ML18219D509
| ML18219D509 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 07/28/1977 |
| From: | Shaller D Indiana Michigan Power Co, (Formerly Indiana & Michigan Power Co) |
| To: | James Keppler NRC/IE, NRC/RGN-III |
| References | |
| Download: ML18219D509 (4) | |
Text
U.S. NUCLEAR REGULATORY COM ION NRG'FORM 18S I2.7S I NRC DISTRIBUTION FoR PART 50 DOCKET MATERIAL DOCKET NUMSER TO:
Mr. J G>> Keppler FROM:
& Michigan Power Company
- Bridgman, Michigan D>>V>> Sheller DATE OF DOCUMENT 7/28/77 DATE RECEIVED 8/1/77
%LETTER OORIGINAL
~OP Y DESCRIPTION 0 MOTO R IZ E D
~ UN C LASS I F I E D PROP INPUT FORM ENCI OSURE NUMBER OF COPIES RECEIVED I
~'onfirming telephone conversation on 7/27/77 concerning an abnormal environ occurrence re chlorine residual z at the circulating water dis'charge exceeding 0>>10 ppm for a ten minute period>> ~ ~ ~ ~
PLANT NAME:
Cook Unit No>>
1 RJL 8/2/77 T MANAGER:
(e~N~N (1-P)
FOR ACTION/INFORMATION ASSIGNED AD:
BRANCH CHIEF:
PROJECT MANAGER:
ENVIRHNMENTAL MOORE LTR EN ING ASSXSTKVl'.
LICENSING ASSISTANT:
B>>
HARLESS INTERNALDISTRIBUTION TFMS SAFETY HEINEMAN E
E PLANT SYSTEMS TEDESCO BENAROYA SITE SAFETY &
ENVIRON ANALYSIS DENTON & MULLER ENGINEERING IPPOLITO OPERATING REACTORS ENVIRO TECH ERNST BALLARD BLOOD TIC e
VA CHECK AT I A TZMAN BERG EXTERNAL DISTRIBUTION NSIC BUTLER RI GAMMILL 2
SITE ANALYSIS VOLLMR BUNCH J ~ COLLINS CONTROL NUMBER R
IV J
HANCHETT 16 CYS ACRS SENT CAT GO Y NRC FORM 19d (2 7dl 772aeO232
A
0
~Keen'mama 8 aaleHmau aowEa t;aeaaeY DONALD C. COOK NUCLZAR PLANT P.O. Box 458, Bridgman, Michigan 49106 July 28, 1977 0
fq
~,c,, +Q' 8>>
8.'r.
J.G.
- Keppler, Regional Director Office of Inspection and Enforcement United States Nuclear Regulatory Commission Region II I 799 Roosevel t Road Glen Ellyn, I<
60137 gS
Dear Mr. Keppler:
I g
@pe g)CLED Rt-Operating License DPR-58 Docket No. 50-315 This is to confirm our telephone call to Hr.
R. 'l<arnick, NRC Region III, at 1600 hours0.0185 days <br />0.444 hours <br />0.00265 weeks <br />6.088e-4 months <br /> on July 27, 1977.
During this conversation we reported that an abnormal environmental occurrence had taken place at 0930 hours0.0108 days <br />0.258 hours <br />0.00154 weeks <br />3.53865e-4 months <br /> on July 27,
- 1977, when the chlorine residual at the circulating water discharge exceeded 0.10 ppm for a ten minute period.
During this ten minute interval the chlorine residual was 0. 10 - 0. 12 ppm which violates Appendix B Technical Specifications Section 2.2. 1.2.
A complete report of this event will be submitted by August 3, 1977.
Sincerely, D.V. Shaller Plant Manager
/bab cc:
J.E.
Dolan R.'H. Jurgensen G.E. Lien R.
Ki 1 burn R.J.
Vollen BPI K.R. Baker RO:III-R.C. Callen MPSC P.H. Steketee, Esq.
R. Malsh, Esq.
G. Charnoff, Esq.
J.M. Hennigan G. Olson PNSRC J.F. Stietzel Dir., IE (20 copies)
Dir.; MIPC (2 copies)
Directorate of Licensing P7ZiqOZS-
l p
tt ir it cp zl gd
.l BfiV )/6L II IllfflOi~lSS23QUd IH3)<AJGO Q3AI='338