Confirms 920505 Telcon Granting Temporary Waiver of Compliance to Repair CRD for Facility
ML18153D015
Person / Time
Site: Surry 
Issue date: 05/07/1992
From: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
References
NUDOCS 9205270201
Download: ML18153D015 (3)


Text

Docket Nos. 50-280 License Nos. DPR-32 MAYO 71992 Virginia Electric and Power Company ATTN:

Mr. W. L. Stewart Senior Vice President - Nuclear 5000 Dominion Boulevard Glen Allen, VA 23060 Gentlemen:

SUBJECT:

TEMPORARY WAIVER OF COMPLIANCE TO REPAIR CONTROL ROD URGENT FAILURE CIRCUITRY IN THE CONTROL ROD DRIVE SYSTEM FOR SURRY UNIT 1, DOCKET 50-280 This letter confirms the telephone conversation between Mr. J. P. O'Hanlon of your staff and Mr. Luis A. Reyes of my staff on May 5, 1992, granting a Regional Waiver of Compliance for your Surry Nuclear Power Station Facilities.

The waiver was granted to Technical Specification (TS) 3.12.C.3. for one time only to allow repairs to be made to the electrical Rod Urgent Failure Alarm circuitry in the Control Rod Drive System.

The Rod Urgent Failure Alarm indicates a fault in the Control Rod Drive System which renders a group or bank of control rod assemblies inoperable due to the inability to move the control rod assemblies on demand by the Control Rod Drive System.

The granting of this waiver was based on the discussion of the technical issues with your staff and the fact that the individual rod and group rod position indicators were reading within the TS requirements, all rods were trippable and capable of performing their intended safety function.

This one time waiver extended the TS time requirement in 3.12.C.3 from 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> to 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> to allow repairs to be made to the applicable electrical circuitry.

I understand that the repairs, which were started at 5:50 p.m. on May 5, 1992, are complete and the TS Action Statement was exited on May 6, 1992 at 11:21 a.m.

The technical issues and your justification for the waiver are documented in your followup letter (Seri~l No.92-322) dated May 6, 1992, which was received by electronic transmission on May 6, 1992.

Prior to granting this Temporary Waiver of Compliance, the technical issues, as indicated above, and the extent of the waiver were reviewed.

They were 9205270201 920507 PDR ADOCK 05000280 p

PDR

\\

IEol

Virginia Electric & Power Company 2

~AY 071992 discussed by telephone with L. Reyes, A. Gibson, M. Sinkule, and J. York of Region II; G. Lainas, H. Berkow, and B. Buckley of NRR; and J. O'Hanlon, M. Kansler, A. Price and D. Sommers of Virginia Electric and Power Company.

Enclosure:

Virginia Electric & Power Company ltr (Serial No.92-322) dtd May 6, 1992 cc w/encl:

E. W. Harrell Vice President - Nuclear Services Virginia Electric & Power Company 5000 Dominion Boulevard Glen Allen, VA 23060 J. P. O'Hanlon Vice President - Nuclear Operations Virginia Electric & Power Company 5000 Dominion Boulevard Glen Allen, VA 23060 M. R. Kans le r Station Manager Surry Power Station P. 0. Box 315 Surry, VA 23883 M. L. Bowling, Jr., Manager Nuclear Licensing Virginia Electric & Power Co.

5000 Dominion Boulevard Glen Allen, VA 23060 Sherlock Holmes, Chairman Sincerely, Original signed by James L. Milhoan (for)

Stewart D. Ebneter Regional Administrator Board of Supervisors of Surry County Surry County Courthouse Surry, VA 23683 cc w/encl cont'd: See page 3

Virginia Electric & Power Company 3

cc w/encl cont 1 d:

Dr. W. T. Lough Virginia State Corporation Commission Division of Energy Regulation P. 0. Box 1197 Richmond, VA 23209 Michael W. Maupin Hunton and Williams P. 0. Box 1535 Richmond, VA 23212 C. M. G. Buttery, M.D., M.P.H.

State Health Commissioner Office of the Commissioner Virginia Department of Health P. 0. Box 2448 Richmond, VA 23218 Attorney General Supreme Court Building 101 North 8th Street Richmond, VA 23219 bee w/encl:

J. Johnson, RI I P. Fredrickson, RII B. Buckley, NRR T. Murley, NRR S. Varga, NRR G. Jenkins, RII J. Wechselberger, NRR J. Partlow, NRR Document Control Desk NRC Resident Inspector U.S. Nuclear Regulatory Commission Route 1, Box 166 Surry, VA 23883 NRC Resident Inspector U.S. Nuclear Regulatory Commission Route 2, Box 78-A Mineral, VA 23117 RII:DRP RII:DRP RII:DRP, P~cf?iison I;.',

AR{ft MSi Wu1 e 05/ /92 05/ v /92 05/v; /92

'AY 071992

~

JM?oan 05

/92 RII{~

(_

CEv ns 05/7 /92


,