Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule
ML18218A476
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 08/08/2018
From: Klecha J
Southern Nuclear Operating Co
To: Frederick Brown
Document Control Desk, Office of New Reactors
Shared Package
ML18218A475 List:
References
ND-18-1047
Download: ML18218A476 (8)


Text

Southern Nuclear Southern Nuclear Operating Company, Inc.

7825 River Road JOS6ph B. Klochs Waynesboro, GA SOSSO Vice President, Site Operations 706 343 3333 tei Plant Vogtle 3&4 jbl<lecha@southernco.com August 8, 2018 Docket Nos.:

52-025 ND-18-1047 52-026 U. 8. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Mr.

Fred Brown Director, Office of New Reactors U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Voatle Electric Generating Plant - Units 3 and 4 Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule Ladies and Gentlemen:

The U.S. Nuclear Regulatory Commission (NRC) issued Combined Licenses (COLs) NPF-91 and NPF-92 to Southern Nuclear Operating Company (SNC) pursuantto Title 10 ofthe Code of FederalRegulations CFR) Section 52.97, "Issuance ofcombined licenses," on February 10, 2012.

Two license conditions require SNC to submit, no later than twelve months afterissuance of the COL, the following:

  • Aschedule for implementation ofthe operational programs listed in the Final Safety Analysis Report Table 13.4-201, including theassociated estimated datefor initial loading of fuel (COL section 2.D.(11))
  • Aschedule for implementation of the license conditions listed in COL section 2.D.(12)(f)1-9 In accordance with the license conditions, the schedule shall be updated every six months until twelve months before scheduled fuel loading, and every month thereafter until each license condition has been fully implemented. containsthe updatedschedule. This information iscurrent as ofJuly21, 2018. As is typical with a construction project, the schedule information is dynamic in nature.

SNC's COL Operational Programs and Other License Conditions Implementation Schedule contains confidential commercial information. Pursuant to 10 CFR 2.390, SNC requests that the

U.S. Nuclear Regulatory Commission ND-18-1047 Page 2 of 5 specified information be withheld from public disclosure. In support of this request for withholding, SNC has attached to this letter the following documents: contains an Affidavit for withholding executed by SNC and prepared in accordance with 10 CFR 2.390, which specifies the confidential commercial information sought to be withheld and the basis on which the information may be withheld. contains the public, redacted version of SNC's COL Operational Programs and Other License Conditions Implementation Schedule. contains the non-public, non-redacted version of SNC's COL Operational Programs and Other License Conditions Implementation Schedule. contains the public, redacted version of SNC's Preoperational Test Procedure Completion Schedule. contains the non-public, non-redacted version of SNC's Preoperational Test Procedure Completion Schedule. contains a Confidential Commercial Information Notice.

SNC requests that Enclosure3, COL Operational Programs and Other LicenseConditions Implementation Schedule, and Enclosure 5, Preoperational Test Procedure Completion Schedule, be withheld from public disclosure under 10 CFR 2.390. The redacted versions in and Enclosure 4 are suitable for public disclosure.

This letter contains no regulatory commitments.

If you have any questions, please contact Michael Yox at (706)848-6459.

(Oath and Affirmation are provided on the following page.)

U.S. Nuclear Regulatory Commission ND-18-1047 Page 3 of 5 Mr. Joseph B. Klecha states that: he is the Vice President, Site Operationsof Vogtle 3 &4 of Southern NuclearOperating Company; he is authorized to execute this oath on behalfof Southern Nuclear Operating Company; and to the best of his knowledge and belief,the facts set forth in this letter are true.

Respectfully submitted, SOUTHERN NUCLEAR OPERATING COMPANY Sincerely, Joseph B. Klecha^

Vice President, Site Operations of Vogtle 3 &4 JBK/CMP/AMW Sworn to and si Notary Public:

Mycommission expires:

Enclosures cribed I

befopevme this (Ov-day of pevme the (Oy-dav of ViVU/u V) \\

,2018 Ui... J V'? am ci J

So:

s 1.

Affidavit for Withholding

2. Redacted COL Operational Programs and OtnWWBense Conditions Implementation Schedule
3. Non-Redacted COL Operational Programs and Other License Conditions Implementation Schedule{Withhold from Public Disclosure}
4. Redacted PreoperationalTest Procedure Completion Schedule
5. Non-Redacted Preoperational Test Procedure Completion Schedule (Withhold from Public Disclosure) 6.

