ML18191A207

From kanterella
Jump to navigation Jump to search
Acknowledges GI2-78-108, Dated 03/06/1978 Which Requested Response to Matters Adressed in NUREG-0313 and Guarantees Response within Ninety Days of This Letter
ML18191A207
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 03/27/1978
From: Renberger D
Washington Public Power Supply System
To: Varga S
Office of Nuclear Reactor Regulation
References
G02-78-106
Download: ML18191A207 (6)


Text

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS>

DISTRIBUTION FOR INCOMING MATERIAL 50-35'7 ORG:

RENBERGER D L DOCDATE: 03/27/78 WA PUB PWR SUPPLY SYS DATE RCVD: 03/31/78 REC:

VARGA S A

NRC DOCTYPE:

LETTER NOTARIZED:

NO COPIES RECEIVED

SUBJECT:

LTR 1

ENCL 0

RESPONSE

TO NRC LTR DTD 03/06/78... FURNISHING INFO RE SCHEDULE FOR

RESPONSE

TO MATTERS ADDRESSED IN NUREG-0313'TECHNICAL REPT ON MATERIAL SELECTION AND PROCESSING GUIDELINES FOR BWR COOLANT PRESSURE BOUNDARY PIPING. ".

PLANT NAME: WPPSS UNIT 2 DISTRIBUTION OF THIS MATERIAL IS AUSTENITIC STAINLESS STEEL IN BWR

<DISTRIBUTION CODE B012)

REVIEWER INITIAL:

XJM DISTRIBUTOR INITIAL:PQ AS FOLLOWS f

FOR ACTION:

ASST DIR VASS Lg4+LTR ONLY< 1 )

BR CHIEF VARGA44LTR ONLY< 1)

LIC

- ERVICF ONLY(1 )

INTERNAL:

EXTERNAL:

REG FILE++LTR ONLY(

)

BOYD+4LTR ONLY(i)

F WILLIAMS+wLTRONLY< 1)

MATTSON++LTR ONLY(1>

PAWLICKI+~LTR ONLY< 1)

L CRQCKER++LTR ONLY(i)

LPDR S RICHLAND> WA++LTR ONLY< 1 )

TIC++LTR ONLY(1 >

NSIC++LTR ONLY<1)

ACRS CAT B++LTR ONLY(16)

NRC PDR++LTR ONLY(1>

OELD44LTR ONLY<i')

DEYQUNG++LTR QNLY(1>

H SMITH44LTR ONLY(i)

J KNIGHT+~LTR ONLY(1)

H CONRAD+4LTR ONLY< 1)

K GOLLER>+LTR ONLY(i)

DISTRIBUTION:

LTR 37 ENCL 0 SI ZE:

2P CONTROL NBR:

780930018gA-THE END

'I '

E K'l K'

I I

I I

I E

N N

~,

I I

N I

~

I Ul I

I I

E I

I I

I

~ IN I'N F II I

I

'E I

IK I E I 4

~ 0 Washington'Public Power Supply System O~sygBU ioN A JOINT OPERATING AGENCY SEBV'C S'N~T Mr. S. A. Varga, Chief Light Water Reactors Branch No.

4 Division of Project Management U.

S. Nuclear Regulatory Commission Washington, D.

C.

20555 4<@(~,

f/yep

Subject:

WPPSS NUCLEAR PROJECT NO.

2 USE OF AUSTENTITIC STAINLESS STEEL DOCKET NO. 50-397 0

P. O. BOX 966 3000 GSO. WASR(((OTON WAV R(CH(.ANO, W~&1(hbfUN 59352 PHONS(509) 946.1611 G02-78-106 March 27, 1978 Us %C

'OtS-,B:!:,01 ION SERVICES 3A,AHCH

Reference:

GI2-78-108, dated March 6, 1978, SA Varga to NO Strand, same subject

Dear Mr. Varga:

The referenced letter requested a schedule for a response to the matters addressed in NUREG-0313, "Technical Report on Material Selec-tion and Processing Guidelines for BWR Coolant Pressure Boundary Piping."

Accordingly, we will provide a response within ninety days of the date of this letter.

The response may be expected to address the following areas:

1)

Degree of conformance and the extent of practical applicability of the reactor coolant pressure boundary piping at WHP-2 to the guidelines stated in Section II of NUREG-0313.

2)

Augmentation of Inservice Inspection Requirements for compliance with Section III of NUREG-0313.

3}

The capabilyties of the reactor coolant leakage detection'ystem with respect to Section III.2.A(2) of'NUREG-0313.

SOPSO018

i N J ll I

4 ~

4

'SA Varga Page 2

G02-78-106 March 27, 1978 If you require any further clarifying information concerning our intended-action, Please contact the WNP-2 Project's assigned Licensing

Engineer, Mr. 0.

Keener Earle, at 509-377-2501, ext.

2310.

Very truly yours, DLR:OKE:cph cc:

J0 Verderber, B8R JJ Byrnes, B8R RC Root, B8R Site HR Canter,,

B8R D. Roe, BPA

'D. L.

RENBERGER Assistant Director Generation 8 Technology

v~

l

~ gW V

~

~

I P