Similar Documents at Cook |
---|
Category:Graphics incl Charts and Tables
MONTHYEARML22340A1952022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 10, Tables ML22340A1662022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 14.2, Tables 14.2.5-1 to 14.2.8-1 (Unit 2) ML22340A1672022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 14.1, Core and Coolant Boundary Protection Analysis (Unit 2) ML22340A1682022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 14, Table 14.0-1 (Unit 2) ML22340A1712022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 2, Tables ML22340A1542022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 5, Tables ML22340A1752022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 14.1, Tables 14.1.0-1 to 14.1.12-1 (Unit 2) ML22340A1732022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 14.A-G, Radiation Sources (Appendix 14A) (Unit 1) ML22340A2052022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 1, Tables ML22340A1972022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 7, Tables ML22340A2002022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 3, Figures (Unit 2) ML22340A1962022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 14.3, Figures 14.3.1-1A to 14.3.4-75 (Unit 1) ML22340A1722022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 14.2, Figures 14.2.5-1 to 14.2.8-8 (Unit 2) ML22340A1862022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 6, Tables ML22340A1802022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 3, Tables (Unit 1) ML22340A1812022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 11, Tables ML22340A1782022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 9, Tables ML22340A1772022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 14.1, Tables 14.1-1 to 14.1.13-1 (Unit 1) ML22340A1792022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 14.3, Figures 14.3.1-1A to 14.3.3-8 (Unit 2) AEP-NRC-2022-62, 1 to Updated Final Safety Analysis Report, Chapter 14.3, Reactor Coolant System Pipe Rupture (Loss of Coolant Accident) (Unit 1)2022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 14.3, Reactor Coolant System Pipe Rupture (Loss of Coolant Accident) (Unit 1) ML22340A2112022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 13, Tables ML22340A2082022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 14.4, Revision 19, Environmental Qualifications Analyses (Unit 1) ML22340A2072022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 3, Tables (Unit 2) ML22340A2062022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 14, Safety Analysis (Unit 2) ML22340A1312022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 14.3, Tables 14.3.1-1 to 14.3.9-23, 14.A.1-1 to 14.G-3 (Unit 1) ML22340A1432022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 14, Safety Analysis (Unit 1) ML22340A1282022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 14.3, Figures 14.3.4-76 to 14.3.9-25 (Unit 1) ML22340A1622022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 14, Figures 14.1-1 to 14.1.13-6 (Unit 1) ML22340A1352022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 8, Tables ML22340A1472022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 14.2, Figures 14.2.5-1 to 14.2.7-6 (Unit 1) ML22340A1612022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 14.4, Table 14.4.2-1A, Equipment Required to Shutdown Reactor (Unit 2) ML22340A1562022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 14.2, Tables 14.2.1-2 to 14.2.7-1 (Unit 1) ML22340A1492022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 14.1, Figures 14.1.0-1 to 14.1.12-2 (Unit 2) AEP-NRC-2021-44, Form OAR-1, Owner'S Activity Report2021-08-12012 August 2021 Form OAR-1, Owner'S Activity Report ML21125A6012021-04-19019 April 2021 0 to Updated Final Safety Analysis Report, Chapter 13, Tables ML21125A5102021-04-19019 April 2021 0 to Updated Final Safety Analysis Report, Chapter 2, Tables ML21125A5172021-04-19019 April 2021 0 to Updated Final Safety Analysis Report, Chapter 14.1, Tables 14.1.0-1 to 14.1.12-1 (Unit 2) ML21125A5202021-04-19019 April 2021 0 to Updated Final Safety Analysis Report, Chapter 9, Tables ML21125A5262021-04-19019 April 2021 0 to Updated Final Safety Analysis Report, Chapter 8, Tables ML21125A5472021-04-19019 April 2021 0 to Updated Final Safety Analysis Report, Chapter 5, Tables ML21125A5902021-04-19019 April 2021 0 to Updated Final Safety Analysis Report, Chapter 3, Tables (Unit 2) ML21125A5932021-04-19019 April 2021 0 to Updated Final Safety Analysis Report, Chapter 