ML18204A085

From kanterella
Jump to navigation Jump to search
Concerning IE Circular 76-02, Shock Suppressors of the Hydraulic Type Are Not Used for Project WNP-2
ML18204A085
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 12/09/1976
From: Renberger D
Washington Public Power Supply System
To: Engelken R
NRC/RGN-V
References
IEC-76-02
Download: ML18204A085 (1)


Text

P 5S

~ Q~f..g Washin on Public Power Supply Syst~

A JOINT OPERATING AGENCY P

O BOX 968 3000 GEO, WASHINGTON WAY RICHLAND, WASHINGTON 99352 PHONC(5091 946 ~ 1611 December 9,

1976 G02-76-540 Nuclear Regulatory Commission Region V

Suite 202, Walnut Creek Plaza 1900 N. California Boulevard Walnut Creek, California 94596

~C~ "o.o~o<

j-'""<wy v'

~-

Cg I

Attention:

Mr. R.

H. Engelken Director

Subject:

WPPSS NUCLEAR PROJECT NO.

2 IE CIRCULAR NO. 76-05 DOCKET NUMBER 50-397

Reference:

Letter, R.H.

Engelken to J.J.

Stein, same subject, dated October 8, 1976

Dear Mr. Engelken:

The Supply System has requested our A/E to review the appli-cability of the subject circular to Project WNP-2.

Our A/E reports that IE Circular 76-02 does not apply to WNP-2, since shock suppressors of the hydraulic type are not utilized for this project.

Very truly yours, DLR:GLC:ho D. L.

RENBERGER Assistant Director Gener ation and Technology cc:

Mr. D.iRoe - Bon'neville Power Administration NRC - Office of Inspection 5 Enforcement (Washington, D.C.)