MONTHYEARML24270A0652024-09-26026 September 2024 ABWR Design Certification Annual 10 CFR 50.46 Report for 2024 ML23277A1692023-10-0404 October 2023 GE-Hitachi Nuclear Energy Americas, LLC, ABWR Design Certification Annual 10 CFR 50.46 Report for 2023 ML20269A1842020-09-25025 September 2020 ABWR Design Certification Annual 10 CFR 50.46 Report for 2020 ML20076D9632020-03-16016 March 2020 GE Hitachi Nuclear Energy, Transmittal of ABWR Standard Plant Design Certification Renewal Application Design Control Document Revision 7, Chapter 5 ML20007E2742019-12-20020 December 2019 GE Hitachi Nuclear Energy - ABWR Standard Plant Design Certification Renewal Application Design Control Document Revision 7, Tier 1 and Tier 2 ML20129J8972019-10-31031 October 2019 ABWR DC Renewal Supplemental FSER Appendix E Report by Advisory Committee on Reactor Safeguards ML19171A2932019-06-27027 June 2019 ABWR DC Renewal Issue 18b Section 9.1.2.2 New and SFP Racks Seismic Structural Analysis Rev 4 ML19171A2912019-06-27027 June 2019 Letter to Applicant - GEH ABWR DC Renewal Issue 18b for Section 9.1.2.2 New and SFP Racks Seismic Structural Analysis ML19164A0352019-06-20020 June 2019 Letter to Applicant - GEH ABWR DC Renewal Section 1 Introduction and General Discussion ML19148A7802019-06-19019 June 2019 ABWR DC Renewal Issue 26 Section 7.4.1.4.4 Shutdown Panel Inst Rev 4 ML19148A4632019-06-19019 June 2019 ABWR DC Renewal Issue 26 SER for Section 16 Technical Specifications Revision 3 ML19114A3532019-06-19019 June 2019 ABWR DC Renewal SER Section 9.1.3 Fuel Pool Cooling and Cleanup System Pointer SER Rev 4 ML19162A0802019-06-19019 June 2019 Letter to Applicant - GEH ABWR DC Renewal Issue 09 Section 6.2.1.9 ECCS Strainers ML19113A1732019-06-19019 June 2019 ABWR DC Renewal SER Section 3.2.3 Safety Classifications Pointer SER Rev 4 ML19156A1802019-06-12012 June 2019 Letter to Applicant - GEH ABWR DC Renewal Issue 19 & 20 for Section 9.1.2.1 New and Spent Fuel Storage ML19156A1512019-06-12012 June 2019 Letter to Applicant - GEH ABWR DC Renewal Issue 18a for Section 4.2 Rx LOCA and Seismic Load ML19155A2102019-06-12012 June 2019 Letter to Applicant - GEH ABWR DC Renewal Issue 38 Section 6.3 Emergency Core Cooling Systems ML19148A4612019-06-12012 June 2019 Letter to Applicant - GEH ABWR DC Renewal Issue 26 SER for Section 16 Technical Specifications ML19141A3712019-06-0606 June 2019 Letter to Applicant - GEH ABWR DC Renewal Issue 26 SE for Section 22 Fukushima Design Related Changes ML19148A7782019-06-0505 June 2019 Letter to Applicant - GEH ABWR DC Renewal Issue 26 SER for Section 7.4.1.4.4 Shutdown Panel ML19149A3152019-06-0505 June 2019 Letter to Applicant - GEH ABWR DC Renewal Issue 26 SER for Section 8.3.4.4 Class 1E Bus Isolation ML19148A5932019-06-0505 June 2019 Letter to Applicant - GEH ABWR DC Renewal Issue 26 SER for Section 5.4.7.1.1.10 Aciwa ML19148A5152019-06-0505 June 2019 Letter to Applicant - GEH ABWR DC Renewal Issue 26 SER for Section 5.4.7 Residual Heat Removal System ML19114A3512019-06-0505 June 2019 Letter to Applicant - GEH ABWR DC Renewal Issue 27 SE for Section 9.1.3 Fuel Pool Cooling and Cleanup System Revision 0 ML19114A3382019-06-0505 June 2019 Letter to Applicant - GEH ABWR DC Renewal Issue 27 SE for Section 7.5.2.1 Post Accident Monitoring Revision 0 ML19113A1762019-06-0505 June 2019 Letter to Applicant - GEH ABWR DC Renewal Issue 27 SE for Section 3.2.3 Safety Classifications Revision 0 ML19142A1862019-05-31031 May 2019 GE Hitachi Nuclear Energy U. S. Advanced Boiling Water Reactor Design Certification Renewal Schedule Letter, May 2019 ML18234A4312019-02-0404 February 2019 Letter Safety Evaluation with No Open Items GEH ABWR DC Renewal Subsection 6.2.1.6 ML18164A1092019-02-0404 February 2019 Letter to Applicant - GEH ABWR DC Renewal SE for Subsection 6.2.1 ML18163A2442019-02-0404 February 2019 GE Hitachi Advanced Boiling Water Reactor DC Renewal Proprietary Review Letter Response to Requests for Additional Information SSP Long Term Recirculation Capability ML19021A0152019-01-21021 January 2019 GE-Hitachi Nuclear Energy Americas, LLC - Peak Cladding Temperature/10 CFR 50.46 for Advanced Boiling Water Reactor (ABWR) Design Certification Renewal Application, Supplemental Information ML19002A3912019-01-15015 January 2019 Letter to Applicant - GEH ABWR DC Renewal SE for Subsections 8.2.5 and 8.3.3.17 ML19002A3932019-01-11011 January 2019 Memo to ACRS - GEH Advanced Boiling Water Reactor DC Renewal Safety Evaluation for Subsections 8.2.5 and 8.3.3.17 ML18346A5612018-12-19019 December 2018 Letter to Applicant - GEH ABWR DC Renewal Issue 10 SE for Section 5.4.8 ML18312A1632018-12-0404 December 2018 Letter to Applicant - ABWR DC Renewal Safety Evaluation, Section 19.1, Probabilistic Risk Assessment ML18312A1622018-12-0404 December 2018 Safety Evaluation - ABWR DC Renewal Safety Evaluation, Section 19.1, Probabilistic Risk Assessment ML18275A1772018-11-15015 November 2018 Letter to Applicant - GEH ABWR DC Renewal SE for Section 19.5 ML18200A3192018-07-26026 July 2018 Letter to Applicant - GEH ABWR DC Renewal SE for Subsection 3.7.3 ML18183A4322018-07-12012 July 2018 Advanced Boiling-Water Reactor Design Certification Renewal Application - Safety Evaluation with No Open Items for Section 9.1.4, Light Load Handling System ML18183A4172018-07-12012 July 2018 Letter to Applicant - GEH ABWR DC Renewal SE for Section 9.1.5 ML18183A3712018-07-12012 July 2018 Letter to Applicant - GEH ABWR DC Renewal SE for Section 9.1.1 ML18176A1442018-06-28028 June 2018 Letter to Applicant - GEH ABWR DC Renewal SE for Section 13 ML18176A1432018-06-27027 June 2018 Memo to ACRS - GEH ABWR DC Renewal SE for Section 13.5 ML18155A2902018-06-13013 June 2018 Letter to Applicant - GEH ABWR DC Renewal SE for Section 3.5.1.4 Missiles Generated by Natural Phenomena ML18155A2122018-06-13013 June 2018 Letter to Applicant - GEH ABWR DC Renewal SE for Section 2.3 Meteorology ML18155A2352018-06-13013 June 2018 Letter to Applicant - GEH ABWR DC Renewal SE for Section 3.3 Severe Wind and Extreme Wind (Tornado and Hurricane) Loadings ML18114A0362018-05-0202 May 2018 Letter - Advanced boiling-Water Reactor Design Certification Renewal Application Safety Evaluation with No Open Items for Section 5.2.5, Reactor Coolant Pressure Boundary Leakage Detection ML18088A2222018-04-10010 April 2018 Letter Safety Evaluation with No Open Items for Section 13.3, Emergency Planning ML18092A3032018-03-28028 March 2018 GE-Hitachi Nuclear Energy Americas, LLC - Advanced Boiling Water Reactor Design Certification Rule Renewal Application - Additional Information for Response to Rals 06.03-4 Through 06.03-9 ML18059A3422018-03-0808 March 2018 Letter to Applicant - GEH ABWR DC Renewal SE for Section 9.5.1 Final 2024-09-26
[Table view] Category:Proprietary Information Review
MONTHYEARML18163A2442019-02-0404 February 2019 GE Hitachi Advanced Boiling Water Reactor DC Renewal Proprietary Review Letter Response to Requests for Additional Information SSP Long Term Recirculation Capability 2019-02-04
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 February 4, 2019 Ms. Michelle P. Catts Senior Vice President, Regulatory Affairs GE Hitachi Nuclear Energy 3901 Castle Hayne Road MC A-18 Wilmington, NC 28401
SUBJECT:
REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE FOR GE-HITACHI NUCLEAR ENERGY ADVANCED BOILING-WATER REACTOR DESIGN CERTIFICATION RULE RENEWAL APPLICATION
Dear Ms. Catts:
By letter dated March 28, 2018 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML18092A303), you submitted an affidavit, executed on March 20, 2018 by Patricia L. Campbell, Vice President, Washington Regulatory Affairs, of GE-Hitachi Nuclear Energy Americas LLC (GEH), requesting that the information contained in Enclosure 4, GEH proprietary report, NEDE-33878P be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 2, Section 2.390. Enclosure 4 is titled as follows:
NEDO-33878, Revision 3 ABWR ECCS Suction Strainer Evaluation of Long-Term Recirculation Capability" A nonproprietary copy of this document, Enclosure 3, has been placed in the U. S. Nuclear Regulatory Commission (NRC) Public Document Room and added to the ADAMS Electronic Reading Room (ADAMS Accession No. ML18092A306).
The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure because it is:
- a. Information that discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its use by GEHs competitors without license from GEH constitutes a competitive economic advantage over GEH and/or other companies;
- b. Information that, if used by a competitor, would reduce their expenditure of resources or improve their competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product.
M. Catts We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of your statements, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions or comments concerning this matter, I can be reached at 301-415-4093 or via e-mail address at Adrian.Muniz@nrc.gov.
Sincerely,
/RA/
Adrian Muniz, Lead Project Manager Licensing Branch 3 Division of Licensing, Siting, and Environmental Analysis Office of New Reactors Docket No.52-045
Enclosure:
As stated cc: See next page
ML18163A244 - Letter
- via e-mail NRO-002 OFFICE NRO/DSLE/LB3:PM NRO/DSLE/LB3:LA NRO/DSLE/BC (A)
NRO/DSLE/LB3:PM NAME JShea SGreen*
JRankin AMuniz DATE 6/12/2018 6/12/2018 1/24/2019 2/4/2019
DC GEH - ABWR Mailing List (Revised 08/16/2018)
Email APH@NEI.org (Adrian Heymer) awc@nei.org (Anne W. Cottingham) brianr.johnson@ge.com (R. R. Johnson)
Christopher.Powell@ge.com (Christopher Powell) cschlaseman@mpr.com (Caroline Schlaseman)
CumminWE@Westinghouse.com (Edward W. Cummins) cwaltman@roe.com (C. Waltman) david.lewis@pillsburylaw.com (David Lewis)
F.Shahrokhi@areva.com (Farshid Shahrokhi)
George_Stramback@Charter.net (George Stramback) jerald.head@ge.com (Jerald G. Head)
Joseph.Ondish@ge.com (Joseph Ondish)
Joseph_Hegner@dom.com (Joseph Hegner)
Kenichi.Sato.sz@hitachi.com (Kenichi Sato)
KSutton@morganlewis.com (Kathryn M. Sutton) kwaugh@impact-net.org (Kenneth O. Waugh)
Linda.Dolan@ge.com (Linda Dolan) lon.burnam@house.state.tx.us (Lon Burnam)
Maryann.Herzog@ge.com (Maryann Herzog) media@nei.org (Scott Peterson)
MSF@nei.org (Marvin Fertel) nirsnet@nirs.org (Michael Mariotte)
Nuclaw@mindspring.com (Robert Temple)
Paul@beyondnuclear.org (Paul Gunter) pbessette@morganlewis.com (Paul Bessette)
RJB@NEI.org (Russell Bell) rtrench@mpr.com (Randy Trench)
Ryan.hough@ge.com (Ryan Hough) sabinski@suddenlink.net (Steve A. Bennett) tom.miller@hq.doe.gov (Tom Miller) trsmith@winston.com (Tyson Smith)
Vanessa.quinn@dhs.gov (Vanessa Quinn) wayne.marquino@gmail.com (Wayne Marquino)
Page1 of 1