ML18204A085
| ML18204A085 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 12/09/1976 |
| From: | Renberger D Washington Public Power Supply System |
| To: | Engelken R NRC/RGN-V |
| References | |
| IEC-76-02 | |
| Download: ML18204A085 (1) | |
Text
P 5S
~ Q~f..g Washin on Public Power Supply Syst~
A JOINT OPERATING AGENCY P
O BOX 968 3000 GEO, WASHINGTON WAY RICHLAND, WASHINGTON 99352 PHONC(5091 946 ~ 1611 December 9,
1976 G02-76-540 Nuclear Regulatory Commission Region V
Suite 202, Walnut Creek Plaza 1900 N. California Boulevard Walnut Creek, California 94596
~C~ "o.o~o<
j-'""<wy v'
~-
Cg I
Attention:
Mr. R.
H. Engelken Director
Subject:
WPPSS NUCLEAR PROJECT NO.
2 IE CIRCULAR NO. 76-05 DOCKET NUMBER 50-397
Reference:
Letter, R.H.
Engelken to J.J.
- Stein, same subject, dated October 8, 1976
Dear Mr. Engelken:
The Supply System has requested our A/E to review the appli-cability of the subject circular to Project WNP-2.
Our A/E reports that IE Circular 76-02 does not apply to WNP-2, since shock suppressors of the hydraulic type are not utilized for this project.
Very truly yours, DLR:GLC:ho D. L.
RENBERGER Assistant Director Gener ation and Technology cc:
Mr. D.iRoe - Bon'neville Power Administration NRC - Office of Inspection 5 Enforcement (Washington, D.C.)