ML18199A110
| ML18199A110 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 06/18/2018 |
| From: | Dominion Energy Nuclear Connecticut |
| To: | Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML18199A125 | List:
|
| References | |
| 18-225 | |
| Download: ML18199A110 (7) | |
Text
{
Dominion Energy Nuclear Connecticut, Inc.
Rt 156, Rope Ferry Road, Waterford, CT 06385 Dominion Energy.com JUN 1 8 2018
~
Dominion pr Energy SECURITY-RELATED INFORMATION - WITHHOLD UNDER 10 CFR 2.390 U.S. Nuclear Regulatory Commission Attention: Document Control Desk
. Washington, DC 20555 DOMINION ENERGY NUCLEAR CONNECTICUT, INC.
MILLSTONE POWER STATION UNITS 2, AND 3 UPDATES TO THE FINAL SAFETY ANALYSIS REPORTS Serial No.
MPS Lic/GJC Docket Nos.*
License Nos.18-225 RO 50-336 50-423 DPR-65 NPF-49 In accordance with 10 CFR 50.71(e), Dominion Energy Nuclear Connecticut, Inc. (DENG) hereby submits revisions to the Millstone Power Station Units 2 and 3 (MPS2 and MPS3)
Four CD-ROMs are included in this submittal. contains a CD-ROM labeled:
Millstone Power Station Unit 2 Final Safety Analysis Report Revision 36 Docket No. 050-00336
- Security-Related Information - Withhold Under 10 CFR 2.~90. The CD-ROM contains the electronic version of the MPS2 FSAR Revision 36 in the following files:
File Name 000 MPS U2 FSAR Frontmatter.pdf File Description Revision History, List of Abbreviations, List of Effective Sections, List of Effective Tables, List of Effective Figures File Size (Bytes) 2,677,585 001 MPS U2 FSAR Chapter 1.pdf Chapter 1 (all content) 1,750,243 002 MPS U2 FSAR Chapter 2.pdf Chapter 2 (all content) 12,574,000 003 MPS U2 FSAR Chapter 3.pdf Chapter 3 (all content) 16,703,729 004 MPS U2 FSAR Chapter 4.pdf Chapter 4 (all content) 16,162,061 005 MPS U2 FSAR Chapter 5.pdf Chapter 5 (all content) 47,006,458 006 MPS U2 FSAR Chapter 6.pdf Chapter 6 (all content) 8,464,425 007 MPS U2 FSAR Chapter 7.pdf 008 MPS U2 FSAR Chapter 8.pdf Chapter 7 (all content)
Chapter 8 (all content) 10,777,261 2,758,126 009 MPS U2 FSAR Chapter 9.pdf Chapter 9 (all content) 17,772,947 010 MPS U2 FSAR Chapter 10.pdf Chapter 10 (all content) 437,868 011 MPS U2 FSAR Chapter 11.pdf Chapter 11 (all content) 5,249,706 ENCLOSURES 1 & 3 TO THIS LETTER CONTAIN SECURITY-RELATED INFORMATION WHICH IS TO BE WITHHELD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390.
UPON REMOVAL OF ENCLOSURES 1 & 3, THIS LETTER IS DECONTROLLED.
SECURITY-RELATED INFORMATION - WITHHOLD UNDER 10 CFR 2.390 File Name File Description 012 MPS U2 FSAR Chapter 12.pdf Chapter 12 (all content) 013 MPS U2 FSAR Chapter 13.pdf Chapter 13 (all content) 014 MPS U2 FSAR Chapter 14.pdf Chapter 14 (all content) 015 MPS U2 FSAR Chapter 15.pdf 016 MPS 2 DWGS IBR.pdf 017 Millstone TRM (IBR).pdf Chapter 15 (all content)
MPS2 Drawings (incorporated by reference)
MPS2 Technical Requirements Manual (incorporated by reference)
Serial No.18-225 FSAR Updates Page 2 of 7 File Size (Bytes) 176,186 1,341,962 37,673,553 359,421 69,849,950 6,085,117 This enclosure contains Security-Related Information and is requested that it be withheld from public disclosure in accordance with 10 CFR 2.390. contains a CD-ROM labeled: Millstone Power Station Unit 2 Final Safety Analysis Report Revision 36 Docket No. 050-00336 - Redacted. The CD-ROM contains the electronic version of the MPS2 FSAR Revision 36 in the following files:
File Name 000 MPS U2 FSAR Frontmatter.pdf 001 MPS U2 FSAR Chapter 1_R.pdf File Description Revision History, List of Abbreviations, List of Effective Sections, List of Effective Tables, List of Effective Figures Chapter 1 (all content) 002 MPS U2 FSAR Chapter 2_R.pdf Chapter 2 (all content) 003 MPS U2 FSAR Chapter 3.pdf Chapter 3 (all content) 004 MPS U2 FSAR Chapter 4.pdf 005 MPS U2 FSAR Chapter 5_R.pdf 006 MPS U2 FSAR Chapter 6.pdf 007 MPS U2 FSAR Chapter 7 _R.pdf 008 MPS U2 FSAR Chapter 8_R.pdf 009 MPS U2 FSAR Chapter 9.pdf Chapter 4 (all content)
Chapter 5 (all content)
Chapter 6 (all content)
Chapter 7 (all content)
Chapter 8 (all content)
Chapter 9 (all content)
File Size (Bytes) 2,677,585 1,224,875 11,189,081 16,703,729 16,162,061 45,426,537 8,464,425 8,794,230 934,798 17,772,947 010 MPS U2 FSAR Chapter 10.pdf Chapter 10 (all content) 437,868 011 MPS U2 FSAR Chapter 11_R.pdf Chapter 11 (all content) 2,996,148 ENCLOSURES 1 & 3 TO THIS LETTER CONTAIN SECURITY-RELATED INFORMATION WHICH IS TO BE WITHHELD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390.
UPON REMOVAL OF ENCLOSURES 1 & 3, THIS LETTER IS DECONTROLLED.
_ _J
SECURITY-RELATED INFORMATION - WITHHOLD UNDER 10 CFR 2.390 File Name 012 MPS U2 FSAR Chapter 12.pdf 013 MPS U2 FSAR Chapter 13.pdf File Description Chapter 12 (all content)
Chapter 13 ( all content)
Serial No.18-225 FSAR Updates Page 3 of 7 File Size (Bytes) 176,186 1,341,962 014 MPS U2 FSAR Chapter 14.pdf Chapter 14 (all content) 37,673,553 015 MPS U2 FSAR Chapter 15.pdf 016 MP2 IBR DWGS.pdf 017 Millstone TRM (IBR).pdf Chapter 15 (all content)
MPS2 Drawings (incorporated by reference)
MPS2 Technical Requirements Manual (incorporated by reference) 359,421 57,440,585 6,100,069 contains a CD-ROM labeled: Millstone Power Station Unit 3 Final Safety Analysis Report Revision 31 Docket No. 050-00423 - Security-Related Information - Withhold Under 10 CFR 2.390. The CD-ROM contains electronic version of MPS3 FSAR, Revision 31 in the following files:
File Name 000 MPS U3 FSAR Frontmatter.pdf 001 MPS U3 FSAR Chapter 1.pdf 002a MPS U3 FSAR Chapter 2_(Part 1 ).pdf 002b MPS U3 FSAR Chapter 2_(Part 2).pdf 002c MPS U3 FSAR Chapter 2_(Part 3).pdf 002d MPS U3 FSAR Chapter 2_ Tables &
Appendices.pdf File Description Revision History, List of Abbreviations, List of Effective Sections, List of Effective Tables, List of Effective Figures Chapter 1 (all content)
MPS3 FSAR Chapter 2 Table of Contents, List of Tables, List of Figures. Sections 2.1 through 2.4.14, Figures 2.1-1 through 2.1-12, 2.1-1 through 2.2-5, 2.3-1 through 2.3-7 MPS3 FSAR Chapter 2 Table of Contents, List of Tables, List of Figures, Sections 2.4 through 2.5.6, Figures 2.4-1 through 2.4-37, 2.5.1-1 through 2.5.1-18, 2.5.2-1 through 2.5.2-10, 2.5.3-1 through 2.5.3-3, 2.5.4-1 through 2.5.4-75, 2.5.5-1 through 2.5.5-7 MPS3 FSAR Chapter 2 Table of Contents, List of Tables, List of Figures, Sections 2.5.4 through 2.5.6, Figures 2.5.4-1 through 2.5.4-75, 2.5.5-1 through 2.5.5-7, Appendix 2.5A through Appendix 2.5M File Size (Bytes) 3,399,732 2,588,598 11,552,909 56,929,462 82,574,193 MPS3 FSAR Chapter 2 Tables and Appendices.
98,958,387 ENCLOSURES 1 & 3 TO THIS LETTER CONTAIN SECURITY-RELATED INFORMATION WHICH IS TO BE WITHHELD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390.
UPON REMOVAL OF ENCLOSURES 1 & 3, THIS LETTER IS DECONTROLLED.
SECURITY-RELATED INFORMATION-WITHHOLD UNDER 10 CFR 2.390 File Name 003 MPS U3 FSAR Chapter 3.pdf 004 MPS U3 FSAR Chapter 4.pdf 005 MPS U3 FSAR Chapter 5.pdf 006 MPS U3 FSAR Chapter 6.pdf 007 MPS U3 FSAR Chapter 7.pdf 008 MPS U3 FSAR Chapter 8.pdf 009 MPS U3 FSAR Chapter 9.pdf 010 MPS U3 FSAR Chapter 1 O.pdf 011 MPS U3 FSAR Chapter 11.pdf File Description Chapter 3 (all content)
Chapter 4 (all content)
Chapter 5 (all content)
Chapter 6 (all content)
Chapter 7 (all content)
Chapter 8 (all content)
Chapter 9 (all content)
Chapter 10 (all content)
Chapter 11 ( all content) 012 MPS U3 FSAR Chapter 12.pdf Chapter 12 (all content) 013 MPS U3 FSAR Chapter 13.pdf Chapter 13 (all content) 014 MPS U3 FSAR Chapter 14.pdf 015 MPS U3 FSAR Chapter 15.pdf 016 MPS U3 FSAR Chapter 16.pdf 017 MPS U3 FSAR Chapter 17.pdf 018 MPS U3 FSAR Chapter 18.pdf 019 MPS U3 FSAR Chapter 19.pdf Chapter 14 (all content)
Chapter 15 (all content)
Chapter 16 ( all content)
Chapter 17 ( all content)
Chapter 18 ( all content)
Chapter 19 ( all content)
Serial No.18-225 FSAR Updates Page 4 of 7 File Size (Bytes) 90,751,851 6,520,428 4,276,582 17,568,131 6,548,459 8,991,436 18,854,961 4,423,878 3,298,598 32,130,812 978,660 2,351,204 285,191 60,405 65,183 72,125 509,249 020 MPS U3 FSAR FPER.pdf MPS3 Fire Protection Evaluation Report (FPER) 2,088,434 021 MPS 3 DWGS IBR.pdf MPS3 Drawings (incorporated by reference) 76,142,318 022 Millstone TRM (IBR).pdf MPS3 Technical Requirements Manual (TRM)
(incorporated by reference) 6,331,184 This enclosure contains Security-Related Information and is requested that it be withheld from public disclosure in accordance with 10 CFR 2.390.
ENCLOSURES 1 & 3 TO THIS LETTER CONTAIN SECURITY-RELATED INFORMATION WHICH IS TO BE WITHHELD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390.
UPON REMOVAL OF ENCLOSURES 1 & 3, THIS LETTER IS DECONTROLLED.
SECURITY-RELATED INFORMATION - WITHHOLD UNDER 10 CFR 2.390 Serial No.18-225 FSAR Updates Page 5 of 7 contains a CD-ROM labeled: Millstone Power Station Unit 3 Final Safety Analysis Report Revision 31 Docket No. 050-00423 -
Redacted.
The CD-ROM contains electronic version of MPS3 FSAR, Revision 31 in the following files:
File Name 000 MPS U3 FSAR Frontmatter.pdf File Description Revision H'istory, List of Abbreviations, List of Effective Sections, List of Effective Tables, List of Effective Figures File Size (Bytes}
3,399,732 001 MPS U3 FSAR Chapter 1_R.pdf Chapter 1 (all content) 1,144,944 002a MPS U3 FSAR Chapter 2_(Part 1 )_R.pdf 002b MPS U3 FSAR Chapter 2_(Part 2)_R.pdf MPS3 FSAR Chapter 2 Table of Contents, List of Tables, List of Figures. Sections 2.1 through 2.4.14, Figures 2.1-1 through 2.1-12, 2.1-1 through 2.2-5, 2.3-1 through 2.3-7 MPS3 FSAR Chapter 2 Table of Contents, List of Tables, List of Figures, Sections 2.4 through 2.5.6, Figures 2.4-1 through 2.4-37; 2.5.1-1 through 2.5.1-18, 2.5.2-1 through 2.5.2-10, 2.5.3-1 through 2.5.3-3, 2.5.4-1 through 2.5.4-75, 2.5.5-1 through 2.5.5-7 MPS3 FSAR Chapter 2 Table of Contents, List of Tables, List of Figures, Sections 2.5.4 9,497,263 53,244,635 002c MPS U3 FSAR Chapter 2_(Part 3)_R.pdf through 2.5.6, Figures 2.5.4-1 through 2.5.4-43,516,261 75, 2.5.5-1 through 2.5.5-7, Appendix 2.5A 002d MPS U3 FSAR Chapter 2_ Tables &
Append ices. pdf 003 MPS U3 FSAR Chapter 3_R.pdf through Appendix 2.5M MPS3 FSAR Chapter 2 Tables and Appendices.
