ENHANCED STRATEGIC WORKFORCE PLANNING PILOT Lessons-Learned Report June 8, 2018

Enhanced Strategic Workforce Planning Pilot Lessons-Learned Final Report PURPOSE:

The purpose of this paper is to provide the results of the lessons-learned review of the Enhanced Strategic Workforce Planning (SWP) pilot, including strengths, challenges, estimated resources, and recommended improvements to the process. This report was prepared in accordance with the direction provided in the NRCs Executive Director for Operations (EDO) tasking memo Implementation of Enhancements to Nuclear Regulatory Commissions (NRC)

Strategic Workforce Planning (Agencywide Documents Access and Management System (ADAMS) Accession No. ML17179A111, dated July 5, 2017).

BACKGROUND:

In SECY 15-0015, Achieving Exemplary Nuclear Regulation in the 21st Century" (ADAMS Accession No. ML15023A558, dated January 30, 2015), the NRC staff recommended developing a strategic workforce plan that ensures the NRC has the right number of people with the right competencies at the right time. In the Staff Requirements Memorandum (SRM) for SECY 15-0015 (ADAMS Accession No. ML15159A234, dated June 8, 2015), the Commission approved the development of a strategic workforce plan.

In response to SECY 15-0015, task 8, the staff developed the NRC Strategic Workforce Plan (ADAMS Accession No. ML16032A343, dated February 4, 2016). Although the plan provided a roadmap to manage the NRCs workforce, the scope of this initial workforce planning effort was at a basic level of sophistication based on the application of the Office of Personnel Management (OPM) Workforce Planning Model. The plan included the use of an iterative approach to advance the level of sophistication in the application of the OPM Workforce Planning Model, commensurate with the needs of the agency.

On January 19, 2017, consistent with the Commissions direction for Project Aim and the NRCs Fiscal Year (FY) 2014 - 2018 Strategic Plan, the EDO formed a working group to develop a more comprehensive, integrated, and systematic SWP process. The working group enhanced the existing SWP plan by better integrating the agencys human capital management activities, including workload projection, skills identification, and individual development with other agency processes, as well as reflected best practices from public and private sector organizations. The working group submitted their recommendations in the Proposed Enhancements to NRCS Strategic Workforce Planning (ADAMS Accession No. ML17109A319, dated April 19, 2017),

and the process map (ADAMS Accession No. ML17179A109, dated July 7, 2017).

Representatives of the working group presented the proposed enhanced SWP process to the Commission at the Briefing on Human Capital and Equal Employment Opportunity on June 22, 2017. Following the briefing, the Commission issued SRM-M170622B (ADAMS Accession No. ML17180A084, dated June 28, 2017) requiring the following: The staff should evaluate whether the enhanced strategic workforce planning process could be modified to capture process efficiencies NRC has made under Project Aim and should communicate the results of this evaluation to the Commission.

1

Enhanced Strategic Workforce Planning Pilot On July 5, 2017, the EDO approved the working groups proposal and issued a tasking memo Implementation of Enhancements to NRCs Strategic Workforce Planning to the Office of the Chief Financial Officer (OCFO), Region II, and the Office of Nuclear Regulatory Research (RES). The memo directed these offices to participate in the Phase I - Pilot, in partnership with the Office of the Executive Director for Operations (OEDO) and the Office of the Chief Human Capital Officer (OCHCO).

DISCUSSION Office and region management from the participating pilot offices (RES, OCFO, and Region II) implemented the enhanced SWP process in partnership with the OEDO and OCHCO. The OEDO and the OCHCO formed an implementation team, including a dedicated project manager, to lead the effort. The pilot implementation followed the approach outlined in the working groups Proposed Enhancements to NRCs Strategic Workforce Planning and the process map, with slight modifications due to the small number of offices participating in the pilot. In addition, the implementation team made enhancements throughout the process based on feedback, additional research, and technology developed.

Scope of the Pilot The scope of the NRC enhanced SWP process pilot focused on core positions categorized based on their clear link to the agencys mission and strategic plan. Core positions collectively define the competencies needed to achieve the NRC strategic goals and objectives. OCHCO worked with the offices to define the core positions at the beginning of the pilot. Appendix A -

NRC List of Core Positions (Pilot) contains the list of core positions for the pilot offices.

Core positions in the pilot represented the following number of employees as of March 9, 2018.

Total # of Total # of Employees in Office/Region Employees Core Positions OCFO 99 73 Region II - Atlanta, GA 262 174 RES 199 159 Total 560 406 Summary of the Enhanced SWP Process and Activities The enhanced SWP process is designed to be implemented on an annual cycle, and it supports the development of strategies to address workforce needs in both budget execution year +1 and budget execution year +5. Appendix B - Enhanced Strategic Workforce Planning Process provides a more in-depth view of all components of the enhanced SWP process. Below is a high-level overview of the enhanced SWP process:

1) Step 1.0 - Set Strategic Direction: Builds upon the strategic plans environmental scan performed by most offices and regions to monitor key workload drivers and internal and external opportunities and risks that may influence current and/or future workload.

Deliverables:

a. Narrative outlining Drivers and Factors and High-Level Projections and Assumptions on Workload Volume and Fluctuations.

2

Enhanced Strategic Workforce Planning Pilot

b. Workload forecast documented in the SWP template.
2) Step 2.0 - Workforce Demand Analysis: Uses the workload forecast to determine the quantity as well as the competencies of the workforce needed.

Deliverable: Document the results of the workforce demand analysis.

3) Step 3.0 - Workforce Supply Analysis: A review of the current workforce to project the size and competencies of the workforce into the future.

Deliverable: Completion of the workforce supply analysis in the SWP database.

4) Step 4.0 - Gap Analysis and Risk Assessment: Determines and prioritizes the gaps and/or overages that may exist between the information collected from Step 2.0 and Step 3.0.

Deliverable: Prioritized list of gaps and/or overages.

5) Step 5.0 - Develop and Execute Strategies: Develop strategies and action plan(s) to address overages or gaps identified in Step 4.

Deliverables:

a. Office/Region SWP Strategies and Action Plans.
b. An Agency SWP Strategies and Action Plan, prepared by OCHCO, for those strategies that cut across the agency.
6) Step 6.0 - Monitor, Evaluate, and Revise Strategies and Action Plans.

Deliverable: Update or revise the following as required: Office and Region SWP Strategies and Action Plans, and Agency SWP Strategies and Action Plans.

Supporting Documents and Activities To implement the pilot, and ensure consistent execution of the process, OCHCO and OEDO developed guidance and templates, a database, and provided training to the offices and region.

The implementation team created a process map (flow chart) to provide a visual of the enhanced SWP process. Guidance documents and templates provided detailed instructions to assist in the execution of the process steps and an explanation of the specific deliverables. An access database was developed to support data collection and analysis. The pilot offices received training in September 2017 and January 2018 on SWP concepts and executing the enhanced SWP process. Appendix B provides a more detailed description of the development and use of these supporting documents and activities.

3

Enhanced Strategic Workforce Planning Pilot Capturing Process Efficiencies The staff evaluated the enhanced SWP process in accordance with the direction of SRM-M170622B (ADAMS Accession No. ML17180A084, dated June 28, 2017), to determine whether the enhanced SWP process could be modified to capture process efficiencies the NRC has made under Project Aim. The pilot offices evaluated and documented efficiencies as part of the deliverable in Step 1.2 - Workload Forecast. Following the written guidance, the pilot offices reported on efficiencies resulting from Project Aim or other activities that had an impact on the forecasted workload in the Workload Forecast Template. For example:

  • RES, re-baselining resulted in about a 5% overall efficiency improvement at existing workload levels.
  • In Region II, the activities related to the Agency Reform Plan, enhanced risk informing of Reactor Oversight Process, and inspection report streamlining resulted in a slight decrease in staff for Operating Reactor Oversight Inspection Manual Chapter (IMC) 2515 inspections.

Insights and Lessons-Learned Throughout the pilot, the implementation team collected feedback in a variety of ways including:

  • Pilot office review of guidance documents
  • Interviews and meetings with pilot offices following key steps in the process
  • Discussions with pilot office Point of Contacts (POCs)
  • Training assessments
  • Surveys of supervisors and managers participating in the pilot The implementation team made adjustments in real time when supported by the timing of the receipt of feedback. On May 16, 2018, the feedback was presented to the implementation team and pilot offices for review, validation, and refinement as part of the lessons-learned work session.

Strengths Overall, the process design concept was effective, and the pilot offices completed the required deliverables and demonstrated the feasibility and efficiency of the enhanced process. The pilot offices concluded that the process provided valuable workforce information and insights for both management and staff, and the information collected was used to improve workforce planning. The gap analysis comparing projected workforce needs to supply revealed previously unidentified gaps or other disconnects earlier than otherwise would have been determined without the help of the enhanced SWP process. This early identification will allow for sufficient time and opportunity to develop competencies of existing NRC employees to meet future projected agency needs. Finally, the forecasting of workload provided insights into long-range budget planning beyond the typical two-year planning.

Strengths related to implementing the process included the use of POCs in each of the pilot offices. The pilot office POCs coordinated their offices participation and provided the support and knowledge necessary to ensure successful completion of each process step and deliverable. In addition, the guidance, templates, training, and SharePoint site provided adequate support of the process.

4

Enhanced Strategic Workforce Planning Pilot Overall, the pilot results demonstrated that the enhanced SWP process can identify short-and long-term strategies and action plans to address gaps and overages in workforce needs.

The strategies developed demonstrated a deeper understanding of the workload forecasted and the competencies needed beyond the typical two-year budget cycles. These strategies and action plans will improve the agencys human capital management activities, identify employee opportunities for career growth, and provide for a greater understanding of the future workload of the NRC.

Implementation of the enhanced SWP process will address the U.S. Government Accountability Offices (GAO) recommendations in GAO-17-233, Strategic Human Capital Management: NRC Could Better Manage the Size and Composition of its Workforce by Further Incorporating Leading Practices, dated April 27, 2017. Specifically, the information collected in the pilot indicates that with more offices are participating, the SWP information will help the agency develop long-range Full Time Equivalent (FTE) forecasts and inform the strategic planning activities to meet agency goals for overall workforce size and skills composition. The pilot also addressed GAOs recommendation to provide training on the concepts and application of strategic workforce management.

Challenges The enhanced SWP process required the pilot offices to think differently about the impact of external and internal factors on their workforce, planning their workload, and determining the type of workforce needed. Developing a range of future scenarios for the environmental scan that are a balance between a forecast and reality was challenging. The higher level of detail required to plan beyond the two-year budget cycle was also new for many participants and proved difficult. In addition, the timing of when to share the workload forecast information with the staff was a challenge given that the information could cause unnecessary staff concern.

Finally, offices have been accustomed to taking their own less-formal approach to workforce planning, and implementing this more standardized approach required a change in practices and organizational culture.

Although the implementation team and the pilot offices were able to define the core positions and the associated knowledge, skills, and abilities, the methodology of using job analyses to do so required additional time and resources. In addition, the implementation team investigated a short-term solution for developing a new skills inventory database to support the pilot and house the information collected in the job analyses. However, the rapid pace of the pilot, along with the significant resources required to develop a stand-alone database, were not compatible with the time and resources available. In addition, the team determined that development of a skills database would have unnecessarily duplicated efforts currently underway with the development and application of the competency-modeling pilot, which uses vendor provided software to develop the models and track skills in an aggregate and individual manner.

Future Consideration Although the working groups original recommendations included plans for assessing both employee and contractor needs as part of the enhanced SWP process, the implementation team decided to focus the scope of the pilot on NRC employees only. The implementation team believed that not adding in the complexity of considering contractors during the pilot helped to ensure adequate support and attention for managers to learn the new associated concepts and the standardized process. RES chose to test documenting information of contracted workers who supplement their workforce, such as individuals, companies, other agencies, National 5

Enhanced Strategic Workforce Planning Pilot Laboratories, universities, research institutions, or foreign counterparts. RESs experience and the information they collected provided helpful insights into how the agency may potentially collect this information as a strategic companion plan to the SWP process in the future.

RESOURCES Resources expended for the pilot:

  • OEDO - <0.25 FTE, to include support for the kickoff, environmental scan, workload forecast, and review of gap/overage closure strategies.
  • OCHCO - 1.5 FTE, to include one full time project manager and 0.5 FTE to support pilot offices.
  • Pilot Offices - POCs required 0.25 FTE for the duration of the implementation. Offices expect that over time fewer resources will be required because the initial application of the enhanced process requires the greatest resources. Implementation of the process in subsequent years should require substantially less resources to update prior year forecasts of workload, workforce needs, and supply. Office leadership and management confirmed that this work is already budgeted as part of managers and supervisors responsibilities, and is not an extra function or resource burden.

RECOMMENDATIONS The following recommendations address improvements to the enhanced SWP process, training, communications, support technology, and the future implementation of the process.

Recommendation 1: Improve communications, guidance, templates, and training by streamlining, providing examples, and considering feedback.

A. Formalize the environmental scan activity to provide sufficient detail to drive the enhanced SWP process and engage management at all levels in the development of the workload forecast to build buy-in and support.

The pilot confirmed that the environmental scan, as part of Step 1.0 Set the Strategic Direction, is the foundation for the successful execution of the enhanced SWP process.

The environmental scan and workload forecast consider a range of future scenarios and are necessary to determine the number of people and requisite competencies to perform the forecasted work (demand). The environmental scan narratives developed by the offices provided high-level strategic direction and some information to facilitate scenario planning. Additional detail and documentation of the environmental scan will improve the offices and regions ability to forecast workload more accurately and consistently and determine the staff needed to perform the work. The SWP process includes planning for a range of possible scenarios. The environmental scan needs to consider the scenarios and their application in subsequent process steps.

As previously stated, some managers were challenged with planning work beyond the typical two-year budget cycle. Aligning across business lines and the agency is critical to this type of long-term planning. The pilot offices met with the business lines to gather insights. However, the pilot intentionally deviated slightly from what the working group proposed for this step, by not conducting and establishing the strategic direction through the fall Strategic Leadership Meeting. This deviation was due to the small number of 6

Enhanced Strategic Workforce Planning Pilot offices participating in the pilot, Implementing this step as originally designed, and adding slightly more structure to these discussions, will ensure the environmental scan and strategic direction are comprehensive and take into account projected workload, along with insights from business lines and partner offices. Office leadership should share the environmental scan and forecasts with management at all levels to encourage collaboration and diverse thoughts, and to ensure managers understand the basis for the direction described in the environmental scan. In addition, managers need to understand how they should apply the workload forecast in the subsequent steps of the enhanced SWP process. By following the original working groups design of the process for Step 1.0 - Set the Strategic Direction, along with the recommended improvements contained in this report, the implementation team expects that the environmental scan and workload forecast will improve.

B. Share the information gathered as part of the enhanced SWP process, including strategies and action plans, with as much transparency as possible.

Sharing information gathered from the SWP process benefits employees because it empowers them to make career planning and development decisions consistent with agency long-term needs. Managers expressed concern in sharing workload forecast information with the staff due to the degree of uncertainty with long-term forecasting. To address this concern, offices and regions should treat the information collected as pre-decisional, and use discretion about when and how best to share the information with employees. Sharing the information too early in the process may cause undue concern among staff. However, when the workload forecast information is combined with the information from the other steps in the process, the workload projections and needs reflect a more complete and informed view of the offices and agencys direction.

Benchmarking indicates that leaders and management will improve their long-term plans with practice and repetition of the process, resulting in a higher level of transparency and more effective, efficient, and inclusive planning. Consistent with NRCs Leadership Model, these enhancements can strengthen collaboration and empowerment among NRC employees and organizations, as well as reinforce the behaviors emphasized in the Speed of Trust (e.g., confront reality, talk straight, clarify expectations, get better).

C. Clarify and refine the definition of core positions and their purpose.

The pilot offices struggled to apply the definition of a core position throughout the SWP process. As defined in the working groups recommendations, core positions are positions that the NRC relies on to accomplish the majority of the agencys mission and are necessary to achieve agency long-term strategies and goals. This definition applies equally to the regulatory work and corporate work of the agency. The pilot organizations initially wanted to include more positions in the core position category. However, doing so would require an increasingly fine level of detail and more resources. Ultimately, establishing the scope of strategic workforce planning must strike the right balance between value to the agency and organization and the resources required to conduct workload forecasts and workforce supply analysis. In addition, the pilot offices determined that greater specification of sub-specialties within core positions was necessary and appropriate in projecting workload and conducting the supply analysis.

The implementation team began working with the offices before training on the SWP began in order to identify core positions and define the competencies due to the amount of time it took to do this work. The pilot offices adjusted the list of core positions throughout the execution of the SWP process as they gained a greater understanding of 7

Enhanced Strategic Workforce Planning Pilot the process. Clarifying and refining the core positions throughout the SWP process is necessary.

Recommendation 2: Streamline the identification and tracking of competencies by aligning the SWP process with competency modeling and support software.

At the start of, and throughout the enhanced SWP process pilot, the competency-modeling project was also in a pilot mode. Therefore, the implementation team used job analyses rather than competency models to define the knowledge, skills, and abilities of the core positions identified. Some exceptions to this approach occurred for individuals who served in core positions that had established competency models, such as the risk and reliability engineers in RES. The implementation team used several different approaches to complete the job analyses for the core positons. All of the approaches for developing the job analyses required additional staff resources for both OCHCO and the pilot offices.

Recommendation 3: Require each office to select one or more individuals to serve as POCs (depending on office size). The POC must be capable of interacting with all levels of management in a timely and effective manner and act as a SWP champion.

Identifying and relying upon office POCs successfully contributed to the pilot implementation.

Each office should designate one or more individuals to be a liaison with OCHCO and OEDO for implementation of the enhanced SWP process in their office.

Recommendation 4: Adjust timing of training and offer blended learning options that include both instructor-led classroom and online training options.

The implementation team provided two training workshops in an instructor-led classroom setting and via a Webinar format in the fall. These methods were effective for those supervisors and managers who were able to attend and should be continued. However, offering a blended learning experience where the manager would take an online training course and then participate in discussions on the materials may be a more efficient delivery mechanism for the training, and staff will investigate these options for Phase II. The fall timeframe can also prove challenging for managers due to the end of year performance appraisal activities taking place at the same time. Staff will work to schedule the training earlier, beginning in the summer months.

Recommendation 5: Improve the database used to support the collection of workforce demand and supply information by allowing synchronous access by multiple users, and improve usability.

The implementation team developed an SWP database as described in Appendix B. Access to the database was limited to one person at a time, which caused significant issues. In addition, some of the managers were not knowledgeable on the use of SharePoint. The POCs worked with their management and OCHCO to complete the deliverable with accuracy, although improvements to accessibility and usability of the database need to be addressed before implementation of Step 3.0 Workforce Supply for Phase II, which will see a larger number of users needing to access to the system.

8

Enhanced Strategic Workforce Planning Pilot Recommendation 6: Implement Phase II of the enhanced SWP process and expand the scope to include the following offices:

  • Phase I - Pilot Offices (RES, OCFO, and Region II)
  • Program Offices (Offices of Nuclear Materials Safety and Safeguards, Office of New Reactors, Office of Nuclear Reactor Regulation, and Office Nuclear Security and Incident Response)
  • Regions I, III, IV
  • Office of Chief Information Officer The implementation team confirmed that the offices need focused support to execute the concepts of strategic workforce planning and management for the first time. In addition, the NRC faced several cultural challenges as stated in section entitled Challenges. Therefore, continuing a phased approach, as recommended by best practices, allows time and additional support for NRC management to be educated in strategic workforce management and to initiate necessary cultural shifts. This recommendation will include approximately 79% of NRC workforce and allow OCHCO and OEDO to provide the level of support necessary for offices implementing the process for the first time. Expanding the scope to include most of the agency will also allow the staff to realize the agency-level benefits of strategic workforce planning by aggregating the needs, surpluses, gaps, and strategies across the agency. OCHCO and OEDO estimates the resources needed for Phase II will be similar to the resources expended in the pilot, with the exception of having a dedicated full-time project manager in OCHCO. OCHCO resources will remain at about 1.5 FTE, spread across a variety of staff performing multiple functions to support the process (i.e., human resources support, technology support, competency modeling, etc.). In addition, OCHCO and OEDO will be able to test the improvements to the process and support systems with a larger pool of offices. At the conclusion of Phase II in June 2019, OCHCO and OEDO will determine the extent to which the remaining offices should be included. In the meantime, the remaining offices will continue to use the existing NRC SWP plan.

CONCLUSION The pilot conducted has proven that the NRC can effectively and efficiently implement the NRC enhanced SWP process. The Lessons-Learned Report recommendations will further enhance the SWP process and enable OEDO and OCHCO to implement Phase II as proposed in this report. Therefore, the agency should implement the enhanced SWP process, taking into account all of recommendations. Once the enhanced processed is applied more broadly, the agency will gain the benefits of a more consistent and strategic estimation of workload and workforce projections and application of workforce strategies.