ML18219D842
| ML18219D842 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 01/26/1978 |
| From: | Tillinghast J Indiana Michigan Power Co, (Formerly Indiana & Michigan Power Co) |
| To: | Case E Office of Nuclear Reactor Regulation |
| References | |
| Download: ML18219D842 (6) | |
Text
REGULATORY INFORMATION DISTRIBUT'ION SYSTEM (RIDS>
DISTRIBUTION FOR INCOMING MATERIAL 50-315 REC:
CASE E
G NRC ORG:
TILLINGHAST J IN Cc MI PWR DOCDATE: 01/26/78 DATE RCVD: Oi/31/78 DQCTYPE:
LETTER NOTARIZED:
YES COPIES RECEIVED
SUBJECT:
LTR 1
ENCL 0
RESPONSE
TO NRC"S LTR DTD 11/28/77 CONCERNING THE LIMITING HEATUP RATE OF THE PRESSURIZFR... ADVISING REQUIRED PRESSURIZER HEATUP RATE OF 100 DEGREES F/HOUR HAS NEVER BEEN EXCEEDED DURING THE COURSE OF ANY PLANT STARTUP... NOTORIZED 01/26/78.
PLANT NAME: CQOK UNIT 1
REVIEWER INITIAL:
XJM DISTRIBUTOR INITIAL:
DISTRIBUTION OF THIS MATERIAL IS AS FOLLOWS GENERAL DISTRIBUTION FOR AFTER ISSUANCE OF OPERATING LICENSE.
(DISTRIBUTION CODE A001>
\\
FOR ACTION:
BRANCH CHIEF'AVIS++LTR ONLY(7)
INTERNAL:
EXTERNAL:
REG F
++LTR ONLY(i)
++LTR ONLY<2)
HANAUER++LTR ONLY(l>
EISENHUT4 +I TR ONLY< 1 )
BAER++LTR ONLY(1)
GRIMES++LTR ONLY<1)
J.
MCGOUGH>+LTR ONLY(l>
LPDR'S ST.
JOSEPHr MI++LTR ONLY< 1 )
TIC4+LTR ONLY(l>
NSIC++LTR ONLY<1)
ACRS CAT B+4~LTR ONLY(16>
NRC PDR%%LTR ONLY(i>
OELD44LTR ONLY< 1)
CHECK4+LTR ONLY(i)
SHAO+4LTR ONLY<i)
BUTLER++LTR ONLY(i>
J.
COLLINS++LTR ONLY< 1)
DISTRIBUTION:
LTR 40 ENCI 0
SI ZE:
2P
%%%%%%0f 4%%%w%%%%4 SHE'D%%%%%%%%%%%%%%%
THE END CONTROL NBR:
780320011
0
~ ~
INDIANA II MICHIGAN POWER COMPANY P. 0. BOX 18 BOWI.ING GREEN STA'rION NEW 'll'OR K, N. Y, 10004 January 26, 1978 g
fly' rttrrrj >SSr0~+KO~
Donald C.
Cook Nuclear Plant Unit, No.
1 Docket No.
50 315 DPR No.
58 Mr. Edson G. Case, Acting Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Mr. Case:
This letter is in response to Mr. Don K. Davis'etter. of November 28, 1977 concerning the limiting heatup rate of the pressurizer.
We have conducted a review of our operating records at the Donald C.
Cook Nuclear Plant Unit No.
1 subsequent, to the receipt, of Mr. Davis'etter.
This review indicates that, the re-quired pressurizer heatup rate of 100 F/hour has never been ex-ceeded during the course of any plant startup.
The maximum heat-up rate, with all heaters in service, was 67.5 F/hour.
Plant operating procedures were revised to require a limit-ing pressurizer heatup rate of 100 F/hour, subsequent to noti-fication from Westinghouse.
Amendment No.
23 to the Unit, No.
1 Technical Specifications includes a revision to require the limit-ing pressurizer heatup rate of 100 F/hour.
Ver truly yours, JT em
'ce President Sworn and subscribed to before this ~<'~day of January, 1978 in New York County, New York CC:
Notary Public KATHY.FEND~Yt (see next page) "
No. 41-1606792 Qualitied in Queens Cou'nty Corti(iecto Iiied in New York Corrnty,'ommittron hrrprrcs rhrrrch 30,19'OOg g
~~o
~'~~ ~
I t
a P
~
Sh>
V
~
~ =
g d'
~
lr l
Mr. Edson C.
Case January 26, 1978 cc:
R.
C. Callen R. J. Vollen G. Charnoff P.
W. Steketee R. Walsh R.
W. Jurgensen D. V. Shaller Bridgman
~~
~4
~
(m~
~
4