Advises That Upgrade to Emergency Telecommunications Sys, Per Generic Ltr 91-14 Will Be Completed by 920508. Implementation Schedule Listed on Encl
ML18153C982
Person / Time
Site: Surry  
Issue date: 04/23/1992
From: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
91-621, GL-91-14, NUDOCS 9204280032
Download: ML18153C982 (3)


Text

e VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 April 23, 1992 United States Nuclear Regulatory Commission Attention: Document Control Desk Washington, D. C. 20555 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 IMPLEMENTATION DATE FOR PROVISIONS OF GENERIC LETTER 91-14 EM ERG ENCY TELECOMMUNICATIONS Serial No.91-621 NEP/WFR/acm R1 Docket Nos.

50-280 50-281 License Nos.

DPR-32 DPR-37 In NRC Generic Letter (GL) 91-14 issued September 23, 1991, Enclosure 2, Licensee Support for Upgrade to the Emergency Telecommuncations System, described the licensee efforts that may be required, and the various factors which affect the required work concerning the installation and use of the Federal Telecommunications System (FTS) 2000 network for emergency telecommunications. The Generic Letter further stated it is expected that licensees would complete the remaining installation effort as identified in Enclosure 2 within ninety days. It is our understanding that the ninety day schedule would be initiated upon receipt of the FTS 2000 service.

Virginia Electric and Power Company will complete the actions pertaining to the installation effort at Surