ML18153D212
| ML18153D212 | |
| Person / Time | |
|---|---|
| Site: | Surry |
| Issue date: | 01/14/1993 |
| From: | Stewart W VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML18153D213 | List: |
| References | |
| 87-09, 87-9, 92-572B, NUDOCS 9301190165 | |
| Download: ML18153D212 (3) | |
Text
,...
e e
VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 January 14, 1993 United States Nuclear Regulatory Commission Attention: Document Control Desk Washington, D. C. 20555 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 PROPOSED TECHNICAL SPECIFICATION CHANGE 3.0/4.0 LCO AND SURVEILLANCE REQUIREMENTS Serial No.
91-5728 NURPC Docket Nos. 50-280 50-281 License Nos. DPR-32 DPR-37 In a letter (Serial No. 91-572A) dated_,August 4, 1992, Virginia Electric and Power Company requested an amendment, in the form of changes to the Technical Specifications, to Operating License Nos. DPR-32 and DPR-37 for Surry Power Station Units 1 and 2. The proposed Technical Specification change was submitted in order to upgrade portions of Sections 3.0 and 4.0 of the Surry Power Station Technical Specifications pursuant to Generic Letter 87-09.
That submittal was based on our understanding that the 3.0 and 4.0 provisions of GL 87-09 recommended for Standard Technical Specifications were linked together and application of the surveillance provisions would require application of the Limiting Conditions for Operation (LCO) provisions. As discussed in a December 30, 1992 telephone conversation between our staffs, a combined approach is not required for the customized Surry Power Station Technical Specifications. Therefore, we withdraw the 3.0 portion of our August 4, 1992 submittal. Attachment 1 identifies the remaining proposed changes pertaining to surveillance requirements.
Our determination that this change does not involve an unreviewed safety question as defined in 1 O CFR 50.59, nor a significant hazards consideration according to 1 O CFR 50.92, remains valid and encompasses this modification to our request. Should you have any questions, please contact us.
Very truly yours,
~L~
W. L. Stewart Senior Vice President - Nuclear Attachment
- 1. Proposed Technical Specification Changes
- 1. ~1 p-~'---9aoi19<:f16-5 ~ 93ofi,f-------.,
PDR ADOCK 05000280
~\\II p
( (
I cc:
U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, N. W.
Suite 2900 Atlanta, Georgia 30323 Mr. M. W. Branch NRC Senior Resident Inspector Surry Power Station Commissioner Department of Health Room 400 1 09 Governor Street Richmond, Virginia 23219
i--
'I
- ,,,J COMMONWEAL TH OF VIRGINIA )
)
COUNTY OF HENRICO
)
The foregoing document was acknowledged before me, in and for the County and Commonwealth aforesaid, today by W. L. Stewart who is Senior Vice President -
Nuclear, of Virginia Electric and Power Company. He is duly authorized to execute and file the foregoing document in behalf of that Company, and the statements in the document are true to the best of his knowledge and belief.
Acknowledged before me this _i!l_ day of ~~
- 19!l3._.
My Commission Expires: (_~ 3/
. 19:i!/_.
(SEAL)_:. -