Letter Reporting Unusual Event Nos. 250-75-2 & 251-75-2 of Malfunction of Spent Fuel Pit Cooling Pumps, in Units 3 & 4
ML18227A450
Person / Time
Site: Turkey Point  
Issue date: 08/18/1975
From: Schmidt A
Florida Power & Light Co
To: Rusche B
Office of Nuclear Reactor Regulation
References
Download: ML18227A450 (6)


Text

"'"m: "'

(TEMPORARY FORM)%I' CONTROLNO:~

FILE. INCIDENT REPORT FlL FROM: Florida Power

% Light Co..

Miami,'lorida A.D. Schmidt 8 8 DATE OF DOC DATE REC'D TWX RPT OTHER TO:

CLASS UNCLASS PROPINFO ORiG

\\

1 Signed INPUT CC OTHER NO CYS REC'D

'1 m

T SENT LOCAL PDR DOCKET NO:

50-25 DESCRIPTION:

Letter trans the f'ollowing.R......

ENCLOSUR ES:

Unusual Event P 75-2, on 5-12-75, Concerning Malt'unction oi'. Spent Fuel Pit Cooling Pump.....

PLANT NAME:

Turkey ~-Point jp 3 5 4 R

(1 Copy Enclosure Received.)

R BUTLFR (L)

Ml/ Copies CLARK (L)

W/ Cooies PARR (L)

W/ Copies KNIEL (L)

W/ Copies

'OR ACTION/INFORMATION SCHWENCER (L)

ZIEMANN (L)

REGAN (E)

Ml/ Copies W/ Copies W/ Copies STOLZ (L)

DICKER (E)

~EAR (L) ll W/ Conies W/ Cooies

'QCopies ACKNOWQEDQED VASSALLO (L)

KNIGHTON (E)

SPE LS W/ Copies Ml/ Copies Ml/ Copies

%/ Copies W/ Copies W/ Copies DD N0~ H'EM INTERNALDISTR I BUTION IL-TECH REVIEW

~NING PDR

~SCHROEDER OGC, ROOM P-506A PMACCARY GOSS ICK/STAF F KNIG HT

~CASE PAW LICK I GIAMBUSSO SHAO BOYD

  • "~STE LLO MOOR E (L)

<c".:

HOUSTON DEYOUNG (L)

"'"~NOVAK SKOVHOLT (L)

~ROSS GOLLER (L) (Ltr)

~ IPPOLITO P. COLLINS

/TED ESCO DENISE J.

COLLINS REG OPR LAINAS

~FII L 5 REGION (2)

BENAROYA

~.I<<PC/PE (S)

~VOLLMER STEELE DENTON

'GRIMES GAMMILL KASTNER BALLARD SPANG LFR ENVIRO MULLER DICKER KNIGHTON YOUNGB LOOD REGAN PROJECT LDR HARLESS EXTERNAL DISTR LID ASST R. DIGGS (L)

H. GEARIN (L)

E. GOULBOURNE (L)

P. KREUTZER. (E)

J. LEE (L)

RUSHBROOK (L)

S. REED (E)

M. SERVICE (L)

S. SHEPPARD (L)

M. SLATER (E)

H. SMITH (L)

S. TEETS (L)

G. MIILLIAMS(E)

V. WILSON (L)

. ~. INGRAM (L)

~*

I BUTION A/T IND.

BRAI1 iVIAN SALTZMAN MELTZ PLANS MCDONALD CHAPMAN DUBE (Ltr)

E.

COUPE'ETERSON HARTFIELD (2)

~ KLECI'ER EISENHUT

'WIGGINTOiU

~ F. llXLLXP~IS

<<Hd( T((i r'N(

LOCAL PD R Miami Flor1.da

.. ~1 TIC (ABERNATHY)

(1)(2)(10) NATIONALLABS

~l NSIC (BUCHANAN) 1 W. PENNINGTON, Rm E-201 GT 1-ASLB

~

1 CONSUI TANTS 1 Newton Antferson NEWMARK/BLUME/AGGABIAN

~a-ACRS SEi"I'O LX

',SST R. Ingram

>> SEND ONLY TEN DAY REPOiRTS 1 PD R-SAN/LA/NY 1 BROOKHAVEN NAT LAG 1 G. ULRIKSON, ORNL.

