NRR E-mail Capture - (External_Sender) NEI Slides for June 18, 2018 Public Mtg with Nuclear Energy Institute to Discuss Use of New Probabilistic Risk Assessment Methods Following Issuance of an Amendment to Utilize a Risk-Informed Process
ML18169A418
Person / Time
Issue date: 06/18/2018
From: Ed Miller
Special Projects and Process Branch
To: Ed Miller
Special Projects and Process Branch
References
Download: ML18169A418 (17)


Text

1 NRR-DMPSPEm Resource From:

ANDERSON, Victoria <vka@nei.org>

Sent:

Monday, June 18, 2018 11:11 AM To:

Miller, Ed

Subject:

[External_Sender] RE: NRC Slides for June 18, 2018 Public Meeting Attachments:

NEI Presentation for June 18 2018 public meeting.pptx These are ours for today. We will bring copies.

VICTORIA ANDERSON l TECHNICAL ADVISOR, RISK AND TECHNICAL SERVICES 1201 F Street, NW, Suite 1100 l Washington, DC 20004 P: 202.739.8101 M: 202.247.1669 vka@nei.org From: Miller, Ed [1]

Sent: Monday, June 18, 2018 11:03 AM To: ANDERSON, Victoria

Subject:

NRC Slides for June 18, 2018 Public Meeting Subject slides attached.

This electronic message transmission contains information from the Nuclear Energy Institute, Inc. The information is intended solely for the use of the addressee and its use by any other person is not authorized. If you are not the intended recipient, you have received this communication in error, and any review, use, disclosure, copying or distribution of the contents of this communication is strictly prohibited. If you have received this electronic transmission in error, please notify the sender immediately by telephone or by electronic mail and permanently delete the original message. IRS Circular 230 disclosure: To ensure compliance with requirements imposed by the IRS and other taxing authorities, we inform you that any tax advice contained in this communication (including any attachments) is not intended or written to be used, and cannot be used, for the purpose of (i) avoiding penalties that may be imposed on any taxpayer or (ii) promoting, marketing or recommending to another party any transaction or matter addressed herein.

Sent through www.intermedia.com

Hearing Identifier:

NRR_DMPS Email Number:

432 Mail Envelope Properties (70D3168DF0776E4EB59DBBD4353F76487502FD58)

Subject:

[External_Sender] RE: NRC Slides for June 18, 2018 Public Meeting Sent Date:

6/18/2018 11:11:11 AM Received Date:

6/18/2018 11:12:02 AM From:

ANDERSON, Victoria Created By:

vka@nei.org Recipients:

"Miller, Ed" <Ed.Miller@nrc.gov>

Tracking Status: None Post Office:

MBX023-E2-VA-1.EXCH023.DOMAIN.LOCAL Files Size Date & Time MESSAGE 1594 6/18/2018 11:12:02 AM NEI Presentation for June 18 2018 public meeting.pptx 1321948 Options Priority:

Standard Return Notification:

No Reply Requested:

No Sensitivity:

Normal Expiration Date:

Recipients Received:

1 June 18, 2018 NRC Public Meeting on PRA Methods and Risk-Informed Licensing Applications

OBJECTIVES Achieve common understanding of existing regulatory guidance regarding PRA Methods Evaluate relevant portions of NEI 06-09 and SE Discuss relevant NEI correspondence

- June 14, 2018 letter on NEI 16-04 and PRA methods

- April 2018 enhanced proposal on TSTF-505 PRA upgrade reporting

- Identify desired refinements Develop path forward supports continued NRC review of PRA information to ensure public health and safety while maximizing efficiency of licensing processes 2

BACKGROUND The TSTF-505 draft SE included the following paragraph (e):

The risk assessment approaches and methods shall be acceptable to the NRC. The plant PRA shall be based on the as-built, as-operated, and maintained plant; and reflect the operating experience at the plant, as specified in Regulatory Guide 1.200, Revision

2. Methods to assess the risk from extending the completion times must be PRA methods used to support this license amendment, or other methods approved by the NRC for generic use; and any change in the PRA methods to assess risk that are outside these approval boundaries require prior NRC approval.

The draft SE described "methods approved by the NRC for generic use" as follows:

The licensee has also established a periodic update and review process for the PRA and associated CRMP model. {NOTE: Verify there are no changes to the change control processes for PRA methods. If so, insert a discussion of the change control process that is in the license condition or TS Section 5 requirement. The addition to TS Section 5 paragraph (e) requires that RICTs be calculated using NRC accepted methods. The NRC documents acceptance of PRA methods in a number of different ways including plant specific SEs, topical reports, SEs, facts and observations (F&O) closures, FAQs, and through the proposed vetting panel process.}

Industry finds that this departs from established regulatory guidance and original intent of NEI 06-09 Alternative proposal developed to address staff concerns while maintaining consistency with established regulatory guidance 3

NEI PROPOSAL FOR TSTF-505

  • Licensees understand NRCs interest in continued understanding of PRA information following implementation of TSTF-505

- Can be achieved without requiring NRC approval of PRA methods and data

- Requirements for explicit approval would be unnecessarily burdensome and inefficient for NRC and licensees

  • Industry proposal involves new LARs, as appropriate, and periodic reporting requirements

- Latest version addresses NRC concerns as expressed in February 2018 correspondence 4

New Approach (e.g. new Seismic PRA)

New Approach (e.g. new Seismic PRA)

Submit LAR Submit LAR Changes to PRA as evaluated in original TSTF-505 LAR Changes to PRA as evaluated in original TSTF-505 LAR Upgrade Upgrade Perform Peer Review Perform Peer Review Update Update Maintenance process as evaluated in original TSTF-505 LAR Maintenance process as evaluated in original TSTF-505 LAR Report Changes to NRC Report Changes to NRC Use Model in RICT Program Use Model in RICT Program Overview of Proposal

NEI PROPOSAL FOR TSTF-505

  • Majority of NRC feedback focused on reporting requirement regarding PRA upgrades
  • Several enhancements made to address NRC comments

- Specified content of report

- Specified timeframe for NRC response to report (30 days)

- Specified NRC recipient for report 6

EXISTING REGULATORY GUIDANCE ON PRA METHODS PRAs are not required for operating plants licensed under 10 CFR 50, therefore, no regulatory requirements related to PRA methods

- Expectations outlined in regulatory guidance for voluntary licensing applications Regulatory guidance

- RG 1.174

- RG 1.200

- Program-specific guidance

RG 1.174

  • RG 1.200 is an important related guidance document that describes one acceptable approach for determining whether the base PRA, in total or the parts that are used to support an application, is acceptable for use in regulatory decisionmaking for LWRs.

- Does not call for NRC to approve individual methods used in licensee PRAs supporting risk-informed licensing applications

- Application of the guidance in RG 1.200 is sufficient.

8

RG 1.200 Section 3.3.1: If the pieces of the PRA can be shown to have met the requirements of these documents, with attention paid to the NRCs objections, it can be assumed that the analysis is technically correct. Therefore, other than an audit, a detailed review by NRC staff of the base model PRA will not be necessary.

- Peer review against the ASME/ANS PRA Standard is sufficient for demonstrating PRA technical adequacy.

Table 15, Item 5: determines that, when acceptable methods are not specified in the standard, or when alternative methods are used in lieu of those identified in the standard, the methods used are adequate to meet the requirements of the standard

- Peer reviews are capable of addressing new methods

- NEI PRA peer review guidance updated to support this more explicitly 9

SRP 19.3

  • The PRA elements are assessed to determine whether they have been performed in a technically correct manner that conforms to the NRC endorsed PRA standards. This can be determined by an assessment of whether the PRA elements are performed consistent with the standard and peer review process as endorsed in the appendices to RG 1.200.

- A licensees evaluation using Regulatory Guide 1.200 is sufficient to support a review.

10

NFPA 805 Section 4.4.5.3 The PSA [Probabilistic Safety Assessment] approach, methods, and data shall be acceptable to the AHJ [Authority Having Jurisdiction].

Acceptable to the AHJ - relevant regulatory body approves of the general approach to be used Example: Permitting occupancy of buildings for federal workers Regional GSA fire protection engineer (the AHJ), may accept the use of NFPA 25 for sprinkler testing Does not mean that the regional GSA fire protection engineer individually reviews and accepts every action undertaken as part of sprinkler testing in a given facility Means that testing is acceptable if done in accordance with NFPA 25.

Analogous interpretation for implementation of NFPA 805 Use of the ASME/ANS PRA Standard, as endorsed in Regulatory Guide 1.200, to evaluate the acceptability of a licensees PRA via the peer review process 11

TSTF-505 NEI 06-09 SE As part of its review and approval of a licensees application requesting to implement the RMTS, the NRC staff intends to impose a license condition that will explicitly address the scope of the PRA and non-PRA methods approved by the NRC staff for use in the plant-specific RMTS program. If a licensee wishes to change its methods, and the change is outside the bounds of the license condition, the licensee will need NRC approval, via a license amendment, of the implementation of the new method in its RMTS program.

PRA and non-PRA methods approved by the NRC staff for use in the plant-specific RMTS program In this context, method refers to the analysis approach (PRA or non-PRA) that a licensee uses to evaluate a hazard TR NEI 06-09, Revision 0, permits the use of either PRA or non-PRA type quantitative evaluations, including conservative or bounding methods, to assess risk of these events and conditions. The specific method to be utilized in the RMTS program would be identified and technically justified by the licensee in its plant-specific application to implement the RMTS, and would be reviewed and approved by the NRC staff in a license amendment implementing the RMTS.

Conservative or bounding methods as an example of non-PRA methods also indicates that the intent of the safety evaluation is that method in the context of the referenced license condition refers to the analysis approach used to evaluate a hazard 12

TSTF-505 NEI 06-09

- Quantification of risk due to internal fire and other significant external events is also necessary for this application, through PRA or bounding methods.

  • In PRA or bounding methods, the term methods means technical approach to addressing a hazard
  • PRA or non-PRA approaches.

- The scope of the PRA model shall include Level 1 (CDF) plus large early release frequency (LERF). In addition, RICT and RMAT calculations shall include contributions from external events, internal flooding events, and internal fire events. Inclusion of these factors within the PRA is not explicitly required provided alternate methods (e.g., conservative or bounding analyses) are used to accomplish this requirement.

  • NRC took no exception to these sections, and clearly aligned with this interpretation 13

New Approach (e.g. new Seismic PRA)

New Approach (e.g. new Seismic PRA)

Submit LAR Submit LAR Changes to PRA as evaluated in original TSTF-505 LAR Changes to PRA as evaluated in original TSTF-505 LAR Upgrade Upgrade Perform Peer Review Perform Peer Review Update Update Maintenance process as evaluated in original TSTF-505 LAR Maintenance process as evaluated in original TSTF-505 LAR Report Changes to NRC Report Changes to NRC Use Model in RICT Program Use Model in RICT Program Overview of Proposal

PATH FORWARD

  • Realize mutual understanding of general regulatory guidance related to PRA methods
  • Finalize content of administrative TS requirement on reporting of PRA upgrades
  • Continue to foster understanding of and confidence in PRA peer review process 15