ML18199A110

From kanterella
Jump to navigation Jump to search
Submittal of Updates to Final Safety Analysis Reports
ML18199A110
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 06/18/2018
From:
Dominion Energy Nuclear Connecticut
To:
Office of Nuclear Reactor Regulation
Shared Package
ML18199A125 List:
References
18-225
Download: ML18199A110 (7)


Text

Dominion Energy Nuclear Connecticut, Inc.

~ Dominion Rt 156, Rope Ferry Road, Waterford, CT 06385 Dominion Energy.com JUN 18 2018 pr Energy SECURITY-RELATED INFORMATION - WITHHOLD UNDER 10 CFR 2.390 U.S. Nuclear Regulatory Commission Serial No.18-225 Attention: Document Control Desk MPS Lic/GJC RO

. Washington, DC 20555 Docket Nos.* 50-336 50-423 License Nos. DPR-65

{ NPF-49 DOMINION ENERGY NUCLEAR CONNECTICUT, INC.

MILLSTONE POWER STATION UNITS 2, AND 3 UPDATES TO THE FINAL SAFETY ANALYSIS REPORTS In accordance with 10 CFR 50.71(e), Dominion Energy Nuclear Connecticut, Inc. (DENG) hereby submits revisions to the Millstone Power Station Units 2 and 3 (MPS2 and MPS3)

Four CD-ROMs are included in this submittal. Enclosure 1 contains a CD-ROM labeled:

Millstone Power Station Unit 2 Final Safety Analysis Report Revision 36 Docket No. 050-00336

- Security-Related Information - Withhold Under 10 CFR 2.~90. The CD-ROM contains the electronic version of the MPS2 FSAR Revision 36 in the following files:

File Size File Name File Description (Bytes)

Revision History, List of Abbreviations, List of 000 MPS U2 FSAR Frontmatter.pdf Effective Sections, List of Effective Tables, List of 2,677,585 Effective Figures 001 MPS U2 FSAR Chapter 1.pdf Chapter 1 (all content) 1,750,243 002 MPS U2 FSAR Chapter 2.pdf Chapter 2 (all content) 12,574,000 003 MPS U2 FSAR Chapter 3.pdf Chapter 3 (all content) 16,703,729 004 MPS U2 FSAR Chapter 4.pdf Chapter 4 (all content) 16,162,061 005 MPS U2 FSAR Chapter 5.pdf Chapter 5 (all content) 47,006,458 006 MPS U2 FSAR Chapter 6.pdf Chapter 6 (all content) 8,464,425 007 MPS U2 FSAR Chapter 7.pdf Chapter 7 (all content) 10,777,261 008 MPS U2 FSAR Chapter 8.pdf Chapter 8 (all content) 2,758,126 009 MPS U2 FSAR Chapter 9.pdf , Chapter 9 (all content) 17,772,947 010 MPS U2 FSAR Chapter 10.pdf Chapter 10 (all content) 437,868 011 MPS U2 FSAR Chapter 11.pdf Chapter 11 (all content) 5,249,706 ENCLOSURES 1 & 3 TO THIS LETTER CONTAIN SECURITY-RELATED INFORMATION WHICH IS TO BE WITHHELD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390.

UPON REMOVAL OF ENCLOSURES 1 & 3, THIS LETTER IS DECONTROLLED.

SECURITY-RELATED INFORMATION - WITHHOLD UNDER 10 CFR 2.390 Serial No.18-225 FSAR Updates Page 2 of 7 File Name File Description File Size (Bytes) 012 MPS U2 FSAR Chapter 12.pdf Chapter 12 (all content) 176,186 013 MPS U2 FSAR Chapter 13.pdf Chapter 13 (all content) 1,341,962 014 MPS U2 FSAR Chapter 14.pdf Chapter 14 (all content) 37,673,553 015 MPS U2 FSAR Chapter 15.pdf Chapter 15 (all content) 359,421 016 MPS 2 DWGS IBR.pdf MPS2 Drawings (incorporated by reference) 69,849,950 MPS2 Technical Requirements Manual 017 Millstone TRM (IBR).pdf 6,085,117 (incorporated by reference)

This enclosure contains Security-Related Information and is requested that it be withheld from public disclosure in accordance with 10 CFR 2.390.

