ML18204A082

From kanterella
Jump to navigation Jump to search
In Response to the Questions Asked in IE Bulletin 78-02, There Are No Unprotected Terminal Block Used in WNP-2 in Systems Which Must Function in the Post-Accident Environment
ML18204A082
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 03/03/1978
From: Renberger D
Washington Public Power Supply System
To: Engelken R
NRC/RGN-V
References
IEB-78-02
Download: ML18204A082 (1)


Text

0 Q

P. O. BOX DOG 3000 GXO. WASNINC'ION WAY AICNI.AND, WASNINC'ION 99352 PNONC (50II) 375 5000 March 3, 1978 G02-78-84 Washington Public Power Supply System A, JOINT OPERATING AGENCY Nuclear Regulatory Commission Region V

Suite 202, Halnut Creek Plaza 1990 N. California Boulevard Halnut Creek, CA 94596 Attention:

ttr.'.

H; Engelken Director

@8~".

i)

P.

Subject:

Reference:

HPPSS NUCLEAR PROJECT NO.

2 IE BULLETIN NO. 78-02 DOCKET NO. 50-397

Letter, R.

H. Engelken to N. 0. Strand, Same Subject, January 30, 1978.

Dear t1r.

Engel ken:

The reference letter transmitted the subject IE Bulletin.

In response to the questions asked in IE Bulletin No. 78-02, our AE reports that there are no unprotected terminal blocks used in HNP-2 in systems which must function in the post-accident environment.

The above information supports our compliance with IE Bulletin 78-02.

Very truly yours, DLR:GLC:ct D. L.

RENBERGER

. Assistant Director Generation tm Technology cc:

Mr.

D. Roe, Bonneville Power Administration NRC, Office of Inspection and Enforcement (ltashington D.C.)