Confidential Commercial Information Notice

U.S. Nuclear Regulatory Commission ND-18-1047 Page 4 of 5 cc:

Southern Nuclear Operating Company / Georgia Power Companv Mr. 8. E. KuczynskI (w/o enclosures)

Mr. J. B. Klecha Mr. G. Chick Mr. D. G. Bost (w/o enclosures)

Mr. M. D. Meier (w/o enclosures)

Mr. D. H. Jones (w/o enclosures)

Mr. D. L. McKinney (w/o enclosures)

Mr. T.W. Yelverton (w/o enclosures)

Mr. B. H. Whitley Mr. 0. R. Pierce Ms. A. G. Aughtman Mr. W. A. Sparkman Ms. A. 0. Chamberlain Mr. O. J. Miller Mr. J. D. Williams Mr. M. J. Vox Ms. A. Pugh Ms. K. A. Roberts Ms. K. M. Stacy Mr. C. T. Defnall (w/o enclosures 3&5)

Document Services RTYPE; VND.Li.LGG File AR.01.02.06 Nuclear Reoulatorv Commission Mr. W. Jones Ms. J. M. Heisserer Mr. C. P. Patel Mr. M. E. Ernstes Mr. G. J. Khouri Ms. S. E. Temple Mr. A. J. Lerch Mr. C. J. Even Mr. B. J. Davis Mr. B. J. Kemker Ms. C.D. Taylor Mr. T. McGinty Mr. R. Taylor Golethorpe Power Corooration Mr. M.W. Price (w/o enclosures 3&5)

Mr. K. T. Haynes (w/o enclosures 3&5)

Municipal Electric Authoritv of Georgia Mr.J. E. Fuller (w/o enclosures 3&5)

Mr. S. M. Jackson (w/o enclosures 3&5)

U.S. Nuclear Regulatory Commission ND-18-1047 Page 5 of 5 Dalton Utilities Mr. D. Cope (w/o enclosures 3&5)

Westinahouse Electric Comoanv. LLC Dr. L. Oriani (w/o enclosures)

Mr. D. C. Durham (w/o enclosures)

Ms. L. G. Iller Mr. D. Hawkins Ms. J. Monahan Mr. J. L. Coward Mr. M. M. Corletti Other Dr. W. R. Jacobs, Jr., Ph.D., GDS Associates, Inc. (w/o enclosures 3&5)

Mr. S. Roetger, Georgia Public Service Commission (w/o enclosures 3&5)

Ms. 8. W. Kernlzan, Georgia Public Service Commission (w/o enclosures 3&5)

Mr. K. C. Greene, Troutman Sanders (w/o enclosures 3&5)

Mr. S. Blanton, Balch BIngham

Southern Nuclear Operating Company ND-18-1047 Affidavit for Withholding Prepared in Accordance with 10 CFR 2.390 for Southern Nuclear Operating Company (This Enclosure consists of 3 pages, including this cover page)

AFFIDAVIT Before me, the undersigned authority, personally appeared Joseph B. Klecha who, being by me duly sworn according to law, deposes and says that he is authorized to execute this Affidavit on behalf of Southern Nuclear Operating Company, and that the statements of fact set forth in this Affidavit are true and correct to the best of his knowledge, information, and belief:

Joseph B. Klecha lis

, 2018 in SWORN to and SUBSCRIBED before me this v "*=-day of County,.

expires ^ *.(/);

Notary Public:

My Commission Expires:

^

STATES THE AFFIANT:

1.

My name is Joseph B. Klecha, and Iam over the age of 18. My office is located in Burke County, Georgia. Iam employed bySouthern Nuclear Operating Company ("SNC") as the Vice President, Site Operations of Vogtle 3&4.

I am authorized to make this affidavit on behalf of SNC.

2.

I have personal knowledge of the criteria and procedures used by SNC to designate information as trade secrets, privileged or as confidential commercial or financial information.

Page 2 of 3

3.

In accordance with 10 C.F.R. 2.390, I am making this Affidavit to support SNC's request for withholding, contained in the letter accompanying this Affidavit.

The specific information to be withheld is contained on pages 1 - 6 of Enclosure 3 (COL Operational Programs and Other License Conditions Implementation Schedule) and pages 1 -

9 of (Preoperational Test Procedure Completion Schedule).

4.

The information is sought to be withheld under 10 C.F.R. 2.390(a)(4), as it is confidential commercial information.

In support of this request for withholding and pursuant to 10 C.F.R. 2.390(b)(4), I state the following:

SNC has held the information in confidence.

i.

This information is of a type customarily held in confidence by SNC.

ii.

This information is being transmitted to the NRC in confidence.

V.

This information is not available in public sources.

V.

The public disclosure of the information sought to be withheld is likely to cause substantial harm to SNC's competitive position.

The information sought to be withheld contains aspects of SNC's development plans, the release of which will likely cause harm by allowing other entities to gain a competitive advantage through prior knowledge of SNC's construction and procurement plans.

FURTHER AFFIANT SAITH NOT.

Page 3 of 3