VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 July 16, 1993 United States Nuclear Regulatory Commission Serial No.93-420 Attention: Document Control Desk SPS/ETS RO Washington, D. C. 20555 Docket Nos. 50-280 License Nos. DPR-32 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNIT 1 THIRD TEN YEAR INSERVICE INSPECTION PROGRAM In accordance with 10 CFR 50.55a(g), Virginia Electric and Power Company submits the inservice inspection program for the third ten-year inservice inspection interval for Surry Unit 1. The program, included as Attachment 1 to this letter, describes the programmatic aspects of inservice examinations of components and component supports and system pressure tests.

The program has been written in accordance with the requirements of the 1989 Edition of Section XI of the ASME Boiler and Pressure Vessel Code. However, because the unit was not designed to completely meet the detailed inservice inspection requirements of Section XI, we are requesting relief from certain inspection and testing requirements which have been determined to be* impractical. In accordance with 10 CFR 50.55a(g)(5), our requests for specific relief from the Code requirements are included in the enclosed program.

The Surry Unit 1 inservice inspection program plan (as required by IWA-2420) identifying the specific components and component supports selected for examination during the third interval is included as Attachment 2.

The third ten-year inspection interval for Surry Unit 1 begins on October 14, 1993. It is our intent to implement this revised inspection program at that time. To facilitate your review of our program, we will provide one set of reference drawings under separate cover to the NRC Project Manager. We will also provide one copy of the program and one set of drawings to the NRC's reviewers at EG&G in Idaho.

The Surry Unit 1 third interval inservice inspection program and the relief requests contained therein have been reviewed by the Station Nuclear Safety and Operating Committee.

  • i0QQ:G1

?.* t:;. *-*, v Af)ih

'(\V I

J

If you have questions regarding this information, please contact us.

Very truly yours, C).PCW~

~r W. L. Stewart Senior Vice President - Nuclear Attachments

1. Unit 1 lnservice Inspection Program
2. Unit 1 lnservice Inspection Program Plan cc: (w/Attachment 1 only)

U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, N. W.

Suite 2900 Atlanta, Georgia 30323 Mr. M. W. Branch NRC Senior Resident Inspector Surry Power Station