Letter Sequence Supplement |
|---|
|
Results
Other: ML17297A847, ML17303B158, ML17304A980, ML17304B153, ML17307A330, ML18030B178, ML18030B238, ML18030B361, ML18031A995, ML18249A049, ML18249A061, ML18249A075, ML18249A080, ML18249A091, ML18249A162, ML18249A178, ML18249A180, ML18249A231, ML18249A242, ML18249A334, ML18249A365, ML18249A380, ML18249A383, ML18249A386, ML18249A392, ML18249A407, ML18253A099, ML18253A130, ML18269A351
|
MONTHYEARML17117A5542017-04-27027 April 2017 Response to Request for Additional Information Regarding Generic Letter 2016-01 Project stage: Response to RAI ML17285B1962017-10-27027 October 2017 Request for Additional Information Regarding Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools Project stage: RAI ML17297A8472017-10-27027 October 2017 Request for Supplemental Information Regarding Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in Spent Fuel Pools (CAC No. MF9430; EPID L-2016-LRC-0001) Project stage: Other ML17304A0102017-11-0101 November 2017 Unit Nos.1 and 2 - Request for Additional Information Regarding Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (CAC Nos. MF9444 and MF9445; EPID L-2016-LRC-0001) Project stage: RAI ML17303B1582017-11-0707 November 2017 FENOC-Beaver Valley Power Station, Units 1 and 2, Davis-Besse Nuclear Power Station, Unit 1, Perry Nuclear Power Plant Unit 1 - Generic Letter 2016-01, Request for Supplemental Information Project stage: Other ML17304A9802017-11-13013 November 2017 & Waterford Steam Electric Stream Electric Station - Request for Supplemental Information (CACs MF9409, MF9424, MF9433 and MF9438; EPID L-2016-LRC-0001) Project stage: Other ML17307A3302017-11-20020 November 2017 Request for Supplemental Information Regarding Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in Spent Fuel Pools(Cac Nos. MF9920, MF9452, MF9437, MF9919, and MF9432; EPID L-2016-LRC-0001) Project stage: Other ML17304B1532017-12-18018 December 2017 Request for Supplemental Information Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pool Project stage: Other ML18025A7992018-01-25025 January 2018 Response to Request for Additional Information Regarding Generic Letter 2016-01 Project stage: Response to RAI ML18030B2382018-04-13013 April 2018 Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools Project stage: Other L-75-522, Report of Leaking Socket Welds Will Not Be Available Until 11/21/19752018-05-24024 May 2018 Report of Leaking Socket Welds Will Not Be Available Until 11/21/1975 Project stage: Request ML18144A2382018-05-24024 May 2018 Response to Generic Letter 2016-01, Request for Supplemental Information Project stage: Request AEP-NRC-2018-01, Response to Request for Additional Information Regarding Generic Letter 2016-012018-05-25025 May 2018 Response to Request for Additional Information Regarding Generic Letter 2016-01 Project stage: Response to RAI L-18-121, Response to Request for Supplemental Information Regarding Generic Letter 2016-01 Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools.2018-05-25025 May 2018 Response to Request for Supplemental Information Regarding Generic Letter 2016-01 Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools. Project stage: Request ML18145A0392018-05-25025 May 2018 Response to Request for Supplemental Information Regarding Generic Letter 2016-01 Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools Project stage: Request RS-18-067, Response to Request for Additional Information Regarding Generic Letter 2016-012018-05-29029 May 2018 Response to Request for Additional Information Regarding Generic Letter 2016-01 Project stage: Response to RAI ET 18-0016, Response to Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in Spent Fuel Pools Request for Supplemental Information2018-05-29029 May 2018 Response to Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in Spent Fuel Pools Request for Supplemental Information Project stage: Request RA-18-0011, Response to Request for Supplemental Information Regarding Duke Energys Response to GL 2016-01 Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools2018-05-30030 May 2018 Response to Request for Supplemental Information Regarding Duke Energys Response to GL 2016-01 Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools Project stage: Request CNRO-2018-00021, Response to Request for Supplemental Information Regarding Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in the Spent Fuel Pools for Indian Point Energy Center, Unit 3 and Waterford 3 Steam Electric Station2018-05-30030 May 2018 Response to Request for Supplemental Information Regarding Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in the Spent Fuel Pools for Indian Point Energy Center, Unit 3 and Waterford 3 Steam Electric Station Project stage: Request ULNRC-06440, Response to Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools - Request for Supplemental Information2018-05-31031 May 2018 Response to Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools - Request for Supplemental Information Project stage: Request CNL-18-061, Response to NRC Request for Supplemental Information Related to Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools2018-05-31031 May 2018 Response to NRC Request for Supplemental Information Related to Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools Project stage: Supplement L-16-016, Response to NRC Rais Regarding Generic Letter 2016-012018-05-31031 May 2018 Response to NRC Rais Regarding Generic Letter 2016-01 Project stage: Request ML18031A9952018-08-27027 August 2018 Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (CAC No. MF9423; EPID L-2016-LRC-0001) Project stage: Other ML18030B1782018-08-27027 August 2018 Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (CAC No. MF9441; EPID L-2016-LRC-0001) Project stage: Other ML18030B3612018-08-30030 August 2018 Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (CAC No. MF9427; EPID L-2016-LRC-0001) Project stage: Other ML18249A3832018-09-26026 September 2018 Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (CAC Nos. MF9418 and MF9419; EPID L-2016-LRC-0001) Project stage: Other ML18249A4072018-09-26026 September 2018 Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (CAC MF9920, MF9452, MF9451, MF9425, MF9406-MF9408; EPID L-2016-LRC-0001) Project stage: Other ML18249A3652018-09-26026 September 2018 Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (CAC No. MF9437; EPID L-2016-LRC-0001) Project stage: Other ML18253A1302018-09-26026 September 2018 Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (CAC Nos. MF9920 and MF9432; EPID L-2016-LRC-0001) Project stage: Other ML18269A3512018-09-26026 September 2018 Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools Project stage: Other ML18253A0992018-09-26026 September 2018 Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (CAC No. MF9414; EPID L-2016-LRC-0001) Project stage: Other ML18249A3922018-09-26026 September 2018 Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (CAC MF9444, MF9445, MF9443, MF9440, MF9409; EPID L-2016-LRC-0001) Project stage: Other ML18249A3862018-09-26026 September 2018 Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (CAC Nos. MF9433 and MF9434; EPID L-2016-LRC-0001) Project stage: Other ML18249A2312018-09-26026 September 2018 Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (CAC No. MF9448; EPID L-2016-LRC-0001) Project stage: Other ML18249A3802018-09-26026 September 2018 Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (CAC Nos. MF9412 and MF9413; EPID L-2016-LRC-0001) Project stage: Other ML18249A3342018-09-26026 September 2018 Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (CAC Nos. MF9435 and MF9436; EPID L-2016-LRC-0001) Project stage: Other ML18249A2422018-09-26026 September 2018 Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (CAC Nos. MF9415 and MF9416; EPID L-2016-LRC-0001) Project stage: Other ML18249A0802018-09-26026 September 2018 Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (CAC Nos. MF9431 and MF9430; EPID L-2016-LRC-0001) Project stage: Other ML18249A0492018-09-26026 September 2018 Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (CAC Nos. MF9449 and MF9450; EPID L-2016-LRC-0001) Project stage: Other ML18249A0612018-09-26026 September 2018 Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (CAC Nos. MF9428 and MF9429; EPID L-2016-LRC-0001) Project stage: Other ML18249A0752018-09-26026 September 2018 Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (CAC Nos. MF9410 and MF9411; EPID L-2016-LRC-0001) Project stage: Other ML18249A0912018-09-26026 September 2018 Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (CAC Nos. MF9421 and MF9422; EPID L-2016-LRC-0001) Project stage: Other ML18249A1622018-09-26026 September 2018 Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (CAC No. MF9424; EPID L-2016-LRC-0001) Project stage: Other ML18249A1782018-09-26026 September 2018 Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (CAC No. MF9438; EPID L-2016-LRC-0001) Project stage: Other ML18249A1802018-09-26026 September 2018 Closeout of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (CAC Nos. MF9456 and MF9457; EPID L-2016-LRC-0001) Project stage: Other 2018-04-13
[Table View] |
Text
Tennessee Valley Authority, 1101 Market Street, Chattanooga, Tennessee 37402 CNL-18-061 May 31, 2018 10 CFR 50.54(f)
ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Watts Bar Nuclear Plant, Units 1 and 2 Facility Operating License Nos. NPF-90 and NPF-96 NRC Docket Nos. 50-390 and 50-391
Subject:
Tennessee Valley Authority Watts Bar Nuclear Plant Response to NRC Request for Supplemental Information Related to Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (CAC Nos. MF9407, MF9408; EPID L-2016-LRC-0001)
References:
- 1. NRC Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools, dated April 7, 2016, (ML16097A169)
- 2. Tennessee Valley Authority (TVA) Revised Response to NRC Generic Letter 2016 01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools, dated December 19, 2016, (ML16354B569)
- 3. NRC Letter to Those on the Attached List - Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools -Request for Supplemental Information (CAC Nos. MF9406, MF9407, MF9408, MF9412, MF9413, MF9418, MF9419, MF9421, MF9422, AND MF9451; EPID L-2016-LRC-0001), dated December 18, 2017 (ML17304B153)
- 4. Application to Revise Watts Bar Unit 2 Technical Specification 4.2.1, Fuel Assemblies, and Watts Bar Units 1 and 2 Technical Specifications Related to Fuel Storage (WBN-TS-17-028), dated December 20, 2017 (ML17354B282)
On April 7, 2016, the NRC issued Reference 1 to all power reactor licensees except those that have permanently ceased operation with all power reactor fuel removed from on-site spent fuel pool storage. On December 19, 2016, TVA submitted Reference 2 in response to Generic Letter (GL) 2016-01 for Browns Ferry, Sequoyah, and Watts Bar Nuclear Plants.
The purpose of this letter is to provide the Supplemental Information requested in Reference 3.
U.S. Nuclear Regulatory Commission CNL-18-061 Page 2 May 31, 2018 to this letter contains TVAs response to the requested information for Watts Bar Nuclear Plant (WBN).
Please note that this response is based on the current condition at WBN, which does not include a neutron absorber monitoring program. However, on December 20, 2017, TVA submitted Reference 4, to amend the licenses for WBN Units 1 and 2. As noted in that amendment request, if the change is approved, TVA will implement a Neutron Absorber Monitoring Program following the NRC-approved guidance in NEI 16-03-A, Guidance for Monitoring of Fixed Neutron Absorbers in Spent Fuel Pools, at WBN.
This letter contains no new regulatory commitments. Please contact Chris Riedl at 423-751-3835, if you have any questions concerning this response.
I declare under penalty of perjury that the foregoing is true and correct. Executed on the 31st day of May 2018.
Respectfully, Joe W. Shea Vice President, Nuclear Regulatory Affairs & Support Services
Enclosure:
Watts Bar Nuclear Plant, Units 1, and 2, Supplemental Information in Response to Generic Letter 2016-01 cc (Enclosures):
NRR Director - NRC Headquarters NRC Regional Administrator - Region II NRC Project Manager - Watts Bar Nuclear Plant NRC Senior Resident Inspector - Watts Bar Nuclear Plant J. W. Shea Digitally signed by J.
W. Shea Date: 2018.05.31 15:40:41 -04'00'
CNL-18-061 E-1 of 3 CNL-18-061 ENCLOSURE WATTS BAR NUCLEAR PLANT UNITS 1 and 2 SUPPLEMENTAL INFORMATION IN RESPONSE TO GENERIC LETTER 2016-01
CNL-18-061 E-2 of 3 Watts Bar Nuclear Plant Units 1 and 2 Supplemental Information in Response to Generic Letter 2016-01 NRC Generic Boral-RAl-1 Title 10 of the Code of Federal Regulations (10 CFR) Section 50.68, "Criticality accident requirements," and 10 CFR Part 50, Appendix A, General Design Criterion (GDC) 62, "Prevention of criticality in fuel storage and handling," provide the requirements for licensees with regard to maintaining subcriticality in the spent fuel pool (SFP). For licensees that utilize neutron absorbing materials (NAM) in the SFP, the boron-10 (10B) areal density (AD) of the NAM must be known so that the assumption for the 10B minimum AD in the SFP nuclear criticality safety (NCS) analysis of record (AOR) is supported. In order for the NRC staff to verify the requirements of 10 CFR 50.68 and GDC 62 are met, the staff needs to ensure that licensees are taking appropriate action to confirm that the 10B AD of their NAM can reasonably be expected to remain above the minimum assumed in the SFP NCS AOR. In addition, the condition of the NAM must be considered in the SFP NCS AOR. In order to verify whether or not the requirements of 10 CFR 50.68 and GDC 62 will continue to be met, the staff needs to verify that the potential reactivity changes due to degradation or physical changes to the NAM are accounted for in the SFP NCS AOR. This includes any changes that would affect the neutron spectrum for the SFP in addition to any loss of neutron attenuation capability.
Industry operating experience, as described in Information Notice (IN) 2009-26, "Degradation of Neutron Absorbing Materials in the Spent Fuel Pool," dated October 28, 2009 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML092440545), and IN 1983-29, "Fuel Binding Caused by Fuel Rack Deformation," dated May 6, 1983 (ADAMS Accession No. ML14043A291 ), has demonstrated that certain manufacturing processes and plant conditions (dose, chemistry, length of time installed, and installation configuration) have resulted in material deformation as a result of blisters or bulging associated with Boral.
Watts Bar Nuclear Plant (WBN) does not have a site-specific monitoring program, and consequently, is relying on general industry operating experience as a surrogate for the condition of the Boral installed in the SFP.
NRC RAI-1.a Please describe whether industry operating experience bounds the condition of the Boral at WBN, thereby ensuring that any degradation or deformation that may affect the Boral at WBN is identified.
WBN Response to RAI-1.a Through its Nuclear Safety Culture, procedures, and processes, WBN systematically and effectively collects, evaluates, and implements relevant internal and external operating experience (OE) in a timely manner. Issues emerging from the use of Boral in the spent fuel racks are monitored through the TVA Nuclear OE Program and Corrective Action Program.
CNL-18-061 E-3 of 3 As indicated in the original Generic Letter response for WBN, the site will continue to monitor industry OE related to Boral, which includes ongoing participation in the EPRI Neutron Absorber Users Group (NAUG) and its related programs (e.g., industrywide learning aging management).
Industry-wide, to date there have been no indications of a loss of Boral material of a nature that diminished the neutron-absorbing capability of the Boral (EPRI Report 1021052, Overview of BORAL Performance Based Upon Surveillance Coupon Measurements). WBN follows the EPRI Water Chemistry Control Program and there have been no indications of a loss of Boral neutron-absorbing capabilities at a plant following the guidelines. In addition, to date there are no plant-specific operating conditions or rack attributes that would merit concern that the WBN spent fuel racks or SFP environment are not bounded by the industry-wide OE. Finally, EPRI Report 3002013119, Evaluation of the Impact of Neutron Absorber Material Blistering and Pitting on Spent Fuel Pool Reactivity, documents that observed or foreseen degradation or deformation of the Boral has an insignificant impact on SFP criticality. The industry OE aligns with the WBN licensing basis.
The NAUG, through EPRI, is currently developing an industrywide program/database to aid in monitoring indications of potential Boral degradation and deformation. Over 70,000 water chemistry data points have been collected to date, from over 30 SFPs, for this program.
Surveillance data from 100 coupons across 20 SFPs has also been collected to date. The program, supported by EPRI NAUG and industry participants, is described in EPRI document 3002013122, Roadmap for the lndustrywide Learning Aging Management Program (i-LAMP)
For Neutron Absorber Materials in Spent Fuel Pools, and includes insights and feedback received from numerous communications with the NRC. Relevant issues emerging from this industry effort will be monitored through the TVA OE Program and Corrective Action Program.
NRC RAI-1.b In addition, discuss the criticality impact due to relevant material deformation identified in general industry operating experience, and whether it can be accommodated by the NCS AOR for WBN without exceeding NRC subcriticality requirements.
WBN Response to RAI-1.b To date, the industry OE has revealed no instances of an impact on SFP criticality due to observed Boral deformation (e.g. blistering) or degradation (e.g. pitting). The NAUG, through EPRI, has recently completed a study (EPRI Report 3002013119) which analyzes the criticality impact of blisters and pits on Boral. Simulations were performed for varying enrichment, burnup, areal density values, at unborated conditions (0 ppm), which is conservative for PWRs such as WBN. The study results demonstrate that pitting and blistering, on a scale much larger than any that has been observed in the industry OE, has an insignificant impact on SFP criticality. Therefore the SFP criticality safety analysis of record remains applicable.