Memo: Completion Verification Reports for Mixed Oxide Fuel Fabrication Facility Under Construction in Aiken, South Carolina
ML18204A213
Person / Time
Site: 07003098
Issue date: 08/28/2018
From: David Tiktinsky
Fuel Manufacturing Branch
To: Rachel Johnson
Fuel Manufacturing Branch
Tiktinsky D
Shared Package
ML18204A212 List:
References
Download: ML18204A213 (4)


Text

R UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 August 28, 2018 MEMORANDUM TO: Robert K. Johnson, Chief Fuel Manufacturing Branch Division of Fuel Cycle Safety, Safeguards, and Environmental Review Office of Nuclear Material Safety and Safeguards FROM: David H. Tiktinsky, Sr. Project Manager /RA/

Fuel Manufacturing Branch Division of Fuel Cycle Safety, Safeguards, and Environmental Review Office of Nuclear Material Safety and Safeguards

SUBJECT:

PRINCIPAL STRUCTURE, SYSTEM AND COMPONENT 011 ELECTROLYSER STRUCTURE; 014 EMERGENCY CONTROL SYSTEM; 015, EMERGENCY DC POWER SYSTEM, 033 MATERIAL MAINTENANCE AND SURVEILLANCE PROGRAMS 039 PTFE INSULATOR AND PSSC 040 PRESSURE VESSEL CONTROLS COMPLETION VERIFICATION REPORTS FOR MIXED OXIDE FUEL FABRICATION FACILITY UNDER CONSTRUCTION IN AIKEN, SOUTH CAROLINA (DOCKET NUMBER 70-3098)

The regulatory requirements of Title 10 of the Code of Federal Regulations (10 CFR) Paragraph 70.23(a)(8) states that an application for a license will be approved if the Commission determines that, where the proposed activity is the operation of a plutonium processing and fuel fabrication plant, construction of the Principal Structures, Systems and Components (PSSCs) approved pursuant to 10 CFR 70.23(b) has been completed in accordance with the application.

PSSCs are safety controls that are identified in the design bases as providing protection against the consequences of accidents or natural phenomena.

As stated in the Final Safety Evaluation Report for the License Application to Possess and Use Radioactive Material at the Mixed Oxide Fuel Fabrication Facility (MFFF) in Aiken, South Carolina issued in December 2010, As applicable to the specific type of PSSC, NRC construction inspection and/or the technical review programs will verify that the construction of each PSSC listed in Table 5.6-1 of the MFFF Construction Authorization Request (CAR) has been completed and the design basis safety function can be met.

On December 5, 2017, May 9, 2018, and May 17, 2018, CB&I AREVA MOX Services submitted letters notifying the U.S. Nuclear Regulatory Commission (NRC) that PSSC-011 (Electrolyser Structure) (Agencywide Documents Access and Management System (ADAMS)

Accession Number ML17339A183); PSSC-015 (Emergency DC Power System)

R. Johnson 2 ML17339A186; PSSC-039 (PTFE Insulator) ML17339A291; PSSC-033 (Material Maintenance)

ML18129A099; PSSC-014 (Emergency Control System) ML18137A464; and PSSC-040 (Pressure Vessel Controls) ML18129A091 are complete in accordance with the application in support of the regulatory requirements in 10 CFR 70.23(a)(8).

As stated in the enclosed PSSC closure reports, the staff has completed its verification of PSSC-011, 014, 015, 033, 039 and 040 and has concluded that, as per 10 CFR 70.23(a)(8),

that it is completed in accordance with the application.

In accordance with 10 CFR Section 2.390 of the NRCs Agency Rules of Practice and Procedure, a copy of this Memorandum will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRCs ADAMS. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If you have any questions or comments, please contact me at (301) 415-8740 or via e-mail at David.Tiktinsky@nrc.gov.

Enclosure:

PSSC Completion Verification Reports cc: see next page

R. Johnson 2

SUBJECT:

PRINCIPAL STRUCTURE, SYSTEM AND COMPONENT 011 ELECTROLYSER STRUCTURE; 014 EMERGENCY CONTOL SYSTEM; 015, EMERGENCY DC POWER SYSTEM, 033 MATERIAL MAINTENANCE AND SURVEILLANCE PROGRAMS 039 PTFE INSULATOR AND PSSC 040 PRESSURE VESSEL CONTROLS COMPLETION VERIFICATION REPORTS FOR MIXED OXIDE FUEL FABRICATION FACILITY UNDER CONSTRUCTION IN AIKEN, SOUTH CAROLINA (DOCKET NUMBER 70-3098)

DISTRIBUTION: MDiaz, NMSS ADAMS Accession Number: ML18204A212 (*via e-mail)

OFC FSCE/FMB FSCE/ERB Region II FCSE/FMB *Region II FCSE/FMB NAME DTiktinsky TBrockington *JEargle DTiktinsky MErnstes DTiktinsky for RJohnson DATE 08/08/18 08/08/18 08/20/18 08/27/18 8/27/18 08/28/18 OFFICIAL RECORD COPY

R. Johnson 3 cc:

Mr. Scott Cannon, Federal Project Director NA-262.1 Mr. Glenn Carroll P.O. Box A Nuclear Watch South Aiken, SC 29802 P.O. Box 8574 Atlanta, GA 30306 Mr. Joseph Olencz, NNSA/HQ 1000 Independence Ave., SW Mr. Louis Zeller Washington, DC 20585 Blue Ridge Environmental Defense League P.O. Box 88 Ms. Joyce Connery, Chairman Glendale Springs, NC 28629 Defense Nuclear Facilities Safety Board 625 Indiana Ave., NW, Suite 700 Mr. Dealis Gwyn Washington, DC 20004 Licensing Manager Shaw AREVA MOX Services Ms. Susan Jenkins Savannah River Site Division of Radioactive Waste Management P.O. Box 7097 Bureau of Health and Environmental Control Aiken, SC 29804-7097 2600 Bull Street Columbia, SC 29201 Ms. Kathryn M. Sutton Morgan, Lewis, & Bockius 1111 Penn. Ave., NW Washington, DC 20004