ML18191A473
| ML18191A473 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 12/08/1977 |
| From: | Renberger D Washington Public Power Supply System |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| References | |
| G02-77-455 | |
| Download: ML18191A473 (3) | |
Text
NRC FORM 195 I2-76),~
U.S. NUCLEAR REGULATO~'OMMISSION NRC DISTRIBUTION FDR PART 50 DOCKET MATERIAL
'l DOCKET NUMBER FILE+MBE@
TO:
I Mr. Harold Denton FROM:
Washi Pubi Pwri Supply System Richland, Washington Di Li Renberger DATE OF DOCUMENT 12/08/77 DATE RECEIVED 12/13/77 BETTE R
~ORIGINAL 0 COPY DESCRIPTION 0 NOTOR I2E D RkfNCLASSIFIED PROP INPUT FORM ENCLOSURE NUMBER OF COPIES RECEIVED Responses to NRC Questions Dated Septi 6,
1977 in Review of the WNP-2 ER-OSL
-November 28, 1977-(1-P)
(1/2" )
PLANT'AME: WPP SS 12/13/77 RJL RANCH CHIEF:
PROJECT MANAGER:
LIC. ASST:
FOR ACTION/INFORMATION ENVIRONMENTAL ASSIGNED AD:
ORE LTR BRANCH CHIEF:
urC C >DR GOSSICK G STAFF 47VR
'fAGEMENT INTERNALD ENGINEERING FACTOR SAFETY ROSS NOVAK ROSZTOCZY CHECK B.
HARLESS ISTRIBUTION T SYSTEMS TO CTORS BAER B
TLF.R SITE SAFETY 8 ENVIRON ANALYSIS DENTON G MULLER NVIRON TECH ERNST BALLARD OD TECH IMILL 2
ALYSIS VOLLMER
- 5. I-8uJ L5 LTZMAN Sf'R IVS LPDR:
ice J4$
TIC BASIC REG V J.
HANCHETT) 16 CYS SENT CATEGOR i; NRC FORM 185 I2-76I EXTERNALDISTRIBUTION
'to ACRS CONTROL NUMBER vl<
773470056
I)
Washington Public Power Supply System
~~8PP A JOINT OPERATING AGENCY P. O. BOX 968 3000 GEO. WASHINGTON WAY RICHLAND, WASHINGTON 99352 PHONE(509) 946 ~ 1611 Docket No. 50-397 December 8, 1977 G02-77-455 Mr. Harold Denton, Director Division of Site Safety and Environmental Analysis U.
S. Nuclear Regulatory Commission Washington, D.C.
20555
Subject:
'b
) (
WPPSS NUCLEAR PROJECT NO.
2 ENVIRONMENTAL REPORT - OPERATING LICENSE STAG
RESPONSE
TO NRC UESTIONS
Reference:
1)
- Letter, W.
H. Regan, Jr.,
NRC, to D. L. Renberger,
- WPPSS, dated September 6, 1977.
Dear Mr. Denton:
Washington Public Power Supply System hereby submits forty-one (41) copies of our response to the NRC questions which were transmitted with the referenced letter.
Per verbal instructions from Mr. Regis Hoyle, Environment Project Manager for WNP-2, distribution is being made concurrently according to the ER-OSL distribution list provided by the NRC. It is our intention to incorporate, as appropriate, this information in subsequent amendments to the Environmental Report.
Very truly yours, DLR:JPC:sic Enclosure D. L.
RENBERGER Assistant Director Generation and Technology 773470056
e t
s
.-.( ll N Kl zg LL6'lNA QHIS,'".-,
~
lt(3HA300 03hla038