MONTHYEARML24290A1572024-10-16016 October 2024 NRR E-mail Capture - for Your Action - RAI - Farley and Vogtle 1 and 2 - Alternative Request for Pressurizer Welds (L-2024-LLR-0047) ML24290A1552024-10-16016 October 2024 NRR E-mail Capture - for Your Action - RAI - Farley, Hatch, and Vogtle 1 and 2 - Proposed Alternative Request for Code Case N-572 ML24289A2002024-10-15015 October 2024 NRR E-mail Capture - for Your Action - RAI - Proposed License Amendment Request (LAR) for Vogtle Electric Generating Plant, Units 3 and 4 TS 3.7.6 Action E and SR 3.7.6.5 (L-2024-LLA-0083) ML24261B9282024-09-17017 September 2024 NRR E-mail Capture - for Your Action Discussion Points - Steam Generator Tube Inspection Call with SNC Regarding Vogtle, Unit 3 ML24250A1132024-09-0303 September 2024 Inspection Report 2024004 Radiation Safety Baseline Inspection Information Request ML24247A0092024-09-0303 September 2024 NRR E-mail Capture - Fyi - Revised Estimated Completion Date - Vogtle 3 and 4 - UFSAR Scheduler Exemption Request ML24250A1922024-08-29029 August 2024 Amendment Nos. 223/206 (1) - Email ML24232A0052024-08-16016 August 2024 NRR E-mail Capture - Acceptance Review - LAR and Exemption Request to Remove Tier 1 and Tier 2 Requirements for Vogtle 3 and 4 ML24253A0722024-08-15015 August 2024 Perspectives on Proposed Removal of Tier 1 and Tier 2 Requirements ML24225A0062024-08-0909 August 2024 NRR E-mail Capture - Acceptance Review - Vogtle 3 and 4 - LAR Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves), Action a and SR 3.7.6.6 (L-2024-LLA-0101) ML24206A0252024-07-20020 July 2024 NRR E-mail Capture - for Your Comments - State of Georgia - Vogtle Unit 1 - Emergency License Amendment Request for Technical Specification 3.7.9 ML24199A1592024-07-17017 July 2024 NRR E-mail Capture - Request for Additional Information - Vogtle 3 and 4 - Exemption for the Requirements in 10 CFR 50.71 Pertaining to the Submittal of Updated Final Safety Analysis Report ML24198A1672024-07-16016 July 2024 NRR E-mail Capture - Acceptance Review Vogtle 3 and 4 - License Amendment Request Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Surveillance Requirement L-2024-LLA-0083 ML24197A1572024-07-15015 July 2024 NRR E-mail Capture - Acceptance Review - Farley and Vogtle 1 and 2, LAR - TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown ML24197A0172024-07-12012 July 2024 NRR E-mail Capture - Fyi - Acceptance Review - Farley and Vogtle 1 and 2 - Alternative Request for Pressurizer Welds ML24194A0032024-07-11011 July 2024 NRR E-mail Capture - Fyi - Acceptance Review - Farley, Hatch, and Vogtle 1 and 2 - Alternative Request for Code Case N-572 ML24180A0012024-06-26026 June 2024 NRR E-mail Capture - Acceptance Review Farley 1 and 2 and Vogtle 1 and 2 - Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) (L-2024-LLR-0041) ML24170A9362024-06-18018 June 2024 NRR E-mail Capture - Fyi - Change to Estimated Completion Date for the SNC Fleet Physical Barrier Exemptions (L-2023-LLE-0018 and L-2023-LLE-0021) ML24178A3422024-05-16016 May 2024 NRR E-mail Capture - Request for Call - Proposed Vogtle 3 & 4 Tier 1 and Tier 2 Exemptions and LAR ML24120A0262024-04-29029 April 2024 COL Docs - FW Vogtle Electric Generating Plant, Unit 4 - Project Manager Reassignment ML24120A0462024-04-29029 April 2024 COL Docs - Re Fyi - SNC Notification Received of Vogtle Unit 4 - Completion of Power Ascension Tests ML24119A0012024-04-28028 April 2024 COL Docs - Fyi - SNC Notification Received of Vogtle Unit 4 - Completion of Power Ascension Tests ML24108A0132024-04-16016 April 2024 NRR E-mail Capture - (External_Sender) Responses from Wednesday 4/10/2024 Call with Southern Nuclear Operating Co. Vogtle 3&4 Licensing Actions ML24107A9322024-04-15015 April 2024 Document Request for Vogtle Electric Generating Plant Units 1 & 2 - Radiation Protection Inspection Report 2024-02 ML24107A7292024-04-15015 April 2024 Request for Vogtle Electric Generating Plant Units 1 & 2 - Radiation Protection Inspection - Inspection Report 2024-02 ML24106A0522024-04-12012 April 2024 NRR E-mail Capture - Acceptance Review - Vogtle 1 and 2 - Emergency Diesel Generator (EDG) Voltage and Frequency License Amendment Request (LAR) (L-2024-LLA-0031) ML24100A7842024-04-0909 April 2024 NRR E-mail Capture - for Your Action - Request for Additional Information (RAI) - Vogtle, Units 3 