Letter from American Electric Power Service Corp Requesting for an Extension of Time for Submittal of a Follow-up Report on the Violation Which Was Reported on 2/7/1975
ML18219D061
Person / Time
Site: Cook  
Issue date: 02/14/1975
From: Hunter R
American Electric Power Service Corp
To: Jordan E
Office of Nuclear Reactor Regulation
References
Download: ML18219D061 (3)


Text

NRC DISTRIBUTION FOR PART 50 DOCKET M~wl ERIAL (TEMPORARY FORM)

CONTROL NO:

FILE FROM: American Elec. Pwr. Serv Corp.

New York, N.Y.

10004 R TO:

Mr. E L. Jordan

+ATE OF DOC 2-14-75 ORIG 1 i ed

RPT, CC OTHER SENT AEC PDR SENT LOCAL PDR DATE R EC'D LTR TWX 2-21-75 OTHER

'CLASS

'UNCLASS XXX PROP INFO INPUT NO CYS REC'D

.DOCKET NO:

SD-Sl.S53 DESC R IPTION: Ltr requesting for an extension of time for submittal of a follow up report on the violation which was reported on 2 ENCLOSURES:

5 ~

~ ~ ~

PLANT NAME:

Donald, C. Cook Unit 1 5 2 FOR ACTION/INFORMATION DHL 2-24-75 BUTLER (L).

W/ Copies CLARK (L)

W/ Copies a w w I ~

~

W/ Copies CNIFL (L)

WICopies SCHWENCER (L)

W/ Copies STOLZ (L)

W/ Copies

-/'.

LO ',

}

W/ Copies PURPLE (L)

, W/ Copies Z I EiVIANN (L)

W/ Copies DICKER (E)

W/ Copies

~/ ~

~ ~ P

~ tW&i ~ I ~

l~l"'~ i l i Vl'4 W/ Copies YOUNGBLOOD (E)

W/ Copies BEGAN (E)

W/ Copies LEAR (L)

W/ Copies W/ Copies

'W/ Copies INT R MAL DISTRIBUTION gl RC PDR (2)

~

~

GC, ROOiVI P-506A OSSI CK/STAF F CASE GIAMBUSSO OYD OORE (L)

DEYOUNG (L)

SKOVHOLT (L)

GOLLER (L) (Ltr)

P. COLLINS DENISE EG OPR FILE 5 REGION (2I T.R. WI LSON STEELE TECH RFVIEW SCI-IROEDER MACCARY KNIGHT PAWLICKI SHAO STELLO HOUSTON;~

NOVAK ROSS IPPOLITO TEDESCO LONG LAIN AS BENAROYA VOLLiVIER DENTON G R I IVIES GAMMILL KASTNER BALLARD SPANGLER ENVIRO MULLER DlCKER KNIGHTON YOUNGB LOOD BEGAN PROJECT LDR HAR LESS LIC ASST R. DIGGS (L)

H. GFARIN (L)

E. GOULBOURNE (L)

P. KR E UTZE R (E)

J. LEE (L)

M. MAIGRET (L)

. REED(E)

~

~

. SERVICE (L)

S. SHFPPARD (L)

M. SLArER (E)

H. SMITH (L)

S. TEETS (L)

G. WILLIAMiS(E)

V. WILSON (I)

R. INGRAM (L)

A/T IND BRAITMiAN SALTZMAN ME LTZ PLANS MCDOi'IIALD CHAPMAN GS UB E (Ltr)

Cr. COUPE PETERSON I.IARTFIELD (2)

KLECKER E ISE NHUT WIGGINTON EXTERiNALDISTRIBUTION 9 LOCALPDR~~eph Mich.

H TIC (ABERNATHY)

(1)(k)(10) NATIOiIIALLABS Qf NS I C (BUCHANAN) 1 W. PENNINGTON, Rm E-201 GT 1 ASLB 1

CONSULTANTS 1 Newton Anderson NEWMARK/BLlUME/AGBA8IAN ACRS HOLDING/SENT 1 PD R-SAN/LA/NY 1, BROOKHAVEN NAT LAB 1 G. ULRIKSON, ORNL 1 AGMED (RUTH GUSSMAN)

Rm 8-127 GT 1 J: D..RUNKLES, Rm E-201

.GT

RegulaIcDocket file AMERICAN ELECTRIC PQVfER Service Corporation ROOCRT S. HUNTER VICC HHCCIOCHT HllCLCAR CHOIHCCRIHO 2 Broadway, h'ew~or+N. Y 10004 (212) 422.48

~0 DDDggES.

P Q~SgC g~ 5,

,e 'ruary 14, 1975 Docket No. FEBg);'I9 and No.

-3 QQ[0 CPPR No.

DPR No.

58 Mr. E. L. Jordan, Senior Reactor Inspector Operations Branch Directorate of Regulatory Operations U.S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137 g5lL S@~

> ~g yzKK

/4 0

'$I I

rifjl<j~l<~~

8

~L Qp(n~

~$ )+A P

-CIST' Jfg

@CgIgAI Pr~

H cgII +i

$g~,

Qr,l)

Dear Mr. Jordan:

I CP.

This letter confirms our telephone conversation of February 13 regarding our request for an extension'of time for submittal of a follow-up report on the viola'tion which >Ie reported to you on February, 7, 1975.

"'v"G'1Q 0I Illfvlv d the release Of >~ster froid ihe waste evaporator condensate tank without having carried out a sampling step required by the Environmental Technical Specifications (Section 2.4.2b).

Our investigation of this violation has led to a discovery that in the water releases which we have made to date, the quantity of boric acid exceeds the concentration limits set by Table.2-1 of our Env;ronmental Technical Specifications.

In addition to this, we are required in Table 4.2-1 of the Environmental Technical Specifications to carry out a lake water sampling program, "Every 4 weeks or 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after a batch release."

We are sampling every 4 weeks, but if the Specification means each batch release, we have not being carrying out this step.

We will seek clarification of this requirement from the fluclear Regulatory Commission staff.

To determine the reasons for these violations and the corrective actions more time will be required, and we therefore ask for an extension of the time required to submit our report to you.'s a

course'of our telephone conversation, you agreedthat submission of this report on February 21, 1975 would be acceptable.

Yery truly yours, RSH kb cc:

Gerald Charnoff, Esq.

R; C. Callen, Esq.

R., J. Yollen, Esq.

2975 R. S. Hunter R. Walsh, Esq.

P.

W. Steketee, Esq.

R.

W. Jurgensen Bridgman gSS5