Chapter 3 (all content) 98,958,387 45,809,723 004 MPS U3 FSAR Chapter 4.pdf Chapter 4 (all content) 6,520,428 005 MPS U3 FSAR Chapter 5.pdf Chapter 5 (all content) 4,276,582 006 MPS U3 FSAR Chapter 6_R.pdf 007 MPS U3 FSAR Chapter 7.pdf 008 MPS U3 FSAR Chapter 8_R.pdf Chapter 6 (all content)
Chapter 7 (all content)
Chapter 8 (all content) 009 MPS U3 FSAR Chapter 9.pdf Chapter 9 (all content) 010 MPS U3 FSAR Chapter 1 O.pdf Chapter 10 (all content) 011 MPS U3 FSAR Chapter 11.pdf Chapter 11 (all content) 012 MPS U3 FSAR Chapter 12_R.pdf Chapter 12 ( all content) 14,211,169 6,548,459 8,176,638 18,854,961 4,423,878 3,298,598 2,593,031 013 MPS U3 FSAR Chapter 13_R.pdf Chapter 13 ( all content) 970,201 ENCLOSURES 1 & 3 TO THIS LETTER CONTAIN SECURITY-RELATED INFORMATION WHICH IS TO BE WITHHELD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390.
UPON REMOVAL OF ENCLOSURES 1 & 3, THIS LETTER IS DECONTROLLED.
SECURITY-RELATED INFORMATION-WITHHOLD UNDER 10 CFR 2.390 File Name File Description Serial No.18-225 FSAR Updates Page 6 of 7 File Size (Bytes) 014 MPS U3 FSAR Chapter 14.pdf Chapter 14 (all content) 2,351,204 285,191 60,405 65,183 72,125 509,249 015 MPS U3 FSAR Chapter 15.pdf Chapter 15 (all content) 016 MPS U3 FSAR Chapter 16.pdf 017 MPS U3 FSAR Chapter 17.pdf 018 MPS U3 FSAR Chapter 18.pdf 019 MPS U3 FSAR Chapter 19.pdf 020 MPS U3 FSAR FPER_R.pdf 021 MPS 3 DWGS IBR.pdf 022 Millstone TRM (IBR).pdf Chapter 16 ( all content)
Chapter 17 (all content)
Chapter 18 ( all content)
Chapter 19 (all content)
MPS3 Fire Protection Evaluation Report (FPER)
MPS3 Drawings (incorporated by reference)
MPS3 Technical Requirements Manual (TRM) (incorporated by reference) 1,220,713 72,822,677 4,470,901 If you have any questions or require additional information, please contact Mr. Jeffry A. Langan, (860) 444-5544.
Sin?>;hV~
John R. Daugherty Site Vice President - Millstone STATE OF CONNECTICUT COUNTY OF NEW LONDON The foregoing document was acknowledged before me, in and for the County and State aforesaid, today by John R. Daugherty, who is Site Vice President -
Millstone of Dominion Energy Nuclear Connecticut, Inc.
He has affirmed before me that he is duly authorized to execute and file the foregoing document in behalf of that company, and that the statements in the document are true to the best of his knowledge and belief.
- tl-._
WM.-E: BROWN Acknowledged before me this \\B day of JYt:\\£...., 2018.
NOTARV:.PUBUC My Commission Expires:
Y COMMISSION UPIRI;,~ MAR; 31, 20:a -
ENCLOSURES 1 & 3 TO THIS LETTER CONTAIN SECURITY-RELATED INFORMATION WHICH IS TO BE WITHHELD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390.
UPON REMOVAL OF ENCLOSURES 1 & 3, THIS LETTER IS DECONTROLLED.
SECURITY-RELATED INFORMATION - WITHHOLD UNDER 10 CFR 2.390
Enclosures:
4 Commitments made in this letter: None.
cc: (w/ enclosures)
U.S. Nuclear Regulatory Commission Region I 2100 Renaissance Blvd, Suite 100 King of Prussia, PA 19406-2713 NRC Senior Resident Inspector Millstone Power Station cc: (w/o enclosures)
T. H. Carter NRC Project Manager Millstone Unit 1 U.S. Nuclear Regulatory Commission Two White Flint North, Mail Stop T-8 F8 11545 Rockville Pike Rockville, MD 20852-2738 L. A. Kauffman Health Physicist-DNMS U.S. Nuclear Regulatory Commission Region I 2100 Renaissance Blvd, Suite 100 King of Prussia, PA 19406-2713 R. V. Guzman NRC Senior Project Manager Millstone Units 2 and 3 U.S. Nuclear Regulatory Commission One White Flint North, Mail Stop 08 C2 11555 Rockville Pike Rockville, MD 20852-2738 Serial No.18-225 FSAR Updates Page 7 of 7 ENCLOSURES 1 & 3 TO THIS LETTER CONTAIN SECURITY-RELATED INFORMATION WHICH IS TO BE WITHHELD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390.
UPON REMOVAL OF ENCLOSURES 1 & 3, THIS LETTER IS DECONTROLLED.