Response to IE Bulletin No. 76-07 & IE Circular No. 76-01 Re Steps Taken or Planned to Provide Assurance That Brake Power Contractors Are Adequate for Service
ML18219C194
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 02/07/1977
From: Dolan J
American Electric Power Service Corp
To: James Keppler
NRC/RGN-III
References
IEB-76-007, IEC-76-001
Download: ML18219C194 (4)


Text

AMERICAN ELECTRIC POWER Service Corporation 2 13roadtt;ay, Neto York, N. Y. )OOO4 (212) 422.4800 JOHN E. DOLAÃ Stttior Ertttttire Vitt Prttidcnt Ettgitttttirg 8 Cotttttttttiott February 7, 1977 Donald C. Cook Nuclear Plant Units Nos. 1 and 2 Docket Nos. 50-315 and 50-316 DPR No. 58 and. CPPR No. 61 U.S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region XXI 799 Roosevelt Ro d Glen Ellyn, Illinois 60136 Attention: Nv t'. G. Keno. ea B a'>

D'entlemen:

Xn our August 16, 1976 letter, we responded to 1E Bulletin No. 76-07 and XE Circular No. 76-01 both entitled "Crane Hoist Control Circuit Ytodifications," for book Nuclear Plant Units 1 and 2y respectively. Xn that letter, we indicated. that we had not, made nor did we intend. to make any modifications to the crane hoist con~rois similar to the modifications described. in the Bulletin and Circular.

Since that response," the NRC Resident Inspector has indicated that a response to Action Xtem l. (c) is necessary even though we are not making any modifications. This item states:

1. (c) "What steps have been taken or are planned., to provide assurance that brake power contactors are adeouate for the service~"

Lle have contacted the cran~ manufacturer, '<lhiting Corporation, and they have given us assurance that "the brake contactor sizes are adequate by means of the design verification."

Tn addition, they have upplied. us with all of the necessary information on the brake contactor sizing for the service involved.

FEB 30 l977

4 ~

Yir. Keppler February 7, 1977

)le have revie~red this information and <re concur with ~lhiting's conclusion.

'ery h truly yours, F.)

ohn E. Dolan O'ED: vp S enior executive Vzce Preszden Engineering and Construction Cce Dr. Z. Volgenau, Director IE) U.S.14.R.C.

G. Charnoff R. C. Callen P. 1J. Stel~etee R hralsh R.. Z. Vollen R. >1. Zurgensen - Bridgman R. S. Hunter