NRC FORM 591M PART 1 U.S. NUCLEAR REGULATORY COMMISSION (07-2012) 10CFR2.201 SAFETY INSPECTION REPORT AND COMPLIANCE INSPECTION
- 1. LICENSEE/LOCATION INSPECTED:
Peabody Midwest Mining, LLC 566 Dickeyville Road Lynnville, IN 47619 REPORT NUMBER(S) 2018001 3. DOCKET NUMBER($)
030-34405 LICENSEE:
- 2. NRG/REGIONAL OFFICE 4. LICENSE NUMBER($)
13-26785-0 I Region III U.S. Nuclear Regulatory Commission 2443 Warrenville Road, Suite 210 Lisle, IL 60532-4352
- 5. DATE(S) OF INSPECTION July 26, 2018 The inspection was an examination of the activities conducted under your license as they relate to radiation safety and to compliance with the Nuclear Regulatory Commission (NRC) rules and regulations and the conditions of your license. The inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations by the inspector.
The inspection findings are as follows: [{] 1. D 2. D 3. D 4. Based on the inspection findings, no violations were identified.
Previous violation(s) closed. The violations(s), specifically described to you by the inspector as non-cited violations, are not being cited because they were self-identified, non-repetitive, and corrective action was or is being taken, and the remaining criteria in the NRC Enforcement Policy, to exercise discretion, were satisfied.
Non-cited violation(s) were discussed involving the following requirement(s):
During this inspection, certain of your activities, as described below and/or attached, were in violation of NRC requirements and are being cited in accordance with NRC Enforcement Policy. This form is a NOTICE OF VIOLATION, which may be subject to posting in accordance with 10 CFR 19.11. (Violations and Corrective Actions) Statement of Corrective Actions I hereby state that, within 30 days, the actions described by me to the Inspector will be taken to correct the violations identified.
This statement of corrective actions is made in accordance with the requirements of 10 CFR 2.201 (corrective steps already taken, corrective steps which will be taken, date when full compliance will be achieved).
I understand that no further written response to NRC will be required, unless specifically requested.
TITLE PRINTED NAME SJGNA TURE DA TE LICENSEE'S REPRESENTATIVE NRC INSPECTOR Luis Nieves Folch BRANCH CHIEF Aaron T. Mccraw NRC FORM 591M PART 1 (07-2012)
,, . ;f-;y1)1 -~( ATM NRC FORM 591M PART 3 (07-2012) 10 CFR2.201 U.S. NUCLEAR REGULATORY COMMISSION Docket File Information SAFETY INSPECTION REPORT AND COMPLIANCE INSPECTION
- 1. LICENSEE/LOCATION INSPECTED:
Peabody Midwest Mining, LLC 566 Dickeyville Road Lynnville, IN 47619 REPORT NUMBER(S) 2018001 3. DOCKET NUMBER(S) 030-34405
- 6. INSPECTION PROCEDURES USED 87124 2. NRG/REGIONAL OFFICE 4. LICENSE NUMBER(S) 13-26785-01 Region III U. S. Nuclear Regulatory Commission 2443 Warrenville Road, Suite 210 Lisle, IL 60532-4352
- 5. DATE(S) OF INSPECTION July 26, 2018 7. INSPECTION FOCUS AREAS 03.01-03.08 SUPPLEMENTAL INSPECTION INFORMATION
- 1. PROGRAM CODE(S) 03120 2. PRIORITY 5 3. LICENSEE CONTACT Alan Pancake RSO 4. TELEPHONE NUMBER (812) 782-3293 D Main Office Inspection Next Inspection Date: July 26, 2023 [Z] Field Office Inspection Francisco, Indiana ------------------
D Temporary Job Site Inspection PROGRAM SCOPE This was an unannounced, routine inspection of a coal mine in Francisco and Oakland City, Indiana. The licensee possessed one specifically-licensed Gamma-Metrics Model 2000 gauge at the Oakland City location and three generally licensed Texas Nuclear Model 5201 gauges at the Francisco location.
The licensee was authorized to possess specifically licensed fixed gauges used in the processing of coal. Currently, one individual was involved with the use and oversight of the devices. The licensee hired the fixed gauge manufacturer to perform services such as removing and relocating the fixed gauge. Performance Observations The inspector toured the plant facilities and observed the location of the cesium-137 gauge. The inspector interviewed plant workers and determined that workers understood the proper emergency lock-out/tag-out procedures.
The inspector observed the postings for the gauge. All postings were legible. The inspector performed independent radiation measurements of the fixed gauge and did not identify any readings above regulatory compliance.
The inspector reviewed in office the following records: gauge inventories, annual audits, leak tests, and shutter checks with no issues noted. No violations ofNRC requirements were identified as a result of this inspection.
NRC FORM 591M PART 3 (07-2012)
Nieves Folch, Luis From: Sent: To:
Subject:
Attachments:
Dear Mr. Pancake,
Nieves Folch, Luis Friday, August 03, 2018 8:55 AM 'apa ncake@peabodyenergy.com' NRC Clear 591 report SKM_C45818080309410.pdf Attach is the clear 591 report for the inspection conducted on July 26, 2018. At this point there is no further actions on your part. In accordance with Title 10 of the Code of Federal Regulations 2.390 of the NRC's "Rules of Practice," a copy of this message will be available electronically for public inspection in the NRC's Public Document Room or from the NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC's website at http://www.nrc.gov/reading-rm/adams.html.
Please feel free to contact me if you have any questions regarding this correspondence.
Thank you, Luis Nieves Health Physicist U.S. Nuclear Regulatory Commission Division of Nuclear Materials Safety Office: (630) 829-9571 Fax: (630) 515-1259 1