NRC liTRIBUTION FOR PA!IT.!0 COCK I (1 EMiPOBABY FORM)
'I 'I MATERIAL
~
coNTnoL No: W<~<J FILE'ROM:American Electric Power New: York, N;Y.'ATEOF DQC DATE R Ec'D LTR TAX BPT OTI-IER TO:
Bernard C. Rusche ORIG 1 Signed Cc OTHER 29 SENTNr.c PDn SENT LOCAL PDR-CLASS UNCLASS P Bof'NFO INPUT NO CYS REC'D 30 DOCKET NO":
50-315 DESCRIPTION:
I
,Ltr. trans the S~llowing...I..
, ACKNp~@~
I
- PLANT NAME ookn 1 & 2 ENCLOSURES:
il'.hree'eports:
'-"Long Term Evaluation of the Ice Condenser 3;System--Iceoss Calculations Resulting from
!the 7>>75 & 10-75.ice weighing Program:..."
'-"LongTerm'Evaluation of Ice.Condenser System Results of the 3-75 Ice Weighing"Program..'."
3'-'Long Te'rm Evaluati'o'n of tHe..Ice Cond'enser System-Results of the 12-74 Initial Ice Weighing Program..."
FOR Aci'ION/INFC:RMATION VCR 12-31-75 BUTLER (L)
W/ Copies CLARK (L)
W/ Copies PABB (L)
V/ Copies NIEL (L)
~ W/ Copies SCHiVENCER (L)
W/ Copies sToLz (L)
W/ Copies VASSALLO (L)
W/ Copies PURPLE (L)
W/ Copies ZIEMANN(L)
W/ Copies Dici<En (E)
W/ Copies KliIGHTOij (E j W/ Copies, YOUNGBLOOD W/ Copies nEGAN (E)
W/ Copies LEAR (L)
W/ Copies SPU'S W/ Copies (E)
Lmf W/ Lopies IREID(L)
W/
COPIES INTERNALDISTRIBUTION i IC I'DB 3C, ROOM P.506A v~OSS I Cl</STAF F CASE OYD iCIORE (L)
DEYOUNG (L)
SKOVI.IOLT (L)
GOLLEfh (I ) (Ltr)
.f'. COLLINS DE f9 ISF.
JKG OPB (34 V'FIILF @ RE~N (2) lfXPC fECI-I ALVIB"I.
SCHROEDER MACCABY KNIGHT
~AEVI I C K I Sf.IAO STE LLO HousroN NOVAK ROSS IPPO LITQ TEDFSCO S,COLl'INS LAIN AS BENAROYA VOLLMEB LIC ASST R. DIGGS (L)
H. GEABIN {L)
E. GOULBOURNE (L)
P. KnEUi.zr:i: (E)
J. LEE (L)
Mi. RU"";.IBROOK{L)
ENVIBO' RF f=D (E)
MULLER
-~'. SEnviCE (L)
DiCKEn S. SHEPPARD (L)
KNIGHTON M. SLA I En (E)
YOUNGBLOOD H. SMI I'H (L)
BEGAN S. TEE1S (L)
PROJECT LDB G. WILLIAMiS{E)
~d ~~
- v. wiLSQN (I.)
A AA~..ESS R. I[gC'B i/I (L)
H.
DUNCAN {ig EXTLr<NALDISTRIBUTION DENTON G B IMES GAMMILL KASTNEB BAI I ARD SPANGLER A/T IIIIL'>.
SRA! ri!iAN sALrzMAri MELrz P LAiNS MCDOI<AI D CHAPMAN DUDE (Ltr)
E. COUPE PETERSON HARTFIELD (2)
KLECKER EISENHUT WIG G I N TON I OCAL PDB
~
~- *ric {ABERNiATH (1)
+- NSIC (BUCHANAN) 1 ASLB 1 Newton Anderson ifip ACR S i!OO05KI/SENT
)(10) NATIONALLABS 1
W. I'ENNINGTON, Rrn I=-201 GT CONSU LTAN1'S'EWMABK/0LUil/1E/AGBABIAN 1 PDB SAN/LA/NY 1 BBQQKHAVENNAT LAB 1 G. U LR I KSON 0 B N L
">>(()'ijj),~(,
~'
AMERICAN Ei ECTRIC POVIER Servi +&dr)'oratI' r
2 Broadtgtty, New York, Y. f0004 (212) 422.4800 t J g.C ROBERT S. HUNTER Vice PrrafCrn!-ÃnrlrnrEngineering rp,(X eQ(7 I 1 P cP Indiana 8 Michigan Power Company Donald C. Cook Nuclear Plant Unit 1
December 17, 1975 Docket No. 50-315 DPR No. 58 Mr. Benard
- Rusche, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Mr. Rusche:
-i'4 g$t'p~
oEcpgs i/,I Attached please find 30 copies 'each of the following reports:
1.
"Long Term Evaluation of the Ice Condenser System - Results of the December 1974 Initial Ice Weighing Program,"
by J.
G. Feinstein, dated March 1975 (Revised December 4, 1975).
2.
"Long Term Evaluation of the Ice Condenser System - Ice Loss Calculations Resulting from the July 1975 and October 1975 Ice Weighing Program,"
by J.
G. Feinstein, dated November 1975 (Revised December 9, 1975).
3.
"Long Term Evaluation of the Ice Condenser System - Results of the March 1975 Ice Weighing Program,"
by J.
G. Feinstein, Dated June 1975.
The above reports contain the results of the ice weighing program being carried out at the Donald C.
Cook Nuclear Plant Unit 1'on the ice condenser containment system.
These reports cover the period from initial loading to the latest ice weighing i'n October 1975.
This program is a con-tinuing evaluation of long-term ice storage and is being conducted by American Electric Power Service Corporation and the Indiana 8 Michigan Power Company.
This information is being sent to you in response to the request of members of your staff, and in the interest of fulfillingthe Advisory Committee on Reactor Safeguards recommendation, that the Donald C.
Cook
II I
~
~
Nr. Benard Rusche December 17, 1975 Nuclear Plant Unit 1 be made the subject of a continuing series of monitoring and evaluation measures, including assessment of the retention and behavior of the ice within the condenser.
Very truly yours, RSH kb Enclosures R. S. Hunter Vice President - Nuclear Engineering cc:
John Tillinghast Gerald Chat noff R. Malsh R. J. Vollen R.
C. Callen P. H. Steketee R.
l<. Jurgensen
TiP. >
4'r,
~
I u
V 0I
~
1
~(
~ e