and 4 - Alternative Request for Explosively Actuated Valves (L-2023-LLR-0016) ML24099A0372024-04-0505 April 2024 NRR E-mail Capture - Acceptance Review - Vogtle Unit 3, License Amendment Request (LAR) Technical Specification (TS) 5.5.13, Ventilation Filter Testing Program (VFTP) - L-2024-LLA-0043 ML24095A2412024-04-0404 April 2024 NRR E-mail Capture - Acceptance Review for the Exemption Request Regarding the Final Safety Analysis Report Update Schedule at Vogtle, Units 3 and 4 ML24072A3982024-03-12012 March 2024 NRR E-mail Capture - for Your Action - Second Round Request for Additional Information (RAI) - Vogtle, Unit 1 - SG Tube Inspection Report - 1R24 (L-2023-LRO-0067) ML24061A2372024-03-0101 March 2024 SNC Email Dated March 1, 2024, Regarding SNC Response to NRC Letter for Vogtle 3 & 4 RES Info ML24057A0872024-02-23023 February 2024 NRR E-mail Capture - Acceptance Review - Alternative Request for Explosively Actuated Valves at Vogtle, Units 3 and 4 ML24046A1352024-02-15015 February 2024 COL Docs - Fyi - SNC Notification Received of Vogtle Unit 4 - Completion of Initial Criticality and Low-Power Testing ML24039A0882024-02-0808 February 2024 COL Docs - Fyi - SNC Notification Received of Vogtle Unit 4 Completion of Pre-Critical Tests ML24039A1122024-02-0808 February 2024 COL Docs - Re Fyi - SNC Notification Received of Vogtle Unit 4 Completion of Pre-Critical Tests ML24039A1922024-02-0808 February 2024 COL Docs - Correction - Re Fyi - SNC Notification Received of Vogtle Unit 4 Completion of Pre-Critical Tests ML24031A0502024-01-31031 January 2024 COL Docs - FW Erroneous Description of Tier 2 Change Process in Construction Lessons-Learned Report ML24017A1122024-01-17017 January 2024 NRR E-mail Capture - Request for Access to Cyber Security Data - Vogtle, Units 3 and 4 ML23360A0042023-12-23023 December 2023 NRR E-mail Capture - Fyi - Office of Nuclear Regulatory Research (RES) Requests for Vogtle 3 & 4 ML23348A0782023-12-13013 December 2023 NRR E-mail Capture - Voluntary Request for Closed Meeting Regarding Cyber Security Assessments at Vogtle, Units 3 and 4 ML23342A0802023-12-0808 December 2023 NRR E-mail Capture - Request for Additional Information (RAI) - Vogtle, Unit 1 - Review of SG Tube Inspection Report for Refueling Outage 24 (L-2023-LRO-0067) ML23331A9992023-11-27027 November 2023 COL Docs - Re Re Re ML23079A125 - Vogtle Electric Generating Station, Unit 3, NRC Response Letter to P. Durand, Regarding Comment on Federal Register Notice License Amendment No. 189 ML23331A9492023-11-26026 November 2023 Email Dated November 26, 2023, from Bo Pham to SNC and NRC - Vogtle Seismic Hazard Report ML23331A9622023-11-22022 November 2023 Email Dated November 22, 2023, from SNC to NRC - Vogtle Seismic Hazard Report ML23326A2802023-11-22022 November 2023 COL Docs - Re Re ML23079A125 - Vogtle Electric Generating Station, Unit 3, NRC Response Letter to P. Durand, Regarding Comment on Federal Register Notice License Amendment No. 189 ML23320A0342023-11-16016 November 2023 COL Docs - Re Acceptance Review of Southern Nuclear Operating Company’S License Amendment Request to Remove Combined License Appendix C (EPID No. 2023-LLA-0123) ML23320A2372023-11-0808 November 2023 NRR E-mail Capture - (External_Sender) Proposed LAR Regarding the Ultimate Heat Sink at Vogtle, Units 1 and 2 ML23312A2632023-11-0808 November 2023 COL Docs - Action Request for State of Georgia Comment by 5pm Monday, November 13, 2023 - Vogtle Units 3&4, LAR-22-002, TS 3.8.3, Inverters - Operating Completion Time Extension ML23311A1512023-11-0707 November 2023 COL Docs - Re Acceptance Review of Southern Nuclear Operating Company’S License Amendment Request to Remove Combined License Appendix C (EPID No. 2023-LLA-0123) ML23304A2272023-10-31031 October 2023 NRR E-mail Capture - Request for State of Georgia Comment by 5pm Monday, Nov. 6, 2023 - License Amendment Request for Vogtle Unit 4 - to Remove Combined License Appendix C 2024-09-03
[Table view] |
Text
Vogtle PEmails From: Hoellman, Jordan Sent: Thursday, July 12, 2018 3:32 PM To: Vogtle PEmails
Subject:
Draft Request for Alternative (ALT-10) for Pre-submittal Meeting Attachments: ND-17-1859 Enclosure ALT-10 Presubmittal.pdf Please see the attached draft Request for Alternative (ALT-10) for discussion at the 7/19/18 public meeting. The draft ALT-10 does not contain SUNSI.
