ML18204A083

From kanterella
Jump to navigation Jump to search
Response to IE Bulletin 77-01, No Ite Pneumatic Time Delay Relays Are Used in Safety Related Systems
ML18204A083
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 06/29/1977
From: Renberger D
Washington Public Power Supply System
To: Engelken R
NRC/RGN-V
References
IEB-77-01
Download: ML18204A083 (1)


Text

P&

Washington Public Power Supply System A JOINT OPERATING AGENCY P. 0. BOX 968 3000 GSO. WASHINOTON WAY RICHLAND. WASHINOTON SSS52 PHONE (609) 946.968 I Nuclear Regulatory Commission Region V

Suite 202, Walnut Creek Plaza 1900 N. California Boulevard Walnut Creek, California 94596 Attention:

Mr. R.

H. Engelken Director June 29, 1977 G02-77-246 I "II pl Q)l i ~

~7

Subject:

WPPSS NUCLEAR PROJE NO.

2 IE BULLETIN NO. 77-0 DOCKET NUMBER 50-397

Reference:

Letter, R.H. Engelken to D.L. Renberger, same subject, dated April 28, 1977.

Dear Mr. Engelken:

-The referenced letter transmitted IE Bulletin 77-01 concerning ITE pneumatic time delay relays which are used on Colt Industries (Fair-banks-Morse) diesel generators'n response to this IE Bulletin, no ITE pneumatic time delay relays are used in safety.related systems.

All pneumatic time delay relays used on safety related systems will have a repeat accuracy range smaller than +15Ã.

Very truly yours, D. L.

RENBERGER Assistant Director Generation 8 Technology DLR:GLC:ho cc:

Mr. D. Roe, Bonneville Power Administration NRC - Office of Inspection

5. Enforcement (Washington, D.C.)