11, Tables ML16336A3952016-10-24024 October 2016 Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Table 2.2-19 ML16343A0542016-10-24024 October 2016 Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 11, Figure 11.6-2A, Fuel Assembly Flow Chart ML16336A3722016-10-24024 October 2016 Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Table 2.1-12 ML16336A4002016-10-24024 October 2016 Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Table 2.6-3 ML16343A0512016-10-24024 October 2016 Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 11, Figure 11.2-1, Integrated Exposure as a Function of Distance from Containment Building ML16336A3702016-10-24024 October 2016 Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Table 2.1-9 ML16336A3972016-10-24024 October 2016 Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Table 2.5-1 ML16336A3762016-10-24024 October 2016 Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 2, Table 2.2-2 2022-11-30
[Table view] Category:Letter
MONTHYEARIR 05000315/20230042024-01-31031 January 2024 Integrated Inspection Report 05000315/2023004 and 05000316/2023004 ML24004A1582024-01-19019 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0039 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) AEP-NRC-2024-01, Emergency Plan Revision 482024-01-0808 January 2024 Emergency Plan Revision 48 AEP-NRC-2023-56, Report Per Technical Specification 5.6.6 for Inoperability of Unit 1 Post Accident Monitoring Reactor Coolant (Loop 3 Cold Leg) Wide Range Temperature Recorder Thermal Sensor2023-12-20020 December 2023 Report Per Technical Specification 5.6.6 for Inoperability of Unit 1 Post Accident Monitoring Reactor Coolant (Loop 3 Cold Leg) Wide Range Temperature Recorder Thermal Sensor ML23352A3502023-12-19019 December 2023 Dc. Cook Nuclear Power Plant, Units 1 Biennial Licensed Operator Requalification Program Inspection and Request for Information ML23338A2642023-12-0505 December 2023 Confirmation of Initial License Examination AEP-NRC-2023-45, Unit 2 - Schedular Exemption for Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Implementation2023-11-16016 November 2023 Unit 2 - Schedular Exemption for Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Implementation IR 05000315/20234042023-11-0606 November 2023 Cyber Security Inspection Report 05000315/2023404 and 05000316/2023404 ML23310A1152023-11-0606 November 2023 Notification of the NRC Baseline Inspection and Request for Information, Inspection Report 05000316/2024002 IR 05000315/20234032023-09-19019 September 2023 Security Baseline Inspection Report 05000315/2023403 and 05000316/2023403 IR 05000315/20230112023-08-31031 August 2023 Functional Engineering Inspection - Commercial Grade Dedication Report 05000315/2023011 and 05000316/2023011 ML23242A1832023-08-30030 August 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report05000315/2023004 AEP-NRC-2023-40, Annual Report of Loss-of-Coolant Accident Evaluation Model Changes2023-08-29029 August 2023 Annual Report of Loss-of-Coolant Accident Evaluation Model Changes IR 05000315/20234022023-08-11011 August 2023 Security Baseline Inspection Report 05000315/2023402 and 05000316/2023402 AEP-NRC-2023-34, Supplement to Request for Approval of Change Regarding Neutron Flux Instrumentation2023-08-0202 August 2023 Supplement to Request for Approval of Change Regarding Neutron Flux Instrumentation IR 05000315/20230022023-07-24024 July 2023 Integrated Inspection Report 05000315/2023002 and 05000316/2023002 ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III IR 05000315/20230122023-06-22022 June 2023 Biennial Problem Identification and Resolution Inspection Report 05000315/2023012 and 05000316/2023012 IR 05000315/20235012023-06-21021 June 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000315/2023501 and 05000316/2023501 AEP-NRC-2023-29, Core Operating Limits Report2023-06-19019 June 2023 Core Operating Limits Report ML23159A0192023-06-13013 June 2023 Information Meeting with a Question and Answer Session to Discuss NRC 2022 End-Of-Cycle Plant Performance Assessment of Donald C. Cook Nuclear Plant, Units 1 and 2 AEP-NRC-2023-32, Response to NRC Regulatory Issue Summary 2023-1 Preparation and Scheduling of Operator Licensing Examinations2023-06-0606 June 2023 Response to NRC Regulatory Issue Summary 2023-1 Preparation and Scheduling of Operator Licensing Examinations AEP-NRC-2023-33, Renewable Operating Permit2023-06-0505 June 2023 Renewable Operating Permit AEP-NRC-2023-30, Follow-Up Notification of Ph Non-Compliance