ML18191A207
| ML18191A207 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 03/27/1978 |
| From: | Renberger D Washington Public Power Supply System |
| To: | Varga S Office of Nuclear Reactor Regulation |
| References | |
| G02-78-106 | |
| Download: ML18191A207 (6) | |
Text
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS>
DISTRIBUTION FOR INCOMING MATERIAL 50-35'7 ORG:
RENBERGER D L DOCDATE: 03/27/78 WA PUB PWR SUPPLY SYS DATE RCVD: 03/31/78 REC:
VARGA S A
NRC DOCTYPE:
LETTER NOTARIZED:
NO COPIES RECEIVED
SUBJECT:
LTR 1
ENCL 0
RESPONSE
TO NRC LTR DTD 03/06/78... FURNISHING INFO RE SCHEDULE FOR
RESPONSE
TO MATTERS ADDRESSED IN NUREG-0313'TECHNICAL REPT ON MATERIAL SELECTION AND PROCESSING GUIDELINES FOR BWR COOLANT PRESSURE BOUNDARY PIPING. ".
PLANT NAME: WPPSS UNIT 2 DISTRIBUTION OF THIS MATERIAL IS AUSTENITIC STAINLESS STEEL IN BWR
<DISTRIBUTION CODE B012)
REVIEWER INITIAL:
XJM DISTRIBUTOR INITIAL:PQ AS FOLLOWS f
FOR ACTION:
ASST DIR VASS Lg4+LTR ONLY< 1 )
BR CHIEF VARGA44LTR ONLY< 1)
LIC
- ERVICF ONLY(1 )
INTERNAL:
EXTERNAL:
REG FILE++LTR ONLY(
)
BOYD+4LTR ONLY(i)
F WILLIAMS+wLTRONLY< 1)
MATTSON++LTR ONLY(1>
PAWLICKI+~LTR ONLY< 1)
L CRQCKER++LTR ONLY(i)
LPDR S RICHLAND> WA++LTR ONLY< 1 )
TIC++LTR ONLY(1 >
NSIC++LTR ONLY<1)
ACRS CAT B++LTR ONLY(16)
NRC PDR++LTR ONLY(1>
OELD44LTR ONLY<i')
DEYQUNG++LTR QNLY(1>
H SMITH44LTR ONLY(i)
J KNIGHT+~LTR ONLY(1)
H CONRAD+4LTR ONLY< 1)
K GOLLER>+LTR ONLY(i)
DISTRIBUTION:
2P CONTROL NBR:
780930018gA-THE END
'I '
E K'l K'
I I
I I
I E
N N
~,
I I
N I
~
I Ul I
I I
E I
I I
I
~ IN I'N F II I
I
'E I
IK I E I 4
~ 0 Washington'Public Power Supply System O~sygBU ioN A JOINT OPERATING AGENCY SEBV'C S'N~T Mr. S. A. Varga, Chief Light Water Reactors Branch No.
4 Division of Project Management U.
S. Nuclear Regulatory Commission Washington, D.
C.
20555 4<@(~,
f/yep
Subject:
WPPSS NUCLEAR PROJECT NO.
2 USE OF AUSTENTITIC STAINLESS STEEL DOCKET NO. 50-397 0
P. O. BOX 966 3000 GSO. WASR(((OTON WAV R(CH(.ANO, W~&1(hbfUN 59352 PHONS(509) 946.1611 G02-78-106 March 27, 1978 Us %C
'OtS-,B:!:,01 ION SERVICES 3A,AHCH
Reference:
GI2-78-108, dated March 6, 1978, SA Varga to NO Strand, same subject
Dear Mr. Varga:
The referenced letter requested a schedule for a response to the matters addressed in NUREG-0313, "Technical Report on Material Selec-tion and Processing Guidelines for BWR Coolant Pressure Boundary Piping."
Accordingly, we will provide a response within ninety days of the date of this letter.
The response may be expected to address the following areas:
1)
Degree of conformance and the extent of practical applicability of the reactor coolant pressure boundary piping at WHP-2 to the guidelines stated in Section II of NUREG-0313.
2)
Augmentation of Inservice Inspection Requirements for compliance with Section III of NUREG-0313.
3}
The capabilyties of the reactor coolant leakage detection'ystem with respect to Section III.2.A(2) of'NUREG-0313.
SOPSO018
i N J ll I
4 ~
4
'SA Varga Page 2
G02-78-106 March 27, 1978 If you require any further clarifying information concerning our intended-action, Please contact the WNP-2 Project's assigned Licensing
- Engineer, Mr. 0.
Keener Earle, at 509-377-2501, ext.
2310.
Very truly yours, DLR:OKE:cph cc:
J0 Verderber, B8R JJ Byrnes, B8R RC Root, B8R Site HR Canter,,
B8R D. Roe, BPA
'D. L.
RENBERGER Assistant Director Generation 8 Technology
v~
l
~ gW V
~
~
I P