ML18220A925

From kanterella
Jump to navigation Jump to search
0 to Updated Final Safety Analysis Report, Section 17, Quality Assurance
ML18220A925
Person / Time
Site: Salem  PSEG icon.png
Issue date: 05/11/2018
From:
Public Service Enterprise Group
To:
Office of Nuclear Reactor Regulation
Shared Package
ML18220A885 List:
References
LR-N18-0053
Download: ML18220A925 (10)


Text

Section 17.1 17.2 SGS-UFSAR smCTION 17 QUALITY ASSURANCE TABLE OF CONTENTS QUALITY ASSURANCE DURING DESIGN AND CONSTRUCTION PHASES QUALITY ASSURANCE DURING THE OPERATIONS PHASE 17-i 17.1-1 17.2-1 Revision 23 October 17, 2007

I 17.2-1 I

SGS-UFSAR Title Deleted LIST OF TABLES 17-ii Revision 23 October 17, 2007

Figure 17.2-1 Deleted 17.2-2 Deleted 17.2-3 Deleted 17.2-4 Deleted SGS-UFSAR LIST OF FIGURES Title 17-iii Revision 23 October 17, 2007 I

SECTION 17 QUALITY ASSURANCE 17.1 QUALITY ASSURANCE DURING THE DESIGN AND CONSTRUCTION PHASES This section is not applicable since these phases are completed.

See Appendix D of Amendment 43 to FSAR for the Quality Assurance Program applicable during design and construction.

17.1-1 SGS-UFSAR Revision 6 February 15, 1987

17.2 QUALITY ASSURANCE DURING THE OPERATIONS PHASE The licensee is responsible for the operation and maintenance of Salem/Hope Creek Generating Stations.

These activities are presently conducted in accordance with the NRC approved Quality Assurance Topical Report {QATR} which describes the formal and comprehensive control methods established to assure compliance with 10CFRSO, Appendix B.

The QATR describes how the Quality Assurance Program is to be functionally implemented with due regard to the safety and health of the public and the personnel on site.

The Salem/Hope Creek Quality Assurance Program as described by the QATR is incorporated herein by reference.

17.2-1 SGS-UFSAR Revision 23 October 17, 2007

TABLE 17.2-1 This Table Has Been Deleted 1 of 1 SGS-UFSAR Revision 23 October 17, 2007

THIS FIGURE HAS BEEN DELETED PSEG NUCLEAR L.L.C.

SALEM GENERATING STATION NUCLEAR ASSESSMENT SALEM UFSAR-REV. 23 October17,2007 SHEET1 OF1 FIG.17.2-1

THIS FIGURE HAS BEEN DELETED.

PUBLIC SERVICE ELECTRIC I GAS COMPANY SALEM NUCLEAR GENERATING STATION Updated FSAR Rev. 9. July 22. 1989 Fig. 17.2*2

THIS FIGURE HAS BEEN DELETED.

PUBLIC SERVICE ELECTRIC I GAS COMPANY SALEM NUCLEAR GENERATING STATION Updated FSAR Rev. 9. July 22. 1989 Fig. 17.2*3

THIS FIGURE HAS BEEN DELETED.

PUBLIC SERVICE ELECTRIC & GAS COMPANY SALEM NUCLEAR GENERATING STATION Updated FSAR Rev. 9. July 22. 1989 Fig. 17.2-4