for Turbine Room Sump2023-06-0101 June 2023 Follow-Up Notification of Ph Non-Compliance for Turbine Room Sump AEP-NRC-2023-27, Annual Radiological Environmental Operating Report2023-05-15015 May 2023 Annual Radiological Environmental Operating Report ML23131A3282023-05-11011 May 2023 D.C. Cook Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000315/2023404 and 05000316/2023404 IR 05000315/20230012023-05-0303 May 2023 Integrated Inspection Report 05000315/2023001 and 05000316/2023001 AEP-NRC-2023-19, Annual Radioactive Effluent Release Report2023-04-30030 April 2023 Annual Radioactive Effluent Release Report ML23117A0062023-04-27027 April 2023 Review of the Spring 2022 Steam Generator Tube Inspections Report ML23114A1142023-04-25025 April 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection AEP-NRC-2023-23, Annual Report of Individual Monitoring for 20222023-04-24024 April 2023 Annual Report of Individual Monitoring for 2022 AEP-NRC-2023-24, Notification of Ph Non-Compliance for Turbine Room Sump2023-04-12012 April 2023 Notification of Ph Non-Compliance for Turbine Room Sump AEP-NRC-2023-20, Annual Report of Property Insurance2023-04-0303 April 2023 Annual Report of Property Insurance AEP-NRC-2023-15, Decommissioning Funding Status Report2023-03-28028 March 2023 Decommissioning Funding Status Report ML23076A0212023-03-20020 March 2023 Request for Information for NRC Commercial Grade Dedication Inspection; Inspection Report 05000315/2023011; 05000316/2023011 IR 05000315/20234012023-03-16016 March 2023 Security Baseline Inspection Report 05000315/2023401 and 05000316/2023401 ML23066A1882023-03-0707 March 2023 Information Request to Support Upcoming Problem Identification and Resolution (Pi&R) Inspection at Donald C. Cook Nuclear Plant IR 05000315/20220062023-03-0101 March 2023 Annual Assessment Letter for Donald C. Cook Nuclear Plant, Units 1 and 2 (Report 05000315/2022006 and 05000316/2022006) IR 05000315/20220042023-02-0101 February 2023 Integrated Inspection Report 05000315/2022004 and 05000316/2022004 and Exercise of Enforcement Discretion AEP-NRC-2023-11, Form OAR-1, Owner'S Activity Report2023-01-31031 January 2023 Form OAR-1, Owner'S Activity Report IR 05000315/20230102023-01-31031 January 2023 Phase 4 Post-Approval License Renewal Inspection Report 05000315/2023010 and 05000316/2023010 AEP-NRC-2023-02, Request for Approval of Change Regarding Neutron Flux Instrumentation2023-01-26026 January 2023 Request for Approval of Change Regarding Neutron Flux Instrumentation ML22363A5622023-01-0404 January 2023 Relief Request ISIR-5-06 Related to ASME Code Case N-729-6 Supplemental Examination Requirements of Reactor Vessel Closure Head Penetration Nozzles AEP-NRC-2022-66, Report Per Technical Specification 5.6.6 for Inoperability of Unit 2 Post Accident Monitoring Neutron Flux Monitoring2022-12-15015 December 2022 Report Per Technical Specification 5.6.6 for Inoperability of Unit 2 Post Accident Monitoring Neutron Flux Monitoring AEP-NRC-2022-46, Notification of Deviation from Electric Power Research Institute (EPRI) Materials Reliability Program 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in2022-12-12012 December 2022 Notification of Deviation from Electric Power Research Institute (EPRI) Materials Reliability Program 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in ML22340A1392022-11-30030 November 2022 Submittal of Revision 31 to Updated Final Safety Analysis Report and 10CFR50.71(e) Updated and Related Site Change Reports IR 05000315/20220112022-11-0404 November 2022 Design Basis Assurance Inspection (Teams) Inspection Report 05000315/2022011 and 05000316/2022011 IR 05000315/20220032022-10-28028 October 2022 Integrated Inspection Report 05000315/2022003 and 05000316/2022003 AEP-NRC-2022-58, U1C31 Steam Generator Tube Inspection Report2022-10-24024 October 2022 U1C31 Steam Generator Tube Inspection Report AEP-NRC-2022-61, Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-062022-10-24024 October 2022 Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-06 2024-01-08
[Table view] |
Text
4 REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS >
DISTRIBUTION FOR INCOMING MATERIAL 50-3i5 REC: KEPPLER J G ORG: SHALLER D V DOCDATE: 04/04/78 NRC IN 5 MI PWR DATE RCVD: 04/24/78 DOCTYPE: LETTER NOTARIZED: NO COPIES RECEIVED
SUBJECT:
LTR i ENCL i FURNISHING REPT PURSUANT TO APPPENDIX A TECH SPECS 3. 4. 8 5 6. 9. i CONCERNING'N Oi/07/78 THE DOSE EQUIVALENT IODINE-13i ACTIVITY WAS FOUND OUT OF SPECIFICATION... W/ATT SUPPORTING INFO.
Pt ANT NAME: COOK UNIT REVIEWER INITIAL: X JM DISTRIBUTOR INITIAL:
+++>+4++>++>+>+>+ DISTRIBUTION OF THIS MATERIAL IS AS FOLLOWS GENERAL DISTRIBUTION FOR AFTER ISSUANCE OF OPERATING LICENSE.
(DISTRIBUTION CODE A001)
FOR ACTION: CHIEF SCHWENCER44W/7 ENCL INTERNAL: REG ILES +W/ENCL NRC PDR4+W/ENCL
+>W/2 ENCL OELDw+LTR ONLY HANAUER+4W/ENCL CHECK44W/ENCL E I SENHUT+4W/ENCL SHA0~%W/ENCL BAER4+W/ENCL BUTLER~~W/ENCL EEB+>W/ENCL J COLL INS++W/ENCL J. MCGOUGH4+W/ENCL seoeomae/ ippo~r~ c~L EXTERNAL'R l4OOS 7-o u 80@ L LPDR S jVov4g ST. JOSEPH'I >>W/ENCL TICKS< W/ENCL g p) I +i< ~ t=dC (.
NS IC+>W/ENCL VEb8SM C.ot" c.
ACRS CAT B4+W/16 ENCL gg~gME.p ev& H E.~<
f get aeR cQce
{Zo 0 Qgp~Rl l C.QCL .
DISTRIBUTION:
SIZE: 2P+iOP LTR ~ ENCL ~ CONTROL NBR: 78ii 0 3 THE END
I II 4 I
II I
I I'
~ 1 I H I I
.1 I
1 11
Op
~y><+ /NDIANA 8 NICHIGAI(V PD SER CDII/IPAI(IY DONALD C. COOK NUCLEAR PLANT P.o. Box 468, Bridgman, Michigan 49106 (616) 4654901 April 4, 1978 Operating License DPR-58;; ~1 Docket 8 50-315 rn C7 chic))
A7 Mr. J. G. Keppler, Regional Director Office of Inspection and Enforcement 7g )
U. S. Nuclear Regulatory Commission Cv Region III C')
MC 799 Roosevelt Road B Glen Ellyn, Ill. 60137 CA why
Dear Mr. Keppler:
This report is submitted persuant to the requirement of Appendix A Technical Specifications 3.4.8 and 6,9.1. On January 7, 1978 the dose equivalent iodine-131 activity was found out of specification.
At 1400 on January 7, 1978 reactor power on Unit 1 was reduced slowly to 8/ power and the reactor tripped from 8%. Power reduction was done for a scheduled repair/investigation outage.
Routine surveillance at 2100 January 7, 1978 showed that the dose equivalent iodine-131 had spi ked with a maximum value noted of 1.1 )1 Ci/gram.*
Reactor power had been varied considerably the previous week with no evidence of iodine spiking noted. During power reduction CVCS purifi-cation flow through the mixed bed demineralizer was approximately 75 gpm, as it had been for the majority of the week. No degassing operations were associated with this occurrence.
Analysis of the reactor coolant prior to this excursion had shown dose equivalent iodine-131 to range from 9.12 x 10 3
)1 Ci/g to 2.80 x 10 )1 C)/g during the period of numerous power changes. Analysis at 0500 on 1-8-78 showed the iodine-131 had decreased to 0.539 pCi/g with dose equivalent iodine-131 at 0.675'1Ci/g. This activity continued to decrease even during power ascension on 1-9-78. Once stable at 100/ dose equiva-lent iodine-131 remained constant at approximately 2.3 x 10 z pCi/g.
Iodine release at this time period is consistant with data reported in Westinghouse Electric Corporation WCAP-8637 ".Iodine Behavior under transient conditions in the Pressurized Water Reactor". Dose equivalent iodine-131 values were in the "Acceptable Operation" portion of Technical ll 4('R 1 0 (gy8 ~o H
f 781150g32 ((
Apr i 1 4, 1978 Mr. J. G. Keppler Page 2 Specification Figure 3.4.1 at all times during the transient. Fuel burnup by core region is indicated in the attached table.
