint springs installed on Unit 4 spent fuel racks were found broken.

The situation was reported as Abnormal Occurrence No. 251-75-4.

Our intended corrective action at that time was to replace the broken springs.

However, during sub-sequent inspection, more broken springs were found, therefore, it was decided to replace all Unit 4 springs with new springs fabricated according to approved procedures.

On May 1, we issued a Supplementary Report to inform you we had completed Unit 4 seismic spring replacement.

The initial Unit 4 Abnormal Occurrence report also noted the discovery of a similarly broken spring on a Unit 3 spent fuel rack.

In late March, when the magnitude of the Unit 4 spring problem increased, it was decided to expand the Unit 3 inspection to determine if a similar problem existed there.

B.

UNIT NO.

3 INSPECTION RESULTS An underwater television inspection of Unit 3 spent fuel rack seismic restraint springs has been conducted.

The inspection included springs mounted on all four sides of the spent, fuel racks.

Of 70 springs inspected, 18 were cracked and 7 were possibly cracked.

Thereforei we have concluded that all Unit 3 springs will have to be replaced and have 8$ Pg HELPING BUILD FLORIDA

r l"

'P

/.

~

I Mr. Benard C.~Rusche, Director Page Two August 5I 1975 terminated the inspection without looking at the remaining 46 springs.

NRC inspectors who were subsequently on site received this information verbally and included it as a

part of IE Report Nos.

50-250/75-8 and 50-251/75-8.

C.

CORRECTIVE ACTION All Unit 3 spent. fuel rack seismic restraint springs will be replaced with new springs currently on hand at Turkey Point.

The new springs were fabricated similarly to the Unit 4 replacement springs.

Replacement work will be con-ducted from above the spent fuel pool using remotely operated tools which are now being manufactured.

Work will begin following tool manufacture and development of acceptable replacement procedures.

When Unit 3 seismic spring replacement has been completed, a supplementary report will be submitted.,

Very truly yours, D. Schmidt Vice President Power Resources MAS/cpc cc: