Letter Sequence Supplement |
---|
CAC:MF5372, Provide RISK-INFORMED Extended Completion Times - RITSTF Initiative 4B (Approved, Closed) |
|
MONTHYEARML16036A3072016-02-18018 February 2016 Regulatory Audit Plan in Support of the License Amendment Requests to Implement Risk-Informed Technical Specifications Initiative 4b Project stage: Other L-2018-006, Third Response to Request for Additional Information Regarding License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Risk Informed Extended Completion Times - RITSTF Initiative 4b2018-02-0101 February 2018 Third Response to Request for Additional Information Regarding License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Risk Informed Extended Completion Times - RITSTF Initiative 4b Project stage: Response to RAI ML18141A8222018-05-21021 May 2018 NRR E-mail Capture - St. Lucie Plant, Unit Nos. 1 and 2 - Audit Plan and Setup of Online Reference Portal (CAC Nos. MF5372 and MF5373; EPID L-2014-LLA-0001) Project stage: Other L-2018-111, Second Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2018-06-0707 June 2018 Second Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b Project stage: Supplement ML18151A4342018-06-14014 June 2018 Summary of NRC Audit Regarding License Amendment Request to Adopt Risk-Informed Completion Times in Technical Specifications (CAC Nos. MF5372 and MF5373; EPID L-2014-LLA-0002) Project stage: Other ML18179A4332018-07-23023 July 2018 Summary of Regulatory Audit from 5/22 to 6/7/18, Implement Technical Specification Task Force Traveler TSTF-505, Rev, 1, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b Project stage: Other L-2018-150, Third Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b.2018-09-18018 September 2018 Third Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b. Project stage: Supplement ML18291A7492018-10-0404 October 2018 Submittal of Amendment 29 to Updated Final Safety Analysis Report and License Renewal 10CFR54.37(b) Report Project stage: Request L-2018-215, Resubmittal of Fourth Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2018-11-30030 November 2018 Resubmittal of Fourth Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b Project stage: Supplement ML19113A0242019-04-22022 April 2019 NRC Notification of State of Florida Regarding St. Lucie License Amendments - Regarding the Addition of Risk-Informed Completion Times Project stage: Other ML19113A0992019-07-0202 July 2019 Issuance of Amendments Regarding Adoption of Risk-Informed Completion Times in Technical Specifications Project stage: Approval 2018-06-14
[Table View] |
|
---|
Category:Letter type:L
MONTHYEARL-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2024-004, Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years2024-01-18018 January 2024 Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years L-2024-002, Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump2024-01-0808 January 2024 Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-179, Unusual or Important Environmental Event - Turtle Mortality2023-12-14014 December 2023 Unusual or Important Environmental Event - Turtle Mortality L-2023-168, License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 52023-12-12012 December 2023 License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 5 L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, L-2023-162, Response to 50.69 2nd Round of Rals2023-11-21021 November 2023 Response to 50.69 2nd Round of Rals L-2023-131, Subsequent License Renewal Application - Second Annual Update2023-09-28028 September 2023 Subsequent License Renewal Application - Second Annual Update L-2023-136, Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-26026 September 2023 Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2023-122, Corrections to the 2022 Annual Radiological Environmental Operating Report2023-09-20020 September 2023 Corrections to the 2022 Annual Radiological Environmental Operating Report L-2023-127, Correction to the 2022 Annual Radioactive Effluent Release Report2023-09-18018 September 2023 Correction to the 2022 Annual Radioactive Effluent Release Report L-2023-113, Correction to the 2020 Annual Radiological Environmental Operating Report2023-09-14014 September 2023 Correction to the 2020 Annual Radiological Environmental Operating Report L-2023-118, Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-11011 September 2023 Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2023-108, Report of 10 CFR 50.59 Plant Changes2023-09-11011 September 2023 Report of 10 CFR 50.59 Plant Changes L-2023-112, Corrections to the 2021 Annual Radioactive Effluent Release Report2023-09-0606 September 2023 Corrections to the 2021 Annual Radioactive Effluent Release Report L-2023-107, Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.42023-09-0606 September 2023 Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.4 L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2023-105, Preparation and Scheduling of Operator Licensing Examinations2023-08-0303 August 2023 Preparation and Scheduling of Operator Licensing Examinations L-2023-099, Pump Relief Request 10 (PR-10), One-Time Request for an Alternative to the American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump2023-07-26026 July 2023 Pump Relief Request 10 (PR-10), One-Time Request for an Alternative to the American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump L-2023-102, Relief Request PSL2-15-RR-01, Proposed Alternative to ASME Section XI Code Examination Requirements for Reactor Vessel Bottom Area and Piping in Covered Trenches2023-07-26026 July 2023 Relief Request PSL2-15-RR-01, Proposed Alternative to ASME Section XI Code Examination Requirements for Reactor Vessel Bottom Area and Piping in Covered Trenches L-2023-097, Subsequent License Renewal Application Revision 1 - Supplement 62023-07-13013 July 2023 Subsequent License Renewal Application Revision 1 - Supplement 6 L-2023-076, In-Service Inspection Program Owner'S Activity Report (OAR-1)2023-07-11011 July 2023 In-Service Inspection Program Owner'S Activity Report (OAR-1) L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)2023-06-29029 June 2023 Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) L-2023-082, Subsequent License Renewal Application Revision 1, Supplement 52023-06-14014 June 2023 Subsequent License Renewal Application Revision 1, Supplement 5 L-2023-074, Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update2023-06-0202 June 2023 Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update L-2023-071, NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal2023-05-22022 May 2023 NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal L-2023-059, Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 4 Supplemental Response2023-04-21021 April 2023 Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 4 Supplemental Response L-2023-055, 2022 Annual Environmental Operating Report2023-04-12012 April 2023 2022 Annual Environmental Operating Report L-2023-041, Annual Radiological Environmental Operating Report for Calendar Year 20222023-04-0404 April 2023 Annual Radiological Environmental Operating Report for Calendar Year 2022 L-2023-051, Report of 10 CFR 50.59 Plant Changes2023-04-0404 April 2023 Report of 10 CFR 50.59 Plant Changes L-2023-021, Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update2023-03-28028 March 2023 Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update L-2023-042, Periodic Update of Population Data within 10 and 50 Miles of the Plant2023-03-27027 March 2023 Periodic Update of Population Data within 10 and 50 Miles of the Plant L-2023-026, Subsequent License Renewal Application - Aging Management Requests for Additional Information Set 42023-03-27027 March 2023 Subsequent License Renewal Application - Aging Management Requests for Additional Information Set 4 L-2023-028, and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2023-03-27027 March 2023 and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2023-025, Fleet Relief Request (Frr) 23-01, Proposed Alternative to ASME Section XI Authorizing Implementation of ASME Code Case N-752-12023-03-15015 March 2023 Fleet Relief Request (Frr) 23-01, Proposed Alternative to ASME Section XI Authorizing Implementation of ASME Code Case N-752-1 L-2023-029, and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3)2023-03-10010 March 2023 and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2023-039, Cycle 27 Core Operating Limits Report2023-03-0707 March 2023 Cycle 27 Core Operating Limits Report L-2023-032, 2022 Annual Radioactive Effluent Release Report2023-02-28028 February 2023 2022 Annual Radioactive Effluent Release Report L-2023-038, 2022 Annual Operating Report2023-02-28028 February 2023 2022 Annual Operating Report L-2023-016, Radiological Emergency Plan - Revision 74 Report of Changes to Emergency Plan2023-02-15015 February 2023 Radiological Emergency Plan - Revision 74 Report of Changes to Emergency Plan L-2023-019, Annual Summary of Commitment Changes Implemented Without Prior NRC Notification for Calendar Year 20222023-02-15015 February 2023 Annual Summary of Commitment Changes Implemented Without Prior NRC Notification for Calendar Year 2022 L-2023-009, Owner'S Activity Report2023-01-31031 January 2023 Owner'S Activity Report L-2022-188, Unusual or Important Environmental Event - Turtle Mortality2022-12-19019 December 2022 Unusual or Important Environmental Event - Turtle Mortality L-2022-185, Turkey Points, Units 3 & 4; Seabrook Station; and Point Beach, Units 1 and 2 - Supplement to License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22022-12-0909 December 2022 Turkey Points, Units 3 & 4; Seabrook Station; and Point Beach, Units 1 and 2 - Supplement to License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2022-175, Application to Adopt 10 CPR 50.69, 'Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2022-12-0202 December 2022 Application to Adopt 10 CPR 50.69, 'Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2022-180, CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2022-11-0909 November 2022 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums L-2022-165, Subsequent License Renewal Application - Aging Management Request for Additional Information (RAI) 4.3.1-1a(second Round) - Class 1 Fatigue Response2022-10-26026 October 2022 Subsequent License Renewal Application - Aging Management Request for Additional Information (RAI) 4.3.1-1a(second Round) - Class 1 Fatigue Response L-2022-160, Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22022-10-0404 October 2022 Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 2024-01-08
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARL-2023-168, License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 52023-12-12012 December 2023 License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 5 ML23275A1142023-10-0202 October 2023 Improved Technical Specifications Conversion, Chapter 2.0, Safety Limits, Revision 1 - Volume 4 L-2023-126, Enclosure 1: Contents of Improved Technical Specifications (ITS) Submittal2023-10-0202 October 2023 Enclosure 1: Contents of Improved Technical Specifications (ITS) Submittal ML23275A1262023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 5.0, Administrative Controls, Revision 2 - Volume 16 ML23275A1252023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 4.0, Design Features, Revision 2 - Volume 15 ML23275A1242023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.9, Refueling Operations, Revision 2 - Volume 14 ML23275A1232023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.8, Electrical Systems, Revision 2 - Volume 13 ML23275A1222023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.7, Plant Systems, Revision 2 - Volume 12 ML23275A1212023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.6, Containment Systems, Revision 2 - Volume 11 ML23275A1192023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.4, Reactor Coolant System, Revision 2 - Volume 9 ML23275A1202023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.5, Emergency Core Cooling Systems, Revision 2 - Volume 10 ML23275A1182023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.3, Instrumentation, Revision 2 - Volume 8 ML23275A1162023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.1, Reactivity Control Systems, Revision 2 - Volume 6 ML23275A1172023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.2, Power Distribution Limits, Revision 2 - Volume 7 ML23275A1152023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.0, LCO and SR Applicability, Revision 2 - Volume 5 ML23275A1102023-10-0202 October 2023 License Amendment Request Revision 2 for the Technical Specifications Conversion to NUREG-1432, Revision 5 ML23275A1112023-10-0202 October 2023 Improved Technical Specifications (ITS) Revision 2 Submittal Volumes 1 Through 16 ML23275A1122023-10-0202 October 2023 Improved Technical Specifications Conversion License Amendment Request Self-Identified Administrative Changes - Volume 2 L-2023-082, Subsequent License Renewal Application Revision 1, Supplement 52023-06-14014 June 2023 Subsequent License Renewal Application Revision 1, Supplement 5 L-2022-175, Application to Adopt 10 CPR 50.69, 'Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2022-12-0202 December 2022 Application to Adopt 10 CPR 50.69, 'Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2022-160, Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22022-10-0404 October 2022 Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2022-154, Subsequent License Renewal Application Revision 1, Supplement 42022-09-22022 September 2022 Subsequent License Renewal Application Revision 1, Supplement 4 L-2022-046, Subsequent License Renewal Application Revision - Documents WCAP-18623-P/NP Revision 1 Submittal2022-04-13013 April 2022 Subsequent License Renewal Application Revision - Documents WCAP-18623-P/NP Revision 1 Submittal L-2022-043, Subsequent License Renewal Application Revision 1 - Supplement 12022-04-0707 April 2022 Subsequent License Renewal Application Revision 1 - Supplement 1 ML22010A0962022-01-0505 January 2022 Trp 010 St Lucie SLRA - Boricacidcorrbreakoutq - Makar ML21285A1072021-10-12012 October 2021 Subsequent Licensee Renewal Application, Revision 1 ML21285A1082021-10-12012 October 2021 Enclosure 1: St. Lucie Nuclear Plant, Units 1 and 2, Subsequent Licensee Renewal Application, Revision 1 ML21285A1112021-10-12012 October 2021 Subsequent Licensee Renewal Application, Revision 1, Appendix E, Applicant'S Environmental Report L-2021-192, Subsequent Licensee Renewal Application, Revision 1, Appendix E, Applicant'S Environmental Report2021-10-12012 October 2021 Subsequent Licensee Renewal Application, Revision 1, Appendix E, Applicant'S Environmental Report L-2021-142, Westinghouse Report LTR-REA-21-1-NP, Revision 1, St. Lucie Nuclear Plant, Units 1 and 2, Subsequent License Renewal: Unit 1 Reactor Vessel, Vessel Support, and Bioshield Concrete Exposure Data, May 26, 20212021-08-0303 August 2021 Westinghouse Report LTR-REA-21-1-NP, Revision 1, St. Lucie Nuclear Plant, Units 1 and 2, Subsequent License Renewal: Unit 1 Reactor Vessel, Vessel Support, and Bioshield Concrete Exposure Data, May 26, 2021 ML21215A3152021-08-0303 August 2021 Application for Subsequent Renewed Facility Operating Licenses ML21215A3162021-08-0303 August 2021 Enclosure 1: Subsequent License Renewal Application Enclosures Summary ML21215A3192021-08-0303 August 2021 Appendix E - Applicant'S Environmental Report for St. Lucie L-2021-192, Westinghouse, Report LTR-REA-21-1-NP, Revision 1, St. Lucie Units 1 & 2 Subsequent License Renewal: Unit 1 Reactor Vessel, Vessel Support, and Bioshield Concrete Exposure Data, May 26, 20212021-05-26026 May 2021 Westinghouse, Report LTR-REA-21-1-NP, Revision 1, St. Lucie Units 1 & 2 Subsequent License Renewal: Unit 1 Reactor Vessel, Vessel Support, and Bioshield Concrete Exposure Data, May 26, 2021 L-2020-164, License Amendment to Allow Risk Informed Completion Times (RICT) for the 120-Volt AC Instrument Bus Requirements2020-12-21021 December 2020 License Amendment to Allow Risk Informed Completion Times (RICT) for the 120-Volt AC Instrument Bus Requirements L-2020-020, License Amendment Request for RCS Pressure/ Temperature Limits and LTOP Applicable for 55 Effective Full Power Years2020-02-18018 February 2020 License Amendment Request for RCS Pressure/ Temperature Limits and LTOP Applicable for 55 Effective Full Power Years L-2019-091, License Amendment Request to Modify the Reactor Coolant Pump (RCP) Flywheel Inspection Program Requirements2019-10-0909 October 2019 License Amendment Request to Modify the Reactor Coolant Pump (RCP) Flywheel Inspection Program Requirements L-2019-147, Exigent Technical Specification Amendment Request One-Time Allowed Outage Time Extension for Inoperable EDG2019-07-19019 July 2019 Exigent Technical Specification Amendment Request One-Time Allowed Outage Time Extension for Inoperable EDG L-2018-161, License Amendment Request to Allow Performance of Selected Emergency Diesel Generator (EDG) Surveillance Requirements (Srs) During Power Operation2018-12-20020 December 2018 License Amendment Request to Allow Performance of Selected Emergency Diesel Generator (EDG) Surveillance Requirements (Srs) During Power Operation L-2018-182, License Amendment Request Iodine Removal System Elimination2018-11-0909 November 2018 License Amendment Request Iodine Removal System Elimination L-2018-201, Fourth Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2018-11-0909 November 2018 Fourth Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b L-2018-147, Submittal of License Amendment Request to Remove the Site Area Map from Technical Specifications2018-08-0202 August 2018 Submittal of License Amendment Request to Remove the Site Area Map from Technical Specifications L-2018-121, License Amendment Request to Reduce the Number of Control Element Assemblies2018-06-29029 June 2018 License Amendment Request to Reduce the Number of Control Element Assemblies L-2018-120, License Amendment Request to Remove the Site Area Map from the Technical Specifications2018-06-25025 June 2018 License Amendment Request to Remove the Site Area Map from the Technical Specifications L-2018-111, Second Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2018-06-0707 June 2018 Second Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b L-2018-049, Application to Add Limiting Condition for Operation (LCO) 3.0.6 to the Technical Specifications2018-05-29029 May 2018 Application to Add Limiting Condition for Operation (LCO) 3.0.6 to the Technical Specifications L-2018-031, License Amendment Request Focused Adoption of NEI 99-01. Revision 6 Unusual Event Fire-Related Emergency Action Level Scheme2018-01-31031 January 2018 License Amendment Request Focused Adoption of NEI 99-01. Revision 6 Unusual Event Fire-Related Emergency Action Level Scheme L-2017-155, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors2017-12-19019 December 2017 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors L-2017-139, License Amendment Request to Add New Required Actions for an Inoperable Auxiliary Feedwater Pump Steam Supply2017-09-14014 September 2017 License Amendment Request to Add New Required Actions for an Inoperable Auxiliary Feedwater Pump Steam Supply 2023-06-14
[Table view] |
Text
JUN O7 2018 L-2018-111 10 CFR 50.90 Attn: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 St. Lucie Nuclear Plant, Units 1 and 2 Docket Nos. 50-335 and 50-389
Subject:
Second Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 1, "Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b"
References:
- 1. Florida Power & Light Company letter L-2014-242, "Application to Adopt TSTF-505, Revision 1, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B,"
December 5, 2014 (ML14353A016)
- 2. NRC E-mail "Request for Additional Information - St. Lucie TSTF-505 EICB - MF5372 &
MF 5373," March 28, 2016 (ML16089A006)
- 3. NRC E-mail "Request for Additional Information - St. Lucie TSTF-505 APLA - MF5372 &
MF5373," April 13, 2016 (ML16105A456)
- 4. NRC E-mail "Request for Additional Information - St. Lucie TSTF 505 APLA - MF5372 &
MF5373," May 27, 2016 (ML16152A187)
- 5. Florida Power & Light Company letter L-2016-114, "Response to Request for Additional Information Regarding License Amendment Request to Adopt TSTF-505, 'Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B'," July 8, 2016 (ML16193A659)
- 6. Florida Power & Light Company letter L-2016-135, "Second Response to Request for Additional Information Regarding License Amendment Request to Adopt TSTF-505,
'Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B'," July 22, 2016 (ML16208A061)
- 7. Florida Power & Light Company letter L-2017-007 "Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 1, 'Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b'," Febmary 25, 2017 (ML17058A181)
- 8. NRC E-mail "Request for Additional Information - St. Lucie RICT LAR - MF5372/5363,"
October 4, 2017 (ML17277A369)
- 9. NRC E-mail "Request for Additional Information - St. Lucie RICT LAR I&C- (CACs MF5372/MF5375 EPID L-2014-LLA-0001)," February 1, 2018 (ML18033A014)
Florida Power & Light Company 6501 S. Ocean Drive, Jensen Beach, FL 34957
L-2018-111 Page 2
- 10. Florida Power & Light Company letter 2017-006, Third Response to Request for Additional Information Regarding License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b, February 1, 2018 (ML18032A614)
- 11. Florida Power & Light Company letter L-2018-058, Fourth Response to Request for Additional Information Regarding License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b, March 15, 2018 (ML18074A116)
In Reference 1, as supplemented by References 5, 6, 7, 10, and 11, Florida Power & Light Company (FPL) submitted a license amendment request (LAR) for St. Lucie Units 1 and 2. The proposed amendment would revise the Technical Specifications (TS) to implement TSTF-505, Revision 1, Provide Risk-Informed Extended Completion Times RITSTF [Risk Informed TSTF] Initiative 4b.
The review of the LAR found one instance regarding an instrument function for Unit 2 in which the proposed change added a risk-informed completion time to a condition involving a loss of function.
Specifically, the loss of voltage function in TS Table 3.3-3, Engineered Safety Features Actuation System Instrumentation, (Functional Unit 6.a(1), 4.16 kV Emergency Bus Undervoltage) consists of two channels per bus and requires two operable channels per bus to trip. The current TS action requires restoring an inoperable channel within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or placing the channel in the tripped condition, and the LAR proposed adding a risk-informed completion time to this action. However, the condition that less than two channels are operable results in the inability to initiate the loss of voltage trip function. Therefore, this supplement removes the proposed change that added a risk-informed completion time to the action for Functional Unit 6.a(1), 4.16 kV Emergency Bus Undervoltage, in TS Table 3.3-3. to this letter contains a markup of the TS for Unit 2, which removes the proposed change. The TS markup supersedes the corresponding markup provided in Reference 7.
This supplement also provides additional information regarding procedures that were mentioned in the letter in Reference 11. Attachment 2 to this letter provides a description of the referenced procedures.
This supplement does not alter the conclusions in Reference 1 that the changes do not involve a significant hazards consideration pursuant to 10 CFR 50.92, and there are no significant environmental impacts associated with the changes.
No new or revised commitments are included in this letter
L-2018-111 Page 3 Should you have any questions regarding this submittal, please contact Mr. Mike Snyder, Licensing Manager, at (772) 467-7036.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on JUN O7 2018 Sincerely, Daniel DeBoer Site Director Florida Power & Light Company Attachments cc: NRC Regional Administrator, Region II NRC Senior Resident Inspector NRC Project Manager Ms. Cindy Becker, Florida Department of Health
L-2018-111 Attachment 1 Page 1 of 4 Attachment 1 Markup of the Technical Specifications for St. Lucie Unit 2
L-2018-111 Attachment Page 2 of4 TABLE 3.3-3 (Continued)
ENGINEERED SAFETY FEATURES ACTUATION SYSTEM INSTRUMENTATION MINIMUM TOTAL NO. CHANNELS CHANNELS APPLICABLE FUNCTIONAL UNIT OF CHANNELS TO TRIP OPERABLE MODES ACTION
- 6. LOSS OF POWER (LOV)
- a. (1) 4.16 kV Emergency Bus v~
Undervoltage (Loss of Voltage) 2/Bus 2/Bus 1/Bus 1, 2, 3 17~
(2) 480 V Emergency Bus 3/Bus 2/Bus 2/Bus 1, 2, 3 Undervoltage (Loss of Voltage) 17,
- b. (1) 4.16 kV Emergency Bus "
~
3/Bus 2/Bus 2/Bus 1, 2, 3 17 ..,:::_
Undervoltage (Degraded Voltage)
(2) 480 V Emergency Bus 1, 2, 3 11Y 3/Bus 2/Bus 2/Bus Undervoltage (Degraded Voltage)
- 7. AUXILIARY FEEDWATER (AFAS)
- a. Manual (Trip Buttons) 4/SG 2/SG 4/SG 1, 2, 3 15
- b. Automatic Actuation Logic 4/SG 2/SG 3/SG 1, 2, 3 15
- c. SG Level (2A/2B) - Low 4/SG 2/SG 3/SG 1, 2, 3 20a,20b,~ t kt. ~
- 8. AUXILIARY FEEDWATER ISOLATION
- a. SG 2A - SG 28 Differential Pressure 4/SG 2/SG 3/SG 1, 2, 3 20a, 20b, 2:9-e/ r
- b. Feedwater Header 2A - 28 4/SG 2/SG 3/SG 1,2,3 20a,2:Be
!?- }
Differential Pressure ST. LUCIE - UNIT 2 3/4 3-14 Amendment No.~. B, ~ . 4-+-G
L-2018-111 Attachment Page 3 of4 TABLE 3.3-3 (Continued)
TABLE NOTATION ACTION 14 - With the number of channels OPERABLE one less than the Minimum Channels OPERABLE, STARTUP and/or POWER OPERATION may continue provided the following conditions are satisfied:
- a. Verify that one of the inoperable channels has been bypassed and place the other inoperable channel in the tripped condition within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.
- b. All functional units affected by the bypassed/tripped channel shall also be placed in the bypassed/tripped condition as listed below.
Process Measurement Circuit Functional Unit Bypassed/Tripped
- 1. Containment Pressure - Containment Pressure - High (SIAS, CIAS, CSAS)
Containment Pressure - High (RPS)
- 2. Steam Generator Pressure - Steam Generator Pressure - Low (MSIS)
AFAS-1 and AFAS-2 (AFAS)
Thermal Margin/Low Pressure (RPS)
Steam Generator Pressure - Low (RPS)
- 3. Steam Generator Level - Steam Generator Level - Low (RPS)
If SG-2A, then AFAS-1 (AFAS)
If SG-2B, then AFAS-2 (AFAS)
- 4. Pressurizer Pressure - Pressurizer Pressure - High (RPS)
Pressurizer Pressure - Low (SIAS)
INSERT 1 Thermal Margin/Low Pressure (RPS)
ACTION 15 - With the number of O ERABLE channels one less than the Total Number of Channels store the inoperable channels to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />. LCO 3.0.4.a is not applicable when entering HOT SHUTDOWN.
ACTION 16 - With the number of OPERABLE channels one less than the Total Number of Channels, restore the inoperable channel to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or declare the associated valve inoperable and take the ACTION required by Specification 3.7.1.5.
AC~IOrr- With the number of OPERABLE Channels one less than the Total Number of Channels, restore the inoperable channel to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or place the inoperable channel in the 17A tripped condition and verify that the Minimum Channels OPERABLE requirement is demonstrated within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />; one additional channel INSERT ACTION 178 may be bypassed for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for surveillance testing per Specification 4.3.2.1.
ST. LUCIE - UNIT 2 3/4 3-16 Amendment No. ~. ~. 4-84
L-2018-111 Attachment 1 Page 4 of 4 INSERT ACTION 17B ACTION 17B With the number of OPERABLE Channels one less than the Total Number of Channels, restore the inoperable channel to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or in accordance with the Risk Informed Completion T ime Program, or place the inoperable channel in the tripped condition and verify that the Minimum Channels OPERABLE requirement is demonstrated within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />; one additional channel may be bypassed for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for surveillance testing per Specification 4.3.2.1.
L-2018-111 Attachment 2 Page 1 of 1 Attachment 2 Description of Procedures The March 15, 2018 response to the request for additional information (Reference 11 in the cover letter) included a table that provided examples of risk management actions for certain Actions in Technical Specification (TS) 3.8.1.1, A. C. Sources - Operating, for Units 1 and 2. Below is a description of the procedures that were included in the table of risk management actions (RMAs).
1(2)-OSP-100.01, Unit 1 (Unit 2) Schedule of Periodic These are Operations procedures that provide instructions for performing TS Tests, Checks and Calibrations Week 1 surveillance requirements (SRs). When AC sources are inoperable, several Actions in TS 3.8.1.1 require performing SR 4.8.1.1.1.a to demonstrate operability of the offsite 1(2)-OSP-100.13, Unit 1 (Unit 2) Schedule of Periodic AC sources.
Tests, Checks and Calibrations Week 13 The table of RMAs referenced these Operations procedures because they provide instructions for performing SR 4.8.1.1.1.a.
OP-AA-102-1003, Guarded Equipment This fleet procedure provides detailed instructions for guarding essential plant equipment that must remain available as determined by the Shift Manager. The procedure provides guidance for guarding operable TS-required equipment when a redundant train or component is removed from service or when a work activity involves a high risk of affecting equipment in close proximity to the work. Guarding equipment involves protecting the equipment by posting signs, limiting access to the equipment, and controlling work on the equipment.
The table of RMAs referenced this procedure because it provides instructions for guarding TS equipment when redundant equipment is inoperable. For example, when operating in accordance with the Actions of TS 3.8.1.1 with any of the required AC sources inoperable, the procedure would provide instructions for guarding the remaining operable AC sources.
2-OSP-59.01A, 2A Emergency Diesel Generator These procedures provide instructions for performing the monthly SRs on the Monthly Surveillance emergency diesel generators (EDGs). When one EDG is inoperable, the Actions in TS 3.8.1.1 require performing SR 4.8.1.1.2.a.4 to demonstrate operability of the remaining 2-OSP-59.01B, 2B Emergency Diesel Generator EDG. This procedure provides instructions for performing SR 4.8.1.1.2.a.4 Monthly Surveillance