ML18219D828
| ML18219D828 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 02/09/1978 |
| From: | American Electric Power Service Corp |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| Download: ML18219D828 (5) | |
Text
os/uv/vr T~
0 REGULATORY INFOHMATION DISTRIBUTION SYSTEH (RIDS)
DISTRIBUTION FOR INCOMING MATERIAL 50 3i5 I
.~ a REC:
ORG:
DOCDATE: 03/06/78 NRC Al"IER ELEC P4JR SVC DATE RCVD: 03/06/78 I
DOCTYPE:
OTHER NOTARIZED:
NO COPIES RECEIVED
SUBJECT:
LTR 0 ENCL i
'URNISHING LAST PAGE WHICH lJAS OMITTED FROM DOCUMENT CONTROl NO 7803702i3, SUBMITTED BY APPLICANT.
PLANT NAME; COOK UNIT f
's'sssss'.s's-:s~f9l>4H~>'H~4H~
DISTRIBUTION OF THIS MAT GENERAL DISTRIBUTION FOR AFTFR ISSUANC
< DISTRIBUTION CODE AOOi )
I REVIEWER INITIAL:
XJM DISTRIBUTOR INITIAL:
AL XS AS FOLLOWS <+++~~w>w+~www%w~w F OPERATING LICENSE.
FOR ACTION:
INTERNAL:
EXTERNAL:
BR C
~
JENCER4F i7 FNCL REG F ILE~~~W/ENC
'44~NCL HANAUER<F)~4J/ENC1 E ISENHUT~>~>W/ENCL BAER~~~~W/ENCL GRIMES~wW/ENCL J. 'CGOUGH~~~W/ENCL LPDR S ST.
- JOSEPH, MI4H~W/ENCL 1 IC<<~~W/ENCI NSI C~~~~W/ENCL ACRS CAT B4+W/i6 ENCL NRC PDR~H~W/ENCL OELD~>+LTR ONLY CHECK~~~W/ENCL SHAO+4W/ENCL BUTLER~~~~lJ/ENCL J COLLINS++W/ENCl DISTRIBUTION:
LTR 40 ENCL 39 SIZE:
iP 4 %<c%%%%%48%%4F%%%%%%4t 0F0HFC&05%4%0M Ct.%%0F%4.
CONTROL NBR; 780660027 4A-THE END
%%%%4f%%4f Hr+4%%%%%%%%%%%+%%%%%%%~
tO
$.,~
4 py II l CW r
J, v
h g
1
AMERICAN ELECTRIC POWER VICE CORPORATION gh DATE NEIL~
hlEMo To:
z) l1 7-l C
~.c From FORM OM 14 (ADAGIO)
ye/
/M
,~
so-ad=
pffft3 7 k
ATTACHMENT REFERENCES 1.
Exxon Nuclear Document XN<<76-51, "Donald C.
Cook Unit 1 LOCA Analysis Using WREM-Based PWR ECCS Evaluation Model (ENC WREM-II}," October,
- 1976, 2.
Exxon Nuclear Document, XN-76-51, Supplemen't 1,
"Flow Blockage and Exposure Sensitivity Study for D,C.
Cook Unit, 1 Reload, Fuel; Using ENC WREM-II Model,"
- January, 1977.
3.
Exxon Nuclear Document, XN-NP-76-51 (P)
Supplement 2 "Plow Blockage and Exposure Sensitivity Study for D.C.
Cook Unit 1 Reload Using ENC WREM-II Model," January, 1978.
4.
Revision 1 to Safety Evaluation Report on the Exxon Nuclear Company WREM-Based Generic PWR-ECCS Evaluation Model Update ENC-WREM-ll for Conformance to Requirements of Appendix K
to CFR 50 by the Office of Nuclear Reactor Regulation, January 5,
1977.
Cf/gpss
'~
g 1gp8 cJl o