Notification of Evaluations of Changes, Tests, and Experiments Inspection (05000458/2018003) and Request for Information
ML18197A431
Person / Time
Site: River Bend Entergy icon.png
Issue date: 07/18/2018
From: Thomas Farnholtz
Region 4 Engineering Branch 1
To: Maguire W
Entergy Operations
References
IR 2018003
Download: ML18197A431 (5)


See also: IR 05000458/2018003

Text

July 18, 2018

Mr. William F. Maguire, Site Vice President

Entergy Operations, Inc.

River Bend Station

5485 US Highway 61N

St. Francisville, LA 70775

SUBJECT:

RIVER BEND STATION - NOTIFICATION OF EVALUATIONS OF CHANGES,

TESTS, AND EXPERIMENTS INSPECTION (05000458/2018003) AND

REQUEST FOR INFORMATION

Dear Mr. Maguire:

The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission (NRC)

staff will conduct the baseline inspection of changes, tests, and experiments at your River Bend

Station from September 10 through September 14, 2018. The inspection will consist of three

reactor inspectors from the NRCs Region IV office for one week. The inspection will be

conducted in accordance with NRC Inspection Procedure 71111.17T, Evaluations of Changes,

Tests, and Experiments.

Experience has shown that this inspection is resource intensive for both the NRC inspectors

and your staff. In order to minimize the impact to your on-site resources and to ensure a

productive inspection, we have enclosed a request for documents needed for this inspection.

Please note that the documents are requested to be provided by August 27, 2018. Upon review

of these documents, the inspectors will select additional documentation for review upon arrival.

It is important that all of these documents are up-to-date and complete in order to minimize the

number of additional documents requested during the preparation and/or the on-site portions of

the inspection.

We have discussed the schedule for these inspection activities with your staff and understand

that our regulatory contact for this inspection will be Ms. Bridget Johns of your licensing

organization. If there are any questions about this inspection or the material requested, please

contact the lead inspector, Ronald Kopriva, by telephone at 817-200-1104 or by e-mail at

Ron.Kopriva@nrc.gov.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, control number 3150-

0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a

request for information or an information collection requirement unless the requesting document

displays a currently valid Office of Management and Budget control number.

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

1600 EAST LAMAR BOULEVARD

ARLINGTON, TEXAS 76011-4511

W. Maguire

2

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice and Procedure, a copy of

this letter and its enclosure will be available electronically for public inspection in the NRC Public

Document Room or from the Publicly Available Records (PARS) component of NRC's document

system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Thomas R. Farnholtz, Chief

Engineering Branch 1

Division of Reactor Safety

Docket No. 50-458

License No. NPF-47

Enclosure:

Evaluations of Changes, Tests, and

Experiments Inspection Request for

Information

ML18197A431

SUNSI Review

ADAMS:

Non-Publicly Available

Non-Sensitive

Keyword:

By: TFarnholtz

Yes No

Publicly Available

Sensitive

NRC-002

OFFICE

RI:EB1

C:PBD

C:EB1

NAME

RKopriva

JKozal

TFarnholtz

SIGNATURE

/RA by

Email/

/RA/

/RA/

DATE

07/18/18

07/17/18

07/18/18

Enclosure

Request for Information

Evaluations of Changes, Tests, and Experiments Inspection

River Bend Station

Inspection Report: 05000458/2018003

Inspection Dates:

September 10-14, 2018

Inspection Procedure:

IP 71111.17T, Evaluations of Changes, Tests, and Experiments

Lead Inspector:

Ronald A. Kopriva, Senior Reactor Inspector

Information Requested for the In-Office Preparation Week

The following information should be sent to the Region IV office in hard copy or electronic

format (preferred) by August 27, 2018, to the attention of Ron Kopriva. We request that you

categorize the documents in your response with the numbered list below. If only hard copies of

the requested documents are available or if the electronic format is too large, please inform the

lead inspector and provide the documents on the first day of the on-site inspection. Also, the

inspectors will select specific items from the information requested below and request from your

staff additional documents needed during the on-site inspection weeks. We ask that the specific

items requested be available and ready for review on the first day of inspection. If you have any

questions regarding this information request, please contact the lead inspector as soon as

possible.

1. Procedure(s) for conducting 10 CFR 50.59 screenings and evaluations.

2. A list with descriptions of all 10 CFR 50.59 screenings (or equivalent) of fully

implemented changes, tests, and experiments performed since the last triennial

modification inspection that did not result in an evaluation.

3. A list with descriptions of all 10 CFR 50.59 evaluations of fully implemented changes,

tests, and experiments performed since the last triennial 10 CFR 50.59 inspection that

did not result in an application for a license amendment.

4. A list with descriptions of all temporary plant modifications implemented since the last

triennial 10 CFR 50.59 inspection.

5. A list with descriptions of all compensatory actions for degraded or non-conforming

conditions implemented since the last triennial 10 CFR 50.59 inspection.

6. A list with descriptions of all corrective action documents related to 10 CFR 50.59

screenings and evaluations since the last triennial 10 CFR 50.59 inspection.

7. A list of personnel qualified to prepare 10 CFR 50.59 screenings and/or evaluations,

including qualification dates.

8. A list of personnel qualified to review and approve 10 CFR 50.59 screenings and/or

evaluations, including qualification dates.

9. Current revisions of the Technical Specifications and Bases and the Updated Final

Safety Analysis Report.

2

10. A copy of the most recent audits/self-assessments performed of the 10 CFR 50.59

programs.

11. A copy of the most recent submittal of the report containing a brief description of any

changes, tests, and experiments, including a summary of the evaluation of each,

required by 10 CFR 50.59(d)(2).

12. A list of systems and system designators and a set of one-line (i.e., simplified) system

diagrams.

Note: Descriptions should be brief but of sufficient detail to ensure that inspectors can

determine the safety and/or risk significance of the screenings, evaluations, and modifications.

Inspector Contact Information:

Ron Kopriva

Senior Reactor Inspector

817-200-1104

Ron.Kopriva@nrc.gov

Chad Stott

Reactor Inspector

817-200-1526

Chad.Stott@nrc.gov

Shiattin Makor

Reactor Inspector

817-200-1507

Shiattin.Makor@nrc.gov

Mailing Address:

U.S. NRC, Region IV

Attn: Ron Kopriva

1600 East Lamar Blvd.