ML18219C124

From kanterella
Jump to navigation Jump to search
Letter from Indiana & Michigan Power Co to NRC on Revision to Plant Instructions to Require Prompt (within 2 Hours) Reporting of Inability to Perform Required Surveillance Test in Its Entirety on Its Scheduled Due Date
ML18219C124
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 04/10/1975
From: Jurgensen R
Indiana Michigan Power Co
To: James Keppler
NRC/RGN-III
References
Download: ML18219C124 (4)


Text

z Mh

~~ ~~i)~ >~Q~7$f NRC DISTRII.

ION FOR PART 50 DOCKET MAT (TEMPORARY FORM)

- CONTROL NO:

FILE INCIDENI'EPORT FILE FRpM:Indiana and Michigan Powe Cozpanyp Bridgmanp Mich. 49106 H.W. J Hr. J.G. Keppler DATE OF DOC 4=10-75 ORIG 1 signed DATE REC'D 4

CC OTHER 1

LTR TWX RPT SENT AEC PDR SENT LOCAL PDR OTHER CLASS UNCLASS PROP INFO INPUT NO CYS REC'D DOCKET NO:

50-315 DESCR IPTION: Ltr furnishing info. of a RMS channel.-malfunctioning causing incomplete surveillance test,.which was not reported.

To avoid, recurrence, plant instructions have bee revised now requiring prompt. reporting of in-ability to perform test in its entirety.

PLANT NAME: Donald C.

Coolr. Nuclear plant ENCLOSURES:

A <Ha>orVLZpGEp Da NOT RZMPyE FOR ACTION/INFORMATION NTM 4-25-75 BUTLFR {L)

W/ Copies CLARK (L)

W/ Conies non~ iI i

~ ~l 1 I l pl g

. ~W/ Copies

<KNIEL (L)

W opies SCI-IWENCER (L)

W/ Copies STOLZ (L)

'/ Copies

~ i Ii i r ii ~ i n I I 1

v nvvn~a v li.l W/ Copies PURPLE (L)

W/ Copies Z(EMANN (L)

W/ Copies DICKER (E)

W/ Copies

~/hl ~ 6 i IWAhI I~ ~

Ix>iIvI I I vI'0 \\cI W/ Copies YOUNGBLOOD (E)

W/ Copies REGAN (E)

W/ Copies LEAR (L)

W/ Copies SPE LS W/ Copies W/ Copies TECH REVIEW

~b.

R

~SCHROEDER OGC, ROOM P-506A c%IACCARY GQSSICK/STAFF KNIGHT

~CASE PAWLICKI GIAMiBUSSO SHAO BOYD

+"'rSTE LLO MOOR E (L)

HOUSTON DEYOUNG (L)

"~~NOVAK SKOVHOLT (L)

~ROSS GOLLER {L) (Ltr)

~ IPPOLITO P. COLLINS dVEDESCO DENISE LONG REG OPR LAI NAS WFII E 5 REGION (2)

BENAROYA

~.>'IIPC/PL (3j

~VOLLMER STEE LE INTERNALDISTR I BUTION DENTON QG R IMES GAMMILL KASTNER BALLARD SPANGLER ENVIRO MULLER DICKER KNIGHTON YOUNGB LOOD REGAN PROJECT LDR HAR LESS LIC ASST R. DIGGS (L)

H. GEARIN (L)

E. GOULBOURNE (L)

P. KREUTZER (E)

J. LEF (L)

M. MAIGRE I (L)

. REED (E)

. SERVICE (L)

S. SHEPPARD (L)

M. SLATER (E)

H. SiMITH (L)

S. TEETS (L)

G. WILLIAMS(E)

V. WILSO~ (L)

R. INGRAM (L)

EXTERNAL DISTRIBUTION A/T IND.

BRAITMAN SALTZMAN ME LTZ PLANS MCDONALD CHAPiVIAN DUBE (Ltr)

E. COUPE PETERSON HART F I E LD (2)

~ KLECKER EISENHUT WIGGINTON

~ F. WILLIA';IS

~ II

~1 LOCALPDR& ZQ5gPg PANIC fg,

~1 TIC (ABERNATHY) (l)I2)(10) NATIONALLABS

~1 NSI C (BUCHANAN) 1 W. PENNINGTON, Rm E-201 GT 1 ASLB 1

CONSULTANTS 1 Newton Anderson NEWMARK/8LUME/AGBABIAN

~>- ACRS SENT TO LIC ASST

<-'END ONLY TEN DAY REPORTS 1 P DR-SAN/LA/NY 1 BROOKHAVEN NAT LAB 1 G. ULRIKSON, ORNL 1

AGMED (RUTH GUSSY'lAN)

Rm 8-127 GT 1 J. D. RUNKLES, Rm E-201 GT

II h

@tlt eo

~olnnn yste INDIAIVA8f MICHIGANPOWER COMPANY DONALD C. COOK NUCLEAR PLANT P.O. Box 458, Bridgman, Michigan 49106

@fe ~c OOCÃEEEO E VSELRC APR281975' 8

April 10, 1975 V.S. HVCLEAR REGVLAEORY COMM I SS loll Moll Soelon 8r. J.

G. Keppler, Regional Director Office of Inspection and Enforcemeni United States Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137

~.~Q (L.v At'RI',et97s-

/ Ef Min I+II'If tiiiil', ';.tf L'Stl 8.."tl>S Operating License DPR-58 Docket No.

50-3I5 I

Mr. Kepp Ier:

During a" recent inspection by Mr. K. R. Baker, Resident Inspector, it was noted that the monthly functional test of the containment atmosphere gaseous monitoring, system R-11 was not completely performed on.January 7,

l975.

At the start of the

test, another RMS channel was malfunctioning which caused a

standing "High Radiation" alarm.

During ihe performance of the surveillance test, this alarm could not be functionally tested because of the condition described above.

Retesting when the faulty channel was repaired was overlooked until this require-ment was noted by Mr. Baker.

On February 6, 1975, the "High Radiation" annunciator was checked through partial performance of surveillance test procedure

"~THP 4030 STP.052.

The annun-ciator operated satisfactorily.

To avoid recurrence of this non-conformance, plant instruc-tions have been revised and now require prompt (within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />) reporting of an inability to perform a required surveillance test in its entirety on its scheduled due date.

This report is in the form of a surveillance testing status report (Attachment No.

1 to PMI 4030 Revision 1).

Full compliance has now been achieved.

Resp ully RWJ /ng cc:

J.

E. Dolan R.

S. Hunter R.

M. Kopper G. E. LeMasters APR 3, 8 ie75 4.W.Ju e

n Plant M nager G.: E. Lein PNSRC R. J. Vollen BPI K. R. Baker, Resident Inspector l.pl)73

t

~

M

,l II h

k L

I t.

J