This report does not meet the 30 day Technical Specification reporting requirement. This is presently under investigation and a Licensee Event Report will be submitted describing the findings and resolutions.
- Coolant samples are brought to ambient conditions before counting; therefore, units of pCi/gram and pCi/cc are interchangeable, Very truly yours, D. V. Shaller Plant Manager ms attachments cc: R. W. Jurgensen J. E. Dolan R. Kilburn R. F. Kroeger R'. J. Vollen, BPI K. R. Baker, RO:III P. W. Steketee, Esq.
R. C. Callan R. Walsh, Esq.
G. Olson J. Stietzel PNSRC File G. Charnoff, Esq.
J. M. Hennigan Dir, IE (20 copies)
Dir, MIPC (2 copies)
'i BURNUP FOR PERIOD (%ID/NTU)
CORE REGION 10-'1-77*.to 1-18-78 4 (D) 0.767.2 x 10~
2 (B) 0.2622 x 105 3 (c) 0.2192 x 105
NO. 34D.L412 DIETZGEN GRAPH PAPER EUGENE DIETEGEN CO.
SEMI LOGARITHMIC MADE IN U. 8 A 4 CYCLES X 12 DIVISIONS PER INCH Cb 5 G MQIO hl Q 4 G 5 M SO
'I)
~ ~
0 8 '5
NO. 340 L412 DIETZGEN GRAPH PAPER EUGENE DIETZGEN CO.
MADC IN U. S. A.
SEMI LOGARITHMIC 4 CYCLES X 12 DIVISIONS PER INCH C
~ q C'Much ~
'9 e (o~ \
6 ~ ~
W& 4A t~~
gW
'I y ~ yh P~<
yo) o -- ~ )
t 1
J
~ ~
I H
4 Q
~p
~ ~ -+ ~
-t 0'=
I
.~
~l <<t P
4- ~- I
~I
~ 4
~
(yi"
~r~~ t~
V I
't ~ f ~4~ a..~
<<k 4
'I J
4 t
~+~ W ~ ~
3
~
D RO rr sw4+ ~ + v tbyw~~kl f ~op 4W
~
~
a-l.
~ ~f 47 /BOO /~ ~-~ tP C~
/~
H e
/JSO pctd
-'-"-/-.4 78;. ]-~- 7g ]-@-7C r-f-7f (-(o.-7f.
(I)"R No.
K)OOÃbklLE) C.CO)aIK Date I- . I i'2)
Time <~0<
HUCLSA,E O'ILAH'r (3) Category A B D E COOKIIMV(OOH RIPIY (4) Classified By ~~~
TO: Plant Manager LER DUE BY /~. (5) AO/I'AEO o.
(6) Item Reported On Dose E@utoalenh (7) Plant Conditions Z-Ial in+be UnA 4 lt C. S. rsol oP Unit ~I Mode ~ Testing '( )Yes ( ~o gpss ficctIton Unit ¹2 Mode Testing ( )yes ( )No (8) Description of Condition 4'100 on I- 7-7S Qs dose e o>oalcnk Z 18 I 4e recc4rr coo(oak sc)sk rn urQs Zond
- r be I. I~wc;/ce 4is cans Allrro/srt, unit I +.P grsri ~8Po ponsv a4 Irfg(
( ) Additional Pages Reported By (9) Corrective Action Taken By (10) Off-Site Notification Made By (Complete Telephone Records 8 Attach)
( ) AEPSC ( )'I 8 M ( ) NRC ( ) Michigan (~ot Applicable (I 'I) Investigation Assigned To I~ < ~~A~ p/rP (12) Investigation Report mX she inu~~g~o~~
I
( ) Additional Pages Completed By (13) Preventive Action Taken 5 ~< iQ75cF/~.
( ) Additional Pages Dept. Head Approval (14) PNSRC Review: Date Comments:
(15) Distribution:
Plant Mgr., Asst. Plant Mgr., QA Supv., PNSRC Secretary, AEPSC Manager Q.A. Dept. Head of Orig. Dept.
Form No. DMP 7030 RPT 001-$
Instru~tioni'or 'Uii
- 1. Condition Report No. assigned by Q.A. Supervisor,'uty Staff Supervisor, Plant Manager or Assistant Plant Manager.
H
- 2. Date and Time completed by originator.
- 3. Category assigned by Plant Manager, Assistant Plant Manager, Operations Supervisor or Duty Staff Supervisor.
I
- 4. Classified By signature of classifier.