1 AGMED (RUTH GUSSMAN)

Rm B-'127 GT '

~ J. D. RUNKLES, Rm E-201 GT

~

~

J

r 0 Ii at0y 0

~o ~~

cd 0

'~T.

0 r

P 0 BOX 013100~ MIAMI~ FLORIDA 33101 FLORIDA POWER Bt LIGHT COMPANY August 18, 1975.

Mr. Benard C. Rusche, Director Office of Nuclear Reactor Regulation U. S, Nuclear Regulatory Commission Washington, D.

C.

20555

'ear Mr. Rusche:

UNUSUAL EVENT NOS. 250-75-2 AND 251-75-2 TURKEY POINT UNIT NOS.

3 AND 4 MGFUNCTION OF SPENT FUEL PIT COOLING PUMPS A.

DESCRIPTION OF EVEN S During the past four months, the Unit 3 Spent. Fuel Pit (SFP)

Cooling Pump has malfunctioned twice and the Unit 4 SFP Cooling PI mp has malfunctioned three times.

The pumps are Ingersoll-Rand Type LP pumps which have a discharge flow rate of 2300 gpm and a discharge head of 125 feet at the design speed of 1780 rpm.

A brief description of each event follows:

1.

On April 12, 1975, the radial bearings seized on the Unit 4 pump.

The pump was dismantled and found to have overheated radial bearings, an overheated and extensively damaged mechanical

seal, and a sheared pump shaft.

The pump was repaired and tested satisfactorily.

2.

On April 29, the thrust bearings seized on the Unit

'4 pump.

The pump was dismantled and found to have overheated thrust bearings and a galled thrust bearing housing.

The bearing and housing were replaced and the pump tested satisfactorily.

3.

On May 17, the Unit 4 pump radial bearings seized again.

The pump shaft was also broken at the threaded end.

The pump was repaired and tested satisfactorily.

4.

On July 3, the Unit 3 pump malfunctioned.

The pump wad dismantled and the shaft was found to be broken

't the keyway.

The pump was repaired and tested satisfactorily.

HELPING BUILQ FLORIQA

Mr. Benard C. Rusche, Director Page Two August 18,"1975 B.

On July 27, the thrust bearings seized on the Unit 3 pump.

The pump was dismantled and found to have overheated thrust. bearings.

The bearings were re-placed and the pump tested satisfactorily.

APPARENT CAUSE AND ANALYSIS OF EVENT The exact cause of the SFP Cooling Pump shaft and bearing failures has not been determined.

However, it is suspected that they may have resulted from excessive internal stress created by pump

.cavitation.

The SFP cooling system is shown in FSAR figure 9.3-3. 'alve number

820, "ocated at the SFP heat exchanger outlet, is called the "system discharge line control valve".

Operating personnel have verified that pump operation is very noisy, indicating cavitation, whenever this valve is more than 50$ open.

Therefore, we have conducted an evaluation 'of system performance to determine the optimum position of the system discharge line control valve.

Evaluation results indicate that we can avoid cavitation and still provide cooling system flow to meet the current SFP heat transfer demand by administratively limiting the valve position to about 25% of fully open.

C.

CORRECTIVE ACTION

'or each event, the immediate correct've ac"ion was to imple-ment Off-Normal Operating Procedure 3508.1,. entitled, "SFP COOLING SYST.M, Failure of SFP Cooling Pump".

This procedure provides instructions for cooling the spent fuel pool when the normal SFP Cooling Pump is inoperable.

Operators have been instructed to maintain the system discharge line control valve 25% open.

Such action should preclude cavitation and reduce the probability of further SFP 'Cooling Pump failure.

In addition, we are proceeding with the engineering work necessary to procure and install a redundant cooling pump in each SFP cooling system.

Very truly yours, A. D. Schmidt Vice President Power Resources MAS/cpc cc: