|
---|
Category:- No Document Type Applies
MONTHYEARML23166A1032023-06-15015 June 2023 6-15-23 Certified Index to the Record (9th Cir.)(Case No. 23-852) ML23061A1442023-03-0202 March 2023 Pre-Application Engagement on Material Qualification Issues for Advanced Reactor Licensing ML23006A0342023-01-0606 January 2023 Limited English Proficiency Services - Polish ML23006A0332023-01-0606 January 2023 Limited English Proficiency Services - Portuguese ML22332A4132022-11-28028 November 2022 NRC Staff Liaison Report: Status of NRC Activities of Potential Interest to Om Standards Committee (December 2022) ML22290A1072022-10-12012 October 2022 MAP-X Portal FAQ Revision 3 ML22062A0092022-05-13013 May 2022 OEDO-22-00085/86/87 - Enclosure 1 - NRR Staff Response to Taskings in EDO DPO Appeal Decision Concerning DPO-2020-004 ML22013A2932021-12-21021 December 2021 Trp 45 St. Lucie SLRA - Breakout Questions Masonry Walls ML22013A2772021-11-21021 November 2021 2.4 Structural Scoping and Screening Breakout Questions ML21322A2882021-11-16016 November 2021 Japan Lessons Learned Archived NRC Web Page ML21244A4272021-07-28028 July 2021 FAQ 21-03 R1 ANS Guidance Following IPAWS - Final Approved ML20166A0032020-06-23023 June 2020 NRC Staff Resolution of Radics LLC Comments on Supplemental Information Draft SE ML20135H1702020-05-14014 May 2020 Public Notice of Application for Amendment to Renewed Facility Operating License ML20041C9402020-02-10010 February 2020 1983 HPPOS-288 Acceptance of Radman Topical Report (WMG-102) ML20016A3252020-01-16016 January 2020 ROP E Questions and Answers_Revised - Dec 2019 ML20006F2172020-01-0606 January 2020 ROP Enhancement Questions and Answers - Dec 2019 ML20006F2192020-01-0606 January 2020 Significance Determination Process ML20006F2162020-01-0606 January 2020 Radiation Protection ML20006F2122020-01-0606 January 2020 Inspection Area ML20006F2082020-01-0606 January 2020 Cross Cutting Issues ML20006F2102020-01-0606 January 2020 Indepedent Spent Fuel Storage Installations ML20006F2182020-01-0606 January 2020 Security ML20006F2072020-01-0606 January 2020 Reactor Oversight Process Enhancement Assessment ML20006F2132020-01-0606 January 2020 Performance Indicators ML20006F2152020-01-0606 January 2020 Problem Identification and Resolution ML20006F2092020-01-0606 January 2020 Emergency Preparedness ML19297F9732019-10-24024 October 2019 Oct 24, 2019 TR Transformation Workshop Attendees ML19290G3542019-10-16016 October 2019 2019-10-17 List of Leaks and Spills ML19246A0242019-09-19019 September 2019 Attachment Resolution of Comments Final Safety Evaluation for Westinghouse Electric Company LTR-NRC-19-15, Notification of Changes to Westinghouse Qms ML19196A2402019-07-31031 July 2019 July 11, 2019 Webinar Attendees List ML19196A3022019-07-19019 July 2019 Disposition Table for NEI and EPRI Comments Draft Safety Evaluations for EPRI Depletion TRs 3002010613 and 3002010614 ML19198A3062019-07-17017 July 2019 Draft Interim Staff Guidance: Supplemental Guidance Regarding the Chromium-Coated Zirconium Alloy Fuel Cladding Accident Tolerant Fuel Concept (ATF-ISG-01) ML19218A1712019-06-27027 June 2019 List of Attendees for the June 27, 2019, Closed Meeting with Westinghouse Electric Company to Discuss Future Submittal of WCAP-18446-P, Incremental Extension of Burnup Limit for Westinghouse Fuel with Zirlo Cladding and Optimized Zirlo Clad ML19218A2222019-06-27027 June 2019 List of Attendees for the Summary of June 27, 2019, Closed Meeting with Westinghouse Electric Company to Discuss Future Submittal of WCAP-18443-P/Np, Qualification of the Two-Dimensional Transport Code Paragon2 ML19148A3352019-05-22022 May 2019 Attendee List 2019 Materials Program ML19099A2212019-04-0808 April 2019 Draft of TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML19101A0282019-02-28028 February 2019 Attendees List for Westinghouse Electric Company - USNRC Partially Closed Meeting to Discuss Proprietary Information Regarding Westinghouse Encore Accident Tolerant Fuel Technology ML19196A2742019-01-31031 January 2019 Attachment 1: Evaluation of Depletion Reactivity Decrement Bias and Uncertainty Values Using Linear Versus Quadratic Weighted Least Squares Regression Models ML19196A2752019-01-31031 January 2019 Attachment 2: Comments on Draft SER, Revision 2 ML19196A2762019-01-31031 January 2019 Attachment 3: Proposed Changes for EPRI Utilization Report & NEI 12-16, Revision 3 ML18256A3192018-10-0909 October 2018 September 2018 List of Leaks and Spills at U.S. Commercial Nuclear Power Plants ML18099A0462018-08-16016 August 2018 OMB Supporting Statement for the 2018 ASME Code Case Proposed Rule ML18214A6772018-07-11011 July 2018 Enclosure 2, Regulatory Issues Task Force Public Meeting ML18180A2602018-06-29029 June 2018 NFPA 805 FAQ 10-0059 - NFPA 805 Monitoring ML18180A2702018-06-27027 June 2018 NRC Staff Comments on Fpra FAQ 18-0014 - Time to Detection Is Zero for Manual Non-Suppression Probability Calculations - 06/27/2018 ML18180A3192018-06-27027 June 2018 Additional NRC Staff Comments on Fpra FAQ 18-0017 - Conditional Trip Probability for Modeling Operator Discretion - 06/27/2018 ML18180A2902018-06-27027 June 2018 NRC Staff Comments on Fpra FAQ 18-0015 - More Realistic Contained Fire Duration Limits - 06/27/2018 ML18073A3582018-03-15015 March 2018 NRC Staff Comments FAQ 18-0015 ML18025C0242018-03-0707 March 2018 NEI 12-13 Staff Comments ML18031A1192018-01-31031 January 2018 NRC Form 892 Fatigue 2023-06-15
[Table view]Some use of "" in your query was not closed by a matching "". |
Text
NRC Comments - 06/27/18 Fire PRA FAQ 18-0014 - Detection Time for Manual Non-suppression The staff does not agree that the detection time subtraction term can be removed from the equation for time available to determine manual suppression credit. Instead, the staff agrees that the detection time should be adjusted due to scenario specific conditions.
For instance, for areas where detection is not present or personnel occupancy level is low or nonexistent, the removal of detection time from the time available would not be appropriate or consistent with the bulk of the data that makes up the suppression curves and represents earlier success of suppression. After all, earlier success of suppression relies upon earlier detection.
NRC Research and EPRI are currently in the process of developing a methodology for classifying growth modeling and revising the application of manual non suppression. This methodology will take into account some of the necessary complications for adjusting the detection time in question such as the level of occupancy, detection capability, main control room component alarm conditions, etc. The adjustment of the detection time subtraction term is better suited for a larger working group than a FAQ in order to address the complications and potential misapplications from introducing these conditions bearing upon detection time, and thus, to make the necessary adjustments to the overall methodology that would be required.