Response to Item 6 of IE Bulleting 75-04A, Furnishing Information Re Schedule for Accomplishment of Revision, & Provide Summary Reports Detailing Monthly Progress, as Required
ML18219C430
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 02/26/1976
From: Hunter R
American Electric Power Service Corp
To: James Keppler
NRC/RGN-III
References
IEB-75-004A
Download: ML18219C430 (5)


Text

~ r ACTION ROUTING AND TRANSMITTAL SLIP 70 (Name, olllco Tys*or or location) INI Tl*LO C lacy(AIC IE CIIIEF, FOSB IE CIIIEF, FC&EB OAIC COORDINATION IE:11 4 POSLUSNY, PSB (HITIA(a r ILL LICENSING(4)

OATC INroRMATION J RIZZO OMIPC A/D for INFO, PROCESSING IHITIALS ROTC ANO RCIVRN REGION I REGION II O*TC <CR CON VCRSATION PDR INITIALO OCC MC CVOCAL PDR NSIC DA'TC TIC OICNATDRC R VOLLEN REMARKS R, CALLEN AMERICAN ELECTRIC POMER SERVICE CORPORATION INDIANA AND MICHIGAN POMER COMPANY D,"C. COOK PLANT - UNIT fk 1 DOCKET NO. 50-315 Attached is a copy of licensee's reply dated February 26, 1976 to IE Bulletin 75-04A.

Do NOY usc this form as a RECORD of approvals, concurrences, disapprovals, clearanccs, and stmilar actions FROM (Namo, ollico symbol or locallon) OAT C G. Fiorelli, IE:III 3/01/76 RHDHc OPTlOHAL FORM 41 ~ dd-Id&tddd I dda-IOT oso 504$ lol AVGVST $ 007 GSA 1IPMIt 1 at CPA) $ 00 lli2DO

AMERICAN ELECTRIC POVVER Servi ce Corporation 2 Broadway, Pcs York, N. Y. i OOOO (2/2J 422.4800 ROBERT S. IIUÃTER Vier President-Nudcar Fngincrring February 26, 1976 Donald C. Cook Nuclear Plant Docket No. 50-315 DPR No. 58 U.S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region IIX 799 Roosevelt Road Glen Ellyn, Illinois 60137 Attention: Mr . J. G. Keppler, Regional Director Gentlemen '.

Item 6 of IE Bulletin 7g-04A requires a schedule for accomplishment of any revision to our policies and procedures and any proposed changes to the facility, to assure that consideration for alternate methods for accomplishing an orderly plant shutdown and cooldown

'are provided in case of loss of normal and preferred alternate shutdown and cooldown systems at the Donald C. Cook Nuclear Plant. Our letter to you dated June 27, 1975 provided this schedule.

In addition, Item 6 requests summary reports detailing our monthly progr'ess. This letter is the eighth such monthly report.

The AEPSC Nuclear Safety and Design Review Subcommittee on Proposed Changes has now completed their review of the physical changes to be made so that a number of air-operated valves may be locally controlled, and local instrumentation panels installed to monitor critical parameters following loss of control from the control room.

The design of the above-mentioned panels is progressing and contractors are being considered to construct them. The mounting locations of the panels and the MAR )97m

A>

1

Mr. O'. G. Keppler F~ebruary 26, 1976 arrangement of instruments have been decided and their drawings are being prepared.

A schedule for the procurement, fabrication and installation of the new equipment is being prepared and should be available for our next monthly report.

Very truly yours,

'.4-~M R. S. Hunter

~

Vice President-Nuclear Engineering RSH:mam ceo G~ Charnoff R. C. Callen

p. W. Steketee R. Walsh R. O'. Vollen R. W. Jurgensen - Bridgman

~

)