1
Hearing Identifier: Vogtle_COL_Docs_Public Email Number: 321 Mail Envelope Properties (SN6PR09MB2608B60B39D68A31DC089F3BD5590)
Subject:
Draft Request for Alternative (ALT-10) for Pre-submittal Meeting Sent Date: 7/12/2018 3:32:25 PM Received Date: 7/12/2018 3:32:28 PM From: Hoellman, Jordan Created By: Jordan.Hoellman2@nrc.gov Recipients:
"Vogtle PEmails" <Vogtle.PEmails@nrc.gov>
Tracking Status: None Post Office: SN6PR09MB2608.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 167 7/12/2018 3:32:28 PM ND-17-1859 Enclosure ALT-10 Presubmittal.pdf 140398 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received:
ND-17-1859 Enclosure Proposed Alternative VEGP 3&4-PSI/ISI-ALT-10 in Accordance with 10 CFR 50.55a(z)(1) -
Alternative Requirements for Preservice Examination Volumetric Surface Configuration Requirements Plant Site-Unit: Vogtle Electric Generating Plant (VEGP) - Units 3 and 4 Interval-Interval Applies to construction and preservice inspection intervals.
Dates:
Requested Date Approval is requested by 1/13/19 to support performance of preservice for Approval: inspection activities prior to the Class 1 hydrostatic test.
ASME Code Components ASME Class 1 Piping and Components Affected:
Applicable Code Edition and ASME B&PV Code,Section III, 1998 Edition through the 2000 Addenda (code of record).
Addenda:
ASME Section III NB-4424.2 (a) requires that the surface finish shall be 6.3 Ra or better for a distance of at least 2t (where t equals nominal wall thickness) plus 4 in. or 6 in., whichever is greater (Fig. NB-4250-2 or Applicable Code Fig. NB-4250-3), from the edge of the weld crown on at least one side Requirements: of the weld where an ultrasonic examination is required.
As noted in Fig. NB-4250-2 and NB-4250-3, this distance is required to be free of interferences.
The requirements for surface finish, surface finish distance, and Reason for distance for which any hanger or attachment (or any other interference)
Request: can be made, is required to be 2t (where t equals nominal wall thickness) plus 4 inches, or 6 inches, whichever is greater as described in ASME Section III NB-4424.2(a) and shown in ASME Section III NB-4250-2 for ultrasonic examinations.
1
ND-17-1859 Enclosure Proposed Alternative VEGP 3&4-PSI/ISI-ALT-10 in Accordance with 10 CFR 50.55a(z)(1) -
Alternative Requirements for Preservice Examination Volumetric Surface Configuration Requirements The purpose of this distance requirement is to assure the examination area is adequate to perform a volumetric examination from the outside diameter (OD) for component-to-pipe and pipe-to-pipe welds.
Other examination configurations exist that would allow an adequate examination in accordance with ASME Section XI. One specific example is instrumentation bosses near the AP1000 Steam Generator Hot Leg Safe End-to-Pipe welds are within the distance required in ASME Section III NB-4424.2 (Shown in Figure NB-4250-2).
Proposed Alternative:
For configurations that do not meet those described in NB-4424.2(a) and shown in Figure NB-4250-2 and Figure NB-4250-3:
(a) The requirements of Figure NB-4250-1 shall be met.
(b) The Owners Design Specification shall describe the configuration and surface finish required for preservice inspection in lieu of the configuration shown in Figure NB-4250-2 or Figure NB-4250-3 and surface finish described in NB-4424.2(a).
(c) The Certificate Holder (with agreement of the Owner or Owner Designee) shall verify and document that the required preservice inspection can be performed with the proposed configuration and surface finish.
Proposed (d) Use of this alternative shall be documented in the appropriate Data Alternative and Report Form.
Basis for Use:
Basis for Use:
For volumetric examination surface configurations that do not meet NB-4424.2(a), which reference Fig. NB-4250-2 and NB-4250-3, an inspectability evaluation is performed and documented to ensure that essentially 100% of the ASME Section XI volumetric examination coverage is obtained. If essentially 100% volumetric examination coverage is not obtained, this alternative shall not apply.
The proposed alternative ensures that essentially 100% of the ASME Section XI preservice inspection volume is obtained and future inservice inspection coverage requirements will be met; therefore, this proposed alternative provides an acceptable level of quality and safety in accordance with 10 CFR 50.55a(z)(1).
Duration of Proposed This alternative applies to the period preceding plant operations.
Alternative:
2
ND-17-1859 Enclosure Proposed Alternative VEGP 3&4-PSI/ISI-ALT-10 in Accordance with 10 CFR 50.55a(z)(1) -
Alternative Requirements for Preservice Examination Volumetric Surface Configuration Requirements
References:
None Status: Awaiting NRC authorization 3