ML18159A359

From kanterella
Jump to navigation Jump to search
International - Notice of Start of Fabrication in Accordance with 10CFR71.93
ML18159A359
Person / Time
Site: 07100784, 07109374
Issue date: 06/08/2018
From: Hinojosa L
Holtec
To: Pierre Saverot
Document Control Desk, Office of Nuclear Material Safety and Safeguards
References
2370006-NRC
Download: ML18159A359 (1)


Text

KPS Technology Campus, 1 Holtec Blvd, Camden, NJ 08104 HOLTEC INTERNATIONAL June 8, 2018 Pierre Saverot, Project Manager Spent Fuel Licensing Branch Division of Spent Fuel Management Office ofNuclear Material Safety and Safeguards ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Docket No.: 71-9374 (HI-STAR 80 Model)

Telephone (856) 797-0900 Fax (856) 797-0909

Subject:

Notice of Start of Fabrication in Accordance with 10CFR71.93

Dear Mr. Saverot:

Holtec International provides herewith 45 days notification of the start of fabrication of the HI-STAR 80 Package as required by USNRC 1 OCFR 71.93. Fabrication will be performed in accordance with Holtec's QA program (Docket No. 71-0784).

If you have any questions, then please contact me at 856-797-0900, ext. 3698.

~