Supplement Response to NRC Letter of 6/29/1972, Furnishing Information on Valve Wall Thickness
ML18219C435
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 06/26/1975
From: Dolan J
American Electric Power Service Corp
To: James Keppler
NRC/RGN-III
References
Download: ML18219C435 (6)


Text

See me about this. For'concurrence. For action.

MEMO ROUTE SLlP Form ERDA-93 ()-75) ERDAhi 0240 Note and return, For slanature. For Information.

To (Name and unit) INITIAlS REMARKS IE Chic f, FSOB American Electric Po er Service Cor. oration IE Chic f, FC6EB IE:HQ(4) DATE Indiana and Michigan" Power Company Licens ing (4)

D. C.'oolc Plant - 'nits 1 and 2 To (Namo and unit) INITIAlS REMAP.KS J. Rizzo, OMIPC Docket Nos.. 50-315 and 50-316 A/D for Info. Process Region I Region II PDR To (Name and unit) INITIAlS RfMARKS Local PDR NSIC TIC DATE OGC, Be th, P- 506A-R. Vol len FROM (Name and unit)

R. Ca lien Attached is a copy of licensee's letter dated June 26, 1975.

FROÃ:

D. N. Hunnicucc This adequately responds to IE request for information on IE: III valve wall thickness.

PHONE HO. DATE 12/23/75 USE OTHER SIDE TOIT~DITIOHAI. REMARKS OIO r 1915 O-STP see

e e AMERICAN ELECTRIC POWER Servi ce Corporati on 2 Btoarltrtay, .Vctrt Yorj', N. Z l0004 (2l2J 422 4800 Jolly E Dol.d aV Errnuin 1 "trr Prr~idrnt Ettginrnirg 8 Cotttttttctioa June 26, 1975 Docket No. 50-315 and 50-33.6 DPR No. 58 and CPPR No. 61 U.S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137 Attention: Mr. Z. G. Keppler, Regional Director Gentlemen:

This letter supplements our letters of August 4, 1972, October 12, 1972, August 1, 1974 and.

October 22, 1974 to you which vere in response to your letter of June 29, 1972 vhich requested,-that ve provide acceptable documentation of conformance shoving that certain specified valves at the Donald C. Cook Nuclear Plant met minimum wall thickness requirements.

Our letter of October 22, 1974- completed the requirements for all of the Unit 1 valves involved, a total of one hundred and forty-four. Our program for the 144 Unit 2 valves was progressing in accordance with our letters mentioned above until we were forced. to curtail construction of Unit 2 in November, 1974. Since then, our valve wall thickness program has not progressed rapidly enough to allow us to complete the Unit 2 portion by the required date, June 29, 1975.

The current status of the 144 Unit 2 valves needing verification of vali thickness is as follovs:

1. 121 valves have been ultrasonically tested and found. acceptable.

it Ic~

l~

Mr. J. G. Keppler 'une 26, 1975

2. 15 valves have been ultrasonically tested.

and found to require. add.itional evaluation or repair,.

3. 8 valves have not yet been received on site (supplied by Westinghouse) .

The .lg.,valves that require..additional,"evaluation or repair will be qualified by further evaluation or by repair if necessary, when Unit 2 construction resumes and the craft manpower is available to do the work.

The 8 valves yet to be received. on site will be qualified by Westinghouse before they are delivered to the site. J Very truly yours,

.- F."

ohn E, Dolan Executive Vice President Engineering A Construction JED:ma, cc'op ~