- 5. AO/AEO No. assigned by Q.A. Supervisor after review of Condition Report by PNSRC.
- 6. Item Reported On completed by originator.
- 7. Plant Condition completed by originator.
- 8. Description of Condition completed by originator.
- 9. Corrective Action completed by whoever takes the action.
NOTE:
- 1. Corrective Action is the action taken to 1) restore the system, compon-ent or structure to. a normal condition or 2) to place the plant in a safe and stable condition u'ntil permanent corrective action can be identified and accomplished.
- 2. If a Job Order was written, provide the number. If a Temporary Change Sheet was initiated, provide the number.
- 3. If no Corrective Action was required, enter NA and sign it.
- 10. Off-Site Notification completed by classifier. If not applicable, the classifier should enter his initials in that block.
- 11. Investigation Assignment completed by the classifier.
- 12. Investigation Report completed by individual conducting the investigations.
- 13. Preventive Action Taken completed by individual who completes the preventive action.
NOTE: Preventive action is that action taken in addition to the Corrective Action Taken, to identify the root cause of the condition and the measures taken to prevent recurrence of the condition.
- 14. PNSRC Review completed by PNSRC.
- 15. Distribution made by QA Supervisor or Duty Staff Supervisor a) after comple-tion through item 11, b) by QA Supervisor after original is reviewed by PNSRC.
~ ~
IANA AND MICHIGAN POWER COMPA DONALD C. COOK NUCLEAR PLANT Iodine S ike Followin Power Transient - Januar 7 1978 This report is'submitted persuant to the requirement of Appendix A Technical Specifications 3.4.8 and 6.9.1. On January 7, 1978 the dose equivalent iodine-131 activity was found out of specification.
At 1400 on January 7, 1978 reactor power on Unit 1 was reduced slowly to 8% power and the reactor tripped from 8L. Power reduction was done for.a scheduled repair/investigation outage.
Routine surveillance at 2100 on January 7, 1978 showed that the dose equivalent iodine-131 had -spiked with a maximum value noted of 1.1 p Ci/gram.*
Reactor pow'er had been varied considerably the previous week with no evidence of iodine spiking noted. During power reduction CVCS purifi-cation flow through the mixed bed demineralizer was approximately 75 gpm,
.as it had been for the majority of the week. No degassing operations were associated with this occurrence.
Analysis of the reactor coolant prior to this excursion had shown dose equivalent iodine-131 to range from 9.12 x 10- pCi/g to 2.80 x 10 z p Ci/g during the period of numerous power changes. Analysis at 0500 on 1-8-78 showed the iodine-131 had decreased to 0.539 pCi/g with dose equivalent iodine-131 at 0.675 pCi/g. This activity continued to decrease even during power ascension on 1-9-78. Once stable at 100$ dose equiva-lent iodine-131 remained constant at approximately 2.3 x 10-~ pCi/g.
Iodine release at this. time period is consistant with data reported, in Westinghouse Electric Corporation WCAP-8637 "Iodine Behavior under transient conditions. in the Pressurized Water Reactor". Dose equivalent iodine-131 values were in the "Acceptable Operation" portion of Technical Specification Figure 3.4.1 at all times during the transient. Fuel burnup by core region is indicated in the attached table.
- Coolant samples are brought to ambient conditions before counting; therefore, units of pCi/gram and qCi/cc are interchangeable.
BURNUP FOR PERIOD (MllD/tlTU)
CORE REGION 10'-1-77 to 1-18-78 4 (D) 0.7672 x 104 2 (B) 0.2622 x 105 3 (c) 0.2192 x 106
~ ~ i L
a
~ ~ ~ I
~ I ~ I 0 I I I I
/0 ~
B v
a o
zA Q Ol N
4l z 0
X<
>Z a
~>
zo 0
8 L v II.
L o Z
II o II Q g III zI a2
~ III
>aa 0 N
NEx
~~tA. 4I
~ I
~ J a o o
a Z 0 B
~ I ~
~ I ~ I
4 I I I
(O Q
8 v
0 0
zi 0N ol I
~z 0
~M 24 4I Cl I
I (g I) 9 8
IZ Z
0 2
Z I4 0 I4 0 E III2 2Z0
~ I-0~QI I
4I 0 0 0
0 JN nXx III CI ~ ~ ~ ~
4I
~ J 0
0 0 0 !0 ~IQ 8
V k ~
C~
yVI
I, I t
4 y$ -