ML18153D124

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-280/92-17 & 50-281/92-17.No Violations Noted
ML18153D124
Person / Time
Site: Surry  Dominion icon.png
Issue date: 09/04/1992
From: Sinkule M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
Shared Package
ML18153D125 List:
References
NUDOCS 9209220060
Download: ML18153D124 (3)


See also: IR 05000280/1992017

Text

SEP O 41992

Docket Nos. 50-280, 50-281

License Nos. DRP-32, DRP-37

Virginia Electric and Power Company

ATTN: Mr. W. L. Stewart

Senior Vice President - Nuclear

5000 Dominion Boulevard

Glen Allen, VA

23060

Gentlemen:

SUBJECT:

NRC INSPECTION REPORT NOS. 50-280/92-17 AND 50-281/92-17

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

Mr. M. Branch of this office on July 5 through August 8, 1992.

The inspection

included a review of activities authorized for your Surry facility. At the

conclusion of the inspection, the findings were discussed with those members

of your staff identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of

activities in progress.

During the inspection period you identified that low-head safety injection

system piping in both units contained gas voids.

The enclosed report

describes the short-term corrective actions you have taken in response to this

issue.

We have reviewed these actions, which primarily involve frequent

venting of the affected piping, and find them to be adequate.

Due to the

potential system degradation from these gas voids, we are particularly

interested in the timely development of long-term corrective actions, which

will prevent the intrusion of gas voids into this system.

Thus, you are

requested to provide to the NRC in writing, within 30 days of the date of this

letter, your proposed long-term corrective actions.

Within the scope of the inspection, violations or deviations were not

identified.

Pursuant to 10 CFR 2.790 of the NRC's "Rules of Practice", a copy of this

letter and its enclosure will be placed in the NRC Public Document Room .

92Q9~0060 920904

--

PD~ADOCK 05000280

O

PDR

Virginia Electric & Power

Company

2

SEP O 41992

Should you have any questions concerning this letter, please contact us.

Enclosure:

NRC Inspection Report

cc w/encl:

M. L. Bowling, Jr., Manager

Nuclear Licensing

Virginia Electric & Power Company

5000 Dominion Boulevard

Glen Allen, VA

23060

M. R. Kansler

Station Manager

Surry Power Station

P. 0. Box 315

Surry, VA

23883

Sherlock Holmes, Chairman

Surry County Courthouse

Surry, VA

23683

Dr. W. T. Lough

Division of Energy Regulation

P. 0. Box 1197

Richmond, VA

23209

Michael W. Maupin

Hunton and Williams

P. 0. Box 1535

Richmond, VA

23212

C. M. G. Buttery, M.D., M.P.H.

Virginia Department of Health

P. 0. Box 2448

Richmond, VA

23218

Attorney General

101 North 8th Street

Richmond, VA

23219

bee w/encl:

See page 3

Sincerely,

D~~~~<'fn~~~J

Marvin V. Sinkule, Chief

Reactor Projects Branch 2

Division of Reactor Projects

Virginia Electric & Power

Company

bee w/encl:

P. Fredrickson, RiI

B. Buckley, NRR

Document Control Desk

NRC Resident Inspector

U.S. Nuclear Regulatory Commission

Route 1, Box 166

Surry, VA

23883

NRC Resident Inspector

U.S. Nuclear Regulatory Commission

Route 2, Box 78-A

Mineral, VA

23117

RII :DRP

ARf({-

09/'3 /92

RII :DRP

~/!.~

PFredri ckson

09/ .J /92

SEP O 41992

3