Enclosure 2 contains a CD-ROM labeled: Millstone Power Station Unit 2 Final Safety Analysis Report Revision 36 Docket No. 050-00336 - Redacted. The CD-ROM contains the electronic version of the MPS2 FSAR Revision 36 in the following files:

File Size File Name File Description (Bytes)

Revision History, List of Abbreviations, List of 000 MPS U2 FSAR Frontmatter.pdf Effective Sections, List of Effective Tables, List of 2,677,585 Effective Figures 001 MPS U2 FSAR Chapter 1_R.pdf Chapter 1 (all content) 1,224,875 002 MPS U2 FSAR Chapter 2_R.pdf Chapter 2 (all content) 11,189,081 003 MPS U2 FSAR Chapter 3.pdf Chapter 3 (all content) 16,703,729 004 MPS U2 FSAR Chapter 4.pdf Chapter 4 (all content) 16,162,061 005 MPS U2 FSAR Chapter 5_R.pdf Chapter 5 (all content) 45,426,537 006 MPS U2 FSAR Chapter 6.pdf Chapter 6 (all content) 8,464,425 007 MPS U2 FSAR Chapter 7_R.pdf Chapter 7 (all content) 8,794,230 008 MPS U2 FSAR Chapter 8_R.pdf Chapter 8 (all content) 934,798 009 MPS U2 FSAR Chapter 9.pdf Chapter 9 (all content) 17,772,947 010 MPS U2 FSAR Chapter 10.pdf Chapter 10 (all content) 437,868 011 MPS U2 FSAR Chapter 11_R.pdf Chapter 11 (all content) 2,996,148 ENCLOSURES 1 & 3 TO THIS LETTER CONTAIN SECURITY-RELATED INFORMATION WHICH IS TO BE WITHHELD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390.

UPON REMOVAL OF ENCLOSURES 1 & 3, THIS LETTER IS DECONTROLLED.

__J

SECURITY-RELATED INFORMATION - WITHHOLD UNDER 10 CFR 2.390 Serial No.18-225 FSAR Updates Page 3 of 7 File Size File Name File Description (Bytes) 012 MPS U2 FSAR Chapter 12.pdf Chapter 12 (all content) 176,186 013 MPS U2 FSAR Chapter 13.pdf Chapter 13 (all content) 1,341,962 014 MPS U2 FSAR Chapter 14.pdf Chapter 14 (all content) 37,673,553 015 MPS U2 FSAR Chapter 15.pdf Chapter 15 (all content) 359,421 016 MP2 IBR DWGS.pdf MPS2 Drawings (incorporated by reference) 57,440,585 MPS2 Technical Requirements Manual 017 Millstone TRM (IBR).pdf 6,100,069 (incorporated by reference)

Enclosure 3 contains a CD-ROM labeled: Millstone Power Station Unit 3 Final Safety Analysis Report Revision 31 Docket No. 050-00423 - Security-Related Information - Withhold Under 10 CFR 2.390. The CD-ROM contains electronic version of MPS3 FSAR, Revision 31 in the following files:

File Size File Name File Description (Bytes)

Revision History, List of Abbreviations, List of 000 MPS U3 FSAR Frontmatter.pdf Effective Sections, List of Effective Tables, List of 3,399,732 Effective Figures 001 MPS U3 FSAR Chapter 1.pdf Chapter 1 (all content) 2,588,598 MPS3 FSAR Chapter 2 Table of Contents, List of Tables, List of Figures. Sections 2.1 through 002a MPS U3 FSAR Chapter 2_(Part 1).pdf 11,552,909 2.4.14, Figures 2.1-1 through 2.1-12, 2.1-1 through 2.2-5, 2.3-1 through 2.3-7 MPS3 FSAR Chapter 2 Table of Contents, List of Tables, List of Figures, Sections 2.4 through 2.5.6, Figures 2.4-1 through 2.4-37, 2.5.1-1 002b MPS U3 FSAR Chapter 2_(Part 2).pdf 56,929,462 through 2.5.1-18, 2.5.2-1 through 2.5.2-10, 2.5.3-1 through 2.5.3-3, 2.5.4-1 through 2.5.4-75, 2.5.5-1 through 2.5.5-7 MPS3 FSAR Chapter 2 Table of Contents, List of Tables, List of Figures, Sections 2.5.4 through 002c MPS U3 FSAR Chapter 2_(Part 3).pdf 2.5.6, Figures 2.5.4-1 through 2.5.4-75, 2.5.5-1 82,574,193 through 2.5.5-7, Appendix 2.5A through Appendix 2.5M 002d MPS U3 FSAR Chapter 2_Tables &

MPS3 FSAR Chapter 2 Tables and Appendices. 98,958,387 Appendices.pdf ENCLOSURES 1 & 3 TO THIS LETTER CONTAIN SECURITY-RELATED INFORMATION WHICH IS TO BE WITHHELD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390.

UPON REMOVAL OF ENCLOSURES 1 & 3, THIS LETTER IS DECONTROLLED.

SECURITY-RELATED INFORMATION-WITHHOLD UNDER 10 CFR 2.390 Serial No.18-225 FSAR Updates Page 4 of 7 File Size File Name File Description (Bytes) 003 MPS U3 FSAR Chapter 3.pdf Chapter 3 (all content) 90,751,851 004 MPS U3 FSAR Chapter 4.pdf Chapter 4 (all content) 6,520,428 005 MPS U3 FSAR Chapter 5.pdf Chapter 5 (all content) 4,276,582 006 MPS U3 FSAR Chapter 6.pdf Chapter 6 (all content) 17,568,131 007 MPS U3 FSAR Chapter 7.pdf Chapter 7 (all content) 6,548,459 008 MPS U3 FSAR Chapter 8.pdf Chapter 8 (all content) 8,991,436 009 MPS U3 FSAR Chapter 9.pdf Chapter 9 (all content) 18,854,961 010 MPS U3 FSAR Chapter 1O.pdf Chapter 10 (all content) 4,423,878 011 MPS U3 FSAR Chapter 11.pdf Chapter 11 (all content) 3,298,598 012 MPS U3 FSAR Chapter 12.pdf Chapter 12 (all content) 32,130,812 013 MPS U3 FSAR Chapter 13.pdf Chapter 13 (all content) 978,660 014 MPS U3 FSAR Chapter 14.pdf Chapter 14 (all content) 2,351,204 015 MPS U3 FSAR Chapter 15.pdf Chapter 15 (all content) 285,191 016 MPS U3 FSAR Chapter 16.pdf Chapter 16 (all content) 60,405 017 MPS U3 FSAR Chapter 17.pdf Chapter 17 (all content) 65,183 018 MPS U3 FSAR Chapter 18.pdf Chapter 18 ( all content) 72,125 019 MPS U3 FSAR Chapter 19.pdf Chapter 19 ( all content) 509,249 020 MPS U3 FSAR FPER.pdf MPS3 Fire Protection Evaluation Report (FPER) 2,088,434 021 MPS 3 DWGS IBR.pdf MPS3 Drawings (incorporated by reference) 76,142,318 MPS3 Technical Requirements Manual (TRM) 022 Millstone TRM (IBR).pdf 6,331,184 (incorporated by reference)

This enclosure contains Security-Related Information and is requested that it be withheld from public disclosure in accordance with 10 CFR 2.390.

ENCLOSURES 1 & 3 TO THIS LETTER CONTAIN SECURITY-RELATED INFORMATION WHICH IS TO BE WITHHELD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390.

UPON REMOVAL OF ENCLOSURES 1 & 3, THIS LETTER IS DECONTROLLED.

SECURITY-RELATED INFORMATION - WITHHOLD UNDER 10 CFR 2.390 Serial No.18-225 FSAR Updates Page 5 of 7 Enclosure 4 contains a CD-ROM labeled: Millstone Power Station Unit 3 Final Safety Analysis Report Revision 31 Docket No. 050-00423 - Redacted. The CD-ROM contains electronic version of MPS3 FSAR, Revision 31 in the following files:

File Size File Name File Description (Bytes}

Revision H'istory, List of Abbreviations, List of 000 MPS U3 FSAR Frontmatter.pdf Effective Sections, List of Effective Tables, 3,399,732 List of Effective Figures 001 MPS U3 FSAR Chapter 1_R.pdf Chapter 1 (all content) 1,144,944 MPS3 FSAR Chapter 2 Table of Contents, List of Tables, List of Figures. Sections 2.1 002a MPS U3 FSAR Chapter 2_(Part 1)_R.pdf 9,497,263 through 2.4.14, Figures 2.1-1 through 2.1-12, 2.1-1 through 2.2-5, 2.3-1 through 2.3-7 MPS3 FSAR Chapter 2 Table of Contents, List of Tables, List of Figures, Sections 2.4 through 2.5.6, Figures 2.4-1 through 2.4-37; 002b MPS U3 FSAR Chapter 2_(Part 2)_R.pdf 53,244,635 2.5.1-1 through 2.5.1-18, 2.5.2-1 through 2.5.2-10, 2.5.3-1 through 2.5.3-3, 2.5.4-1 through 2.5.4-75, 2.5.5-1 through 2.5.5-7 MPS3 FSAR Chapter 2 Table of Contents, List of Tables, List of Figures, Sections 2.5.4 002c MPS U3 FSAR Chapter 2_(Part 3)_R.pdf through 2.5.6, Figures 2.5.4-1 through 2.5.4- 43,516,261 75, 2.5.5-1 through 2.5.5-7, Appendix 2.5A through Appendix 2.5M 002d MPS U3 FSAR Chapter 2_Tables & MPS3 FSAR Chapter 2 Tables and 98,958,387 Append ices. pdf Appendices.

003 MPS U3 FSAR Chapter 3_R.pdf Chapter 3 (all content) 45,809,723 004 MPS U3 FSAR Chapter 4.pdf Chapter 4 (all content) 6,520,428 005 MPS U3 FSAR Chapter 5.pdf Chapter 5 (all content) 4,276,582 006 MPS U3 FSAR Chapter 6_R.pdf Chapter 6 (all content) 14,211,169 007 MPS U3 FSAR Chapter 7.pdf Chapter 7 (all content) 6,548,459 008 MPS U3 FSAR Chapter 8_R.pdf Chapter 8 (all content) 8,176,638 009 MPS U3 FSAR Chapter 9.pdf Chapter 9 (all content) 18,854,961 010 MPS U3 FSAR Chapter 1O.pdf Chapter 10 (all content) 4,423,878 011 MPS U3 FSAR Chapter 11.pdf Chapter 11 (all content) 3,298,598 012 MPS U3 FSAR Chapter 12_R.pdf Chapter 12 (all content) 2,593,031 013 MPS U3 FSAR Chapter 13_R.pdf Chapter 13 (all content) 970,201 ENCLOSURES 1 & 3 TO THIS LETTER CONTAIN SECURITY-RELATED INFORMATION WHICH IS TO BE WITHHELD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390.

UPON REMOVAL OF ENCLOSURES 1 & 3, THIS LETTER IS DECONTROLLED.

SECURITY-RELATED INFORMATION-WITHHOLD UNDER 10 CFR 2.390 Serial No.18-225 FSAR Updates Page 6 of 7 File Size File Name File Description (Bytes) 014 MPS U3 FSAR Chapter 14.pdf Chapter 14 (all content) 2,351,204 015 MPS U3 FSAR Chapter 15.pdf Chapter 15 (all content) 285,191 016 MPS U3 FSAR Chapter 16.pdf Chapter 16 (all content) 60,405 017 MPS U3 FSAR Chapter 17.pdf Chapter 17 (all content) 65,183 018 MPS U3 FSAR Chapter 18.pdf Chapter 18 (all content) 72,125 019 MPS U3 FSAR Chapter 19.pdf Chapter 19 (all content) 509,249 MPS3 Fire Protection Evaluation Report 020 MPS U3 FSAR FPER_R.pdf 1,220,713 (FPER) 021 MPS 3 DWGS IBR.pdf MPS3 Drawings (incorporated by reference) 72,822,677 MPS3 Technical Requirements Manual 022 Millstone TRM (IBR).pdf 4,470,901 (TRM) (incorporated by reference)

If you have any questions or require additional information, please contact Mr. Jeffry A. Langan, (860) 444-5544.

Sin?>;hV~

John R. Daugherty Site Vice President - Millstone STATE OF CONNECTICUT COUNTY OF NEW LONDON The foregoing document was acknowledged before me, in and for the County and State aforesaid, today by John R. Daugherty, who is Site Vice President - Millstone of Dominion Energy Nuclear Connecticut, Inc. He has affirmed before me that he is duly authorized to execute and file the foregoing document in behalf of that company, and that the statements in the document are true to the best of his knowledge and belief.

Acknowledged before me this \B*tl-._ day of JYt:\£. .

, 2018. WM.-E: BROWN NOTARV:.PUBUC *..

Y COMMISSION UPIRI;,~ MAR; 31, 20:a -

My Commission Expires:

ENCLOSURES 1 & 3 TO THIS LETTER CONTAIN SECURITY-RELATED INFORMATION WHICH IS TO BE WITHHELD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390.

UPON REMOVAL OF ENCLOSURES 1 & 3, THIS LETTER IS DECONTROLLED.

SECURITY-RELATED INFORMATION - WITHHOLD UNDER 10 CFR 2.390 Serial No.18-225 FSAR Updates Page 7 of 7

Enclosures:

4 Commitments made in this letter: None.

cc: (w/ enclosures)

U.S. Nuclear Regulatory Commission Region I 2100 Renaissance Blvd, Suite 100 King of Prussia, PA 19406-2713 NRC Senior Resident Inspector Millstone Power Station cc: (w/o enclosures)

T. H. Carter NRC Project Manager Millstone Unit 1 U.S. Nuclear Regulatory Commission Two White Flint North, Mail Stop T-8 F8 11545 Rockville Pike Rockville, MD 20852-2738 L. A. Kauffman Health Physicist-DNMS U.S. Nuclear Regulatory Commission Region I 2100 Renaissance Blvd, Suite 100 King of Prussia, PA 19406-2713 R. V. Guzman NRC Senior Project Manager Millstone Units 2 and 3 U.S. Nuclear Regulatory Commission One White Flint North, Mail Stop 08 C2 11555 Rockville Pike Rockville, MD 20852-2738 ENCLOSURES 1 & 3 TO THIS LETTER CONTAIN SECURITY-RELATED INFORMATION WHICH IS TO BE WITHHELD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390.

UPON REMOVAL OF ENCLOSURES 1 & 3, THIS LETTER IS DECONTROLLED.