Response to Letter of 11/28/1977 Concerning Limiting Heatup Rate of Pressurizer, Advising, Operating Record Review Indicates Maximum Rate, with All Heaters in Service, Was 67.5oF/hour
ML18219D842
Person / Time
Site: Cook  
Issue date: 01/26/1978
From: Tillinghast J
Indiana Michigan Power Co, (Formerly Indiana & Michigan Power Co)
To: Case E
Office of Nuclear Reactor Regulation
References
Download: ML18219D842 (6)


Text

REGULATORY INFORMATION DISTRIBUT'ION SYSTEM (RIDS>

DISTRIBUTION FOR INCOMING MATERIAL 50-315 REC:

CASE E

G NRC ORG:

TILLINGHAST J IN Cc MI PWR DOCDATE: 01/26/78 DATE RCVD: Oi/31/78 DQCTYPE:

LETTER NOTARIZED:

YES COPIES RECEIVED

SUBJECT:

LTR 1

ENCL 0

RESPONSE

TO NRC"S LTR DTD 11/28/77 CONCERNING THE LIMITING HEATUP RATE OF THE PRESSURIZFR... ADVISING REQUIRED PRESSURIZER HEATUP RATE OF 100 DEGREES F/HOUR HAS NEVER BEEN EXCEEDED DURING THE COURSE OF ANY PLANT STARTUP... NOTORIZED 01/26/78.

PLANT NAME: CQOK UNIT 1

REVIEWER INITIAL:

XJM DISTRIBUTOR INITIAL:

DISTRIBUTION OF THIS MATERIAL IS AS FOLLOWS GENERAL DISTRIBUTION FOR AFTER ISSUANCE OF OPERATING LICENSE.

(DISTRIBUTION CODE A001>

\\

FOR ACTION:

BRANCH CHIEF'AVIS++LTR ONLY(7)

INTERNAL:

EXTERNAL:

REG F

++LTR ONLY(i)

++LTR ONLY<2)

HANAUER++LTR ONLY(l>

EISENHUT4 +I TR ONLY< 1 )

BAER++LTR ONLY(1)

GRIMES++LTR ONLY<1)

J.

MCGOUGH>+LTR ONLY(l>

LPDR'S ST.

JOSEPHr MI++LTR ONLY< 1 )

TIC4+LTR ONLY(l>

NSIC++LTR ONLY<1)

ACRS CAT B+4~LTR ONLY(16>

NRC PDR%%LTR ONLY(i>

OELD44LTR ONLY< 1)

CHECK4+LTR ONLY(i)

SHAO+4LTR ONLY<i)

BUTLER++LTR ONLY(i>

J.

COLLINS++LTR ONLY< 1)

DISTRIBUTION:

LTR 40 ENCI 0

SI ZE:

2P

%%%%%%0f 4%%%w%%%%4 SHE'D%%%%%%%%%%%%%%%

THE END CONTROL NBR:

780320011

0

~ ~

INDIANA II MICHIGAN POWER COMPANY P. 0. BOX 18 BOWI.ING GREEN STA'rION NEW 'll'OR K, N. Y, 10004 January 26, 1978 g

fly' rttrrrj >SSr0~+KO~

Donald C.

Cook Nuclear Plant Unit, No.

1 Docket No.

50 315 DPR No.

58 Mr. Edson G. Case, Acting Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Mr. Case:

This letter is in response to Mr. Don K. Davis'etter. of November 28, 1977 concerning the limiting heatup rate of the pressurizer.

We have conducted a review of our operating records at the Donald C.

Cook Nuclear Plant Unit No.

1 subsequent, to the receipt, of Mr. Davis'etter.

This review indicates that, the re-quired pressurizer heatup rate of 100 F/hour has never been ex-ceeded during the course of any plant startup.

The maximum heat-up rate, with all heaters in service, was 67.5 F/hour.

Plant operating procedures were revised to require a limit-ing pressurizer heatup rate of 100 F/hour, subsequent to noti-fication from Westinghouse.

Amendment No.

23 to the Unit, No.

1 Technical Specifications includes a revision to require the limit-ing pressurizer heatup rate of 100 F/hour.

Ver truly yours, JT em

'ce President Sworn and subscribed to before this ~<'~day of January, 1978 in New York County, New York CC:

Notary Public KATHY.FEND~Yt (see next page) "

No. 41-1606792 Qualitied in Queens Cou'nty Corti(iecto Iiied in New York Corrnty,'ommittron hrrprrcs rhrrrch 30,19'OOg g

~~o

~'~~ ~

I t

a P

~

Sh>

V

~

~ =

g d'

~

lr l

Mr. Edson C.

Case January 26, 1978 cc:

R.

C. Callen R. J. Vollen G. Charnoff P.

W. Steketee R. Walsh R.

W. Jurgensen D. V. Shaller Bridgman

~~

~4

~

(m~

~

4