COL Docs - SNC Response to Uin Comment Status Sheet for August 16, 2018 Public Meeting
ML18226A050
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 08/14/2018
From:
NRC
To:
NRC/NRO/DLSE/LB4
References
Download: ML18226A050 (3)


Text

Vogtle PEmails From: Hoellman, Jordan Sent: Tuesday, August 14, 2018 7:49 AM To: Vogtle PEmails

Subject:

SNC Response to UIN Comment Status Sheet for August 16, 2018 Public Meeting Attachments: SNC responses for 1 2 on UIN ICN comment status sheet for July 19 call (003).docx Please see the attached revised SNC response to item 1 (MOV qual) for discussion at the 8/16/18 public meeting.

Please note that item 1 was previously discussed at the 7/19/18 public call.

1

Hearing Identifier: Vogtle_COL_Docs_Public Email Number: 342 Mail Envelope Properties (SN6PR0901MB2366C7AEFE4C597432FE36AAD5380)

Subject:

SNC Response to UIN Comment Status Sheet for August 16, 2018 Public Meeting Sent Date: 8/14/2018 7:48:55 AM Received Date: 8/14/2018 7:48:59 AM From: Hoellman, Jordan Created By: Jordan.Hoellman2@nrc.gov Recipients:

"Vogtle PEmails" <Vogtle.PEmails@nrc.gov>

Tracking Status: None Post Office: SN6PR0901MB2366.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 203 8/14/2018 7:48:59 AM SNC responses for 1 2 on UIN ICN comment status sheet for July 19 call (003).docx 24900 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received:

VOGTLE ICN/UIN ISSUES TRACKING SHEET Date ITEM ICN TOPIC ITAAC ISSUE Licensee Comment

  1. UIN INDEX #

7/12 1 UIN MOV V3 / V4 The determination basis should also Regarding ITAAC 53, 114, 154, 248, 309, and 384, SNC Qual. 114, include reference to production 154, valve tests required by the ASME suggests the following language changes:

248, QME-1-2007.

248, The motor-operated valves in VEGP Unit 3 and Unit 4 309, 384 COL Appendix C Table 2.1.2-1 are verified by type tests in accordance with ITAAC 2.1.02.12a.i section i) above, to demonstrate the capability of the valves to operate under their design conditions. The EQ Reports in Attachment A identify the equipment mounting employed for the testing and the specific conditions tested.

1