Washington Public Power Supply System Projected Submittals to the Nuclear Regulatory Commission for All Projects
ML18191A294
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 03/27/1975
From: Stein J
Washington Public Power Supply System
To: Anthony Giambusso
Office of Nuclear Reactor Regulation
References
AP0-75-10
Download: ML18191A294 (3)


Text

NRC P'.PT IBU lON FOR PART Fi0 DOCKET MATERIAL (TEMPORARY FORM) 0<<0 0:

FILE.

INFO FUTURE APPLICA'7, F ROM: Washing ton Public Pwr. Sup gighlyydi Wash.

'ys 1PATE OF DOC 3-27-75 DATE REC'D 3-31-75 LTR T(VX R PT XX OTHER TO'L'ASS A. Giambusso UNC LASS XXX PROP INFO ORIG 1 Signed INPUT CC OTHER NO CYS REC'D SENT AEC PDR SENT LOCAL PDR 50-397 PROJECT 8:

DESCRIPTION:

Ltr. Re oor 1tr. of 3-10-75, advising:

1-Oprt. Lic. Appl. for WPPSS Nuclear Proj.2 in Dec. 1975...

2-Topical Quality Assur.

RPT 5-1-76 for design

& Cons true tion...

( All Projts. )

3-Possible Applic. for Projs.

6&7,March to Ju 1976;.;

$-p~3@g Applies.for possible WppSS pros.

6

", on 5>>1-77'.

ENCLOSURES:

c7 FOR ACTION/INFORMATION V

N.

DUBE W/2 CYS FOR ACTION SUBJE

~E.

CASE

~~ R.

BOYD

~A BRAITMAN

~ H.

DENTON

~~ REG OPERATIONS (J.

DAVIS)

~~ GOSSICK & STAFF

~~D.

MULLER r

M. GROFF

~ S.

SMILEY W.

HAASS

~ Butler

~ Maigret

g n

0 0

~ 0 D

s a r

0

~

S 0 0

Washington Public Power Supply System A JOINT OPERATING AGENCY P. 0. BOX 968 3000 GEO. WASHINGTON WAY RICHLAND. WASHINGTON 09352 PHONS (509) 946 9681 March 27, 1975 AP0-7 5-1 0 Mr. A. Giambusso, Director Division of Reactor Licensing Office of Nuclear Reactor Regulation U.

S. Nuclear Regulatory Commission Washington, DC 20555

Subject:

WASHINGTON PUBLIC POWER SUPPLY SYSTEM PROJECTED SUBMITTALS TO THE NUCLEAR REGULATORY COMMISSION FOR ALL PROJECTS

<< ~

~ <<I<<<<<<2,

Reference:

NRC Letter of 3/10/75 to J.J.

Stein.

Dear Mr. Giambusso:

This letter is in response to the reference letter which requested our current plans for application submittals between now and the beginning of fiscal year 1978.

At the present time we are planning the following submi tta 1 s:

l.

An operating license application for WPPSS Nuclear Project No.

2 in December 1975.

(Docket 50-397) 2.

A topical Quality Assurance Report covering the WPPSS Quality Assurance Program for design and construction on May 1, 1976.

(All Projects) 3.

A possible application for "limited early site review" for WPPSS Projects No.

6 8

7 in the period March to July, 1976, in the event these are chosen as nuclear projects.

4.

The completed application for the possible WPPSS Projects Nos.

6 8

7 on May 1, 1977.

Item 3 above would contain a Site Safety Analysis Report and a Site Environmental Report without plant specific data.

We will keep you informed if any changes occur in the above plans.

Very truly yours, JJS:DLR:ho J.', J.

EIN Managing Director