ML18219C349
| ML18219C349 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 04/23/1976 |
| From: | Jurgensen R American Electric Power Service Corp, Indiana Michigan Power Co, (Formerly Indiana & Michigan Power Co) |
| To: | James Keppler NRC/IE, NRC/RGN-III |
| References | |
| Download: ML18219C349 (3) | |
Text
t i
UNITCD STATCS t
NUCLCAA BEGULAl'OIIY COMMISSION AEQION III
'799 AOOSCVCLT AOAO'LEN CLLYN, ILLINOIS GO!97 S
GII! I ~
Incident Notification From:
indiana 8I htiChi an POWer CO 5p-315 (Licensee
& Docket No. {or Lz
))
Transmittal Date:
Distribution:
June 4, 1976 0.
C.
Cook Plant Unit 1
Distribution:
IE Chic f, FOSB IE Chief, FC&EB IE:HQ (4)
'icensing(4) ltKS IE Files IE Chief, FOSB IE Chief, FC&EB IE: HQ {4)
L:D/D for Fuels
& Materials DR Central Files IE Files
roon ysto IIVDIANA8 MICHIGAIVPDS'E8 COIÃPAIVY DONALD C. COOK NUCLEAR PLANT P.O. Box 458, Bridgman, Michigan 49106 April 23, 1976 Mr. J.G.
- Keppler, Regional Director Office of Inspection and Enforcement United States Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137
Dear Mr. Keppler:
Operating License DPR-58 Docket No. 50-315 This is to confirm our verbal report to NRC RO: III Inspector, Mr. K.R. Baker, of April 22, 1976.
At that time we reported that auxiliary feed water valve FMO-211 was found to be installed with flow in the wrong direction.
A review of the consequences of this condition indicated that there were no adverse effects to the public health and safety.
We are continuing our investigation and will subm'it a formal report by May 6,
- 1976, as required by Nuclear Regulatory Commission Regulatory Guide 1.16, Revision 4, Section 2.a.
Since ly, R W. J ge n
Plant ana er
/bab cc:
R.S.
Hunter J.E.
Dolan G.E. Lien R. Kilburn R.J. Vollen BPI R.C. Callen MPSC K.R. Baker RO:III P.W. Steketee, Esq.
R. Walsh, Esq.
G. Charnoff, Esq.
G. Olson J.M. Hennigan PNSRC R.S. Keith Dir., IE (40 copies)
Dir., MIPC (4 copies)