ML18155A250
Jump to navigation
Jump to search
| ML18155A250 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 03/10/1980 |
| From: | Frost S CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | Ziemann D Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8003170343 | |
| Download: ML18155A250 (1) | |
Text
consumers Power company Generel Offices: 212 West Michigan Avenue, Jeckson; Michigan 49201 * (517) 788-0550 March 10, 1980 Director, Nuclear Reactor Regulat~on Att Mr Dennis L Ziemann, Chief**
Operating Reactors Branch No 2
- US Nuclear Regulatory Commission Washington, DC 20555 DOCKET 50-255 - LICENSE DPR PALISADES PLANT - LONG-TERM COOLING EQUIPMENT MODIFICATION BIMONTHLY STATUS REPORT Bechtel Corporation is preparing* final design details for the long-term cooling modifications.
These modifications are still scheduled for the 1981 refueling outage.
This serves as a bimonthly status report for February-March 1980 as required by Technical Specification 6.9.3.3.b.
Steven R Frost Palisades Nuclear Licensing Engineer CC JGKeppler, USNRC p
80081'10 3't~
- 3