NRC DISTRIBUTION i=Oil f'ART.)0 DOCKET MATERIAL ITEMPOIIAI1YFORMI CONTROL NO'
~
FROM American Elec; Power Corp New York, N..Y.
R.t), Hunter DATE OF DOC DATE R EC'D LTR TWX RPT OTHER TO'.C.
Cook ORiG
'one.
CC 1
OTI-IER S ENTB IIC PDR~
SENT LOCAL PDR 'XXX CLASS UNCLASS XXX PROPINFO INPUT NO CYS REC'D 1
DOCI<ET NO:
50-315 DESCRIPTION:
Letter infopning that modification of test wi
'e scheduled for completion durning the April
,1976 outage.......
I
.(.1 Copy Received)
ENC LOSUR ES:
1 PLANT NAME Cook 8' ACTION/
FOR INFC:RMATION BUTLER (L)
W/ Copies CLARK (L)
W/ Copies PARR (L) opies IEL (L)
W~opies SCHWENCER (L)
W/ Copies STOLZ (L)
W/ Copies VASSALLO (L)
W/ Copies PURPLE (L)
W/ Copies ZIEMANN(L)
W/ Copies DICKER (E)
V opies NIGHTON (E)
W/PCopies
~
YOUNGBLOOD (E)
W/ Copies REGAN (F)
REID(L)
W/ Copies W/
COPIES LEAR (L)
,>,o P'ACKNOWLEDGED W/ Copies LP? f DP NO ggMPVg E
FILF C
OGC, ROOM P-506A GOSSI CK/Sl AF F CASE
~CPi'D gaeWRE (L) 43EYOUNG (L)
SKOVHOI.T (I }
GOLLER (L} (Ltr)
P. COLLINS DENISE RLG QPR
~N 5 REGION (2)
HIPC TECIR REVIFW SCHROEDER MACCARY KNIGHT PAWLICKI SHAO STELLO HOUSTON NOVAK ROSS IPPOLITO TEDESCO J, COLLI?lS LAINAS BENAROYA VOLLMER INTERNAI DISTRIBUTION A/T IND
~
BRAITMAN SALTZMAN ME LTZ PLAN ONALD CHAPMAN DUBE (Ltr)
E. COUPE PETERSON HARTFIELD (2) l<LECKER E ISE Nl-IUT WlGG I NTON K. PARRXSI?
L DENTON LIC ASST GRIMES R. DIGGS (L)
GAMMILL H. GEARII~ (L)
KASTNER L=. GOULBOURNE (L)
BALLARD P. KIREUTZER (E)
SPANGLER J. LEF (L)
M. RUB!fBROOQL)
ENVIRO S. BLED (E)
MULLF.R c-M~I=RVICE (L)
DICKER S. SHEr PARD (L)
KNIGf-ITON ~~ ATER (E)
YOUNGBLOOD H. SK'IITII (L)
REGAN S. TEETS (L)
PROJECT LDR, G. WILLIAMiS(E)
V, WILSONi(L)
I<@R'BEE R. INGR'~4 ILI
'H.
DUIl~CAII EXTERNAL DISTR IBUTION LOCALPDR ¹~laseph, Hichigan 1-I IC (AOEr.tNATI1Y)
(1)(2)(10) NATIONALLAOS 1 NSIC (BUCHANAN) 1 W. PENNINGTON, Rm E.201 GT 1 ASLO 1
CONSULTANTS 1 Newton Anderson NEWM ARK/OLUME/AGOAOIAN ACRS I IOLDING,'SENl 1,P DR-SAN/LA/NY 1 BROOKHAVEN NA I LAI3 1 G. ULRII<SON ORNL
~fl A
I III P
l;
~aU
~ (3 'g
~ e
~v 7 t
,lq)
~
~
'II f"l*,l.t'.o." ',~,>r.i'i'i'
~~.'"l
'~<>i
')";
l'l)$
g I )
ill OV "hll
+$ )p gf"
'1 p 'g
~ Oe J
~
~ 1'3 a,,
l ~~ Qgll j' 3') ',> +~
g*
ANFRICAiw ELECTRIC PO 2
&ay,+t;~ rk, Z. X (2
22.48 e
Co ation'iggg 8
O4 fats a ROBERT S. HUNTER VircPrrriChnt-Xurlcar Enginrrring Donald C.
Cook Nuclear Plant Unit No. 1 Startup Test Report Docket,No.
50-315 License No. DPR-58 dA Wl g
@ot.7.i'I<
nuary 15, 1976
'I.t',I.~>>
'i<>Q j.& f976 ~
g g, gucLKAn r ~~~
con"~'. +~
g ingle Socllon U.S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137 Attention:
Mr. J.
G. Ke ler Re ional Director
'Gentlemen:
On October 15,
- 1975, we transmitted to you the Startup Test Report for the Donald C. Cook Nuclear Plant Unit No. 1.
The number of copies sent to you and others in the Nuclear Regulatory Commission were as required by Regulatory Guide 10.1.
Regulatory Guide. 1.16 requires that supplementary reports be submitted every three months until the completion of the startup test program.
Since there vere five tests that vere not completed and included in the Startup Test Report dated October 15, 1975, we are hereby informing you of our
.progress over the past three months.
We completed one of the five remaining tests
,"Shutdown Prom
.Hot Shutdown Panel" (Startup Test Aeport Section 7.5.1),
on October 11, 1975.
A draft of the test report for this test has been prepared by the plant staff and revieved by our engineering department.
Comments are being incorporated and the report itself will be transmitted
. to you shortly.
a f
P I
lf' p 4f i'
Mr. J.
G. Keppler January 15, 1976 None'of the other four tests have been conducted yet. It is anticipated that several of them will be conducted after a number of required modifications are made.
These modifi'cations are now scheduled for completion during an April 1976 outage.
Very truly yours, RSH:mam 7
R. S.
H te un r
Vice President-Nuclear Engineering cc:
John Tillinghast D. F. Knuth, Director NRC IE W.
G. McDonald, Director, NRC M.I.P.C.
R. A. Benedict, NRC G. Charnoff R. C. Callen R. J. Vollen P.
W. Steketee R. Walsh R.
W. Jurgensen - Bridgman
e