Letter Response to Item 6 of IE Bulletin 75-04A
ML18219C442
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 08/27/1975
From: Hunter R
American Electric Power Service Corp
To: James Keppler
NRC/IE, NRC/RGN-III
References
IEB-75-004A
Download: ML18219C442 (4)


Text

-0 h)EMO ROUTE SLI Form AEC-93 (Rcv. S(ar 14, 1947)

P ASCM 0240 See me about this Note and return.

For concurrence For alcnature.

For action.

For Information.

To (Namo and unit)

IE Chief, FS(NEB IE:jjQ(4)

Licensing(4)

J. Rizzo ONIPC To (Name and unit)

A/D fox Info. Process Region I Region II PDR Local PDR To (Name and unit)

NSIC TIC R. Callen

,R. Vollen INI'IIALS DATE INITIAlS INITIALS DATE REMARKS REMARKS REMARKS Indiana and Hichi an Power Com an D. C. Cook Plant Unit Nl 50-315 n

FROM (Name and unit)

G. Fiorelli IE:III REMARKS Attached is a copy of licensee's reply dated August 27, 1975, to IE Bulletin 75-04A.

PHONE IKL DATE 09-05-75 USE Ol'HER SIDE FOR ADDITIONALREMARKS GFO r lett 0 eI9 469

~e r

0

AMERICAN ELECTRIC POPOVER Service Corporation hhOhhCAT S. HUNTCR VICC PRCOIOCNC NVCLCAR CNOINCCRINO 2 DronChvay, ¹hv York, Ã Y. 10004 (212) 422-4800 August 27, 1975 Donald C. Cook Nuclear Plant Docket No. 50-315 DPR No.

58 U.S. Nuclear Regulatory Commission Office of Xnspection and Enforcement Region IXX

'799 Roosevelt Road Glen Ellyn, Xllinois

,60137 Attention:

bfr. J.

G. Ke ler Re ional Director Gentlemen:

Item 6 of IE Bulletin 75-04A requires a schedule for accomplishment of any revisions to our policies and procedures, and any proposed changes to the facility, to assure that consideration for alternate methods for accomplishing an orderly plant shutdown. and cooldown are provided in case of loss of normal and preferred alternate shutdown and cooldown systems at the Donald C. Cook Nuclear Plant.

Our letter to you dated June 27, 1975 provided this schedule.

Xn addition, Xtem 6 requests monthly summary reports detailing our progress. in this work.

Our letter to you dated July 30, 1975 was the first such monthly

report, and this letter is the second..

A meeting of American'Electric Power Service Corporation engineers and the Donald C. Cook Nuclear Plant operating staff was held at the plant on august 5, 1975 to review and make final a list of components needed for safe shutdoirn and cooldown following the postulated event.

A list of associated instrumentation was also agreed upon.

The possibility of local instrumentation and instrumentation

.'anels to monitor critical parameters, as well as the locations of these local panels, was discussed.

. 2

'l7 IL LP ~ W

Y~$

Mr. J.

G. Keppler August 27 ) 1975 Electrical engineering vork'is proceeding on schedule and consists of the compilation of instructions for the operating staff for local control of the necessary components exclusive of those vhich require electrical changes or additions.'he instructions consist of sequential steps for the most direct, and least time consuming, method of accomplishing local operation.

Work is continuing to determine those components vhich require electrical changes or additions to assure that local control vill be possible in 0he event of loss of control from the control room.

Very truly yours, RSH:ma R.

S. Hunter Vice President-Nuclear Engineering cc: