Response to Item 6 of IE Bulleting 75-04A, Furnishing Information Re Schedule for Accomplishment of Revision, & Provide Summary Reports Detailing Monthly Progress, as Required
ML18219C430
Person / Time
Site: Cook  
Issue date: 02/26/1976
From: Hunter R
American Electric Power Service Corp
To: James Keppler
NRC/RGN-III
References
IEB-75-004A
Download: ML18219C430 (5)


Text

~r ROUTING AND TRANSMITTALSLIP 70 (Name, olllco Tys*or or location)

IE CIIIEF, FOSB IE CIIIEF, FC&EB IE:11 4

POSLUSNY, PSB LICENSING(4)

ACTION OAIC COORDINATION (HITIA(a r ILL INITl*LO C lacy(AIC J

RIZZO OMIPC OATC INroRMATION A/D for INFO, PROCESSING REGION I REGION II PDR CVOCAL PDR NSIC TIC R

VOLLEN REMARKS R,

CALLEN O*TC

<CR CON VCRSATION INITIALO OCC MC DA'TC OICNATDRC IHITIALS ROTC ANO RCIVRN AMERICAN ELECTRIC POMER SERVICE CORPORATION INDIANA AND MICHIGAN POMER COMPANY D,"C.

COOK PLANT - UNIT fk 1 DOCKET NO. 50-315 Attached is a copy of licensee's reply dated February 26, 1976 to IE Bulletin 75-04A.

Do NOY usc this form as a RECORD of approvals, concurrences, disapprovals, clearanccs, and stmilar actions FROM (Namo, ollico symbol or locallon)

G. Fiorelli, IE:III OATC 3/01/76 RHDHc OPTlOHAL FORM 41 AVGVST $ 007 GSA 1IPMIt 1 at CPA)

$ 00 lli2DO

~dd-Id&tddd I dda-IOT oso 504$ lol

AMERICAN ELECTRIC POVVER Servi ce Corporation 2 Broadway, Pcs York, N. Y.i OOOO (2/2J 422.4800 ROBERT S. IIUÃTER Vier President-Nudcar Fngincrring Donald C. Cook Nuclear Plant Docket No. 50-315 DPR No.

58 February 26, 1976 U.S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region IIX 799 Roosevelt Road Glen Ellyn, Illinois 60137 Attention:

Mr. J.

G. Keppler, Regional Director Gentlemen Item 6 of IE Bulletin 7g-04A requires a schedule for accomplishment of any revision to our policies and procedures and any proposed changes to the facility, to assure that consideration for alternate methods for accomplishing an orderly plant shutdown and cooldown

'are provided in case of loss of normal and preferred alternate shutdown and cooldown systems at the Donald C.

Cook Nuclear Plant.

Our letter to you dated June 27, 1975 provided this schedule.

In addition, Item 6 requests summary reports detailing our monthly progr'ess.

This letter is the eighth such monthly report.

The AEPSC Nuclear Safety and Design Review Subcommittee on Proposed Changes has now completed their review of the physical changes to be made so that a

number of air-operated valves may be locally controlled, and local instrumentation panels installed to monitor critical parameters following loss of control from the control room.

The design of the above-mentioned panels is progressing and contractors are being considered to construct them.

The mounting locations of the panels and the MAR

)97m

A>

1

Mr. O'.

G. Keppler F~ebruary 26, 1976 arrangement of instruments have been decided and their drawings are being prepared.

A schedule for the procurement, fabrication and installation of the new equipment is being prepared and should be available for our next monthly report.

Very truly yours,

'.4-~M R. S. Hunter

~Vice President-Nuclear Engineering RSH:mam ceo G ~