06/30/1976 Letter Response to IE Bulletin 75-04A
ML18219C415
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 06/30/1976
From: Hunter R
American Electric Power Service Corp
To: James Keppler
NRC/IE, NRC/RGN-III
References
IEB-75-004A
Download: ML18219C415 (4)


Text

AMERICAN ELECTRIC PO,VI,ER Service Corporation 2 J3rnaChvay, Ncw Vorrc, N. )'. 30004 (212) I$22 4800 ROBERT O HUNTER VICC PNCCIDCHT NUCCCAN CH4INCCNIN4 June 30, 1976 Donald C. Cook Nuclear Plant Docket No. 50-315 DPR No. 58 U.S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region XXX 799 Roosevelt Road Glen Ellyn, Illinois 60137 Rttention: Mr. J. G. Ke vier Re ional Director Gentlemen:

Item 6 of IE Bulletin 75-04k requires a schedule for accomplishment of any revision to our policies and procedures and any proposed changes to the facility, to assure that consideration for alternate methods for accomplishing an orderly plant shutdown and cooldo~rn are provided in case of loss of normal and preferred alternate shutdown and cooldown systems at the Donald'C. Cook Nuclear Plant. Our letter to you dated June 27, 1975 provided this schedule.

ln addition, Item 6 requests summary reports detailing our monthly progress. This letter is the twelfth such monthly report.

The fabrication of the local shutdown instru-mentation panels has been delayed. The labor dispute at the vendor's plant was-recently settled and the best estimate for delivery of the completed panels is now late September of this year. This is well in advance of the next extensive outage which is required for the wiring in, calibration and testing of these panels.,

Very truly yours, RSEi:mam cc: see next page R. S. E unter

Mr. J. G. Keppler June 30, 1976 cc: G. Charnoff R. C. Callen P. N. Steketee R. >lalsh

.R. >f. Jurgensen - Bridgman R. J. Vollen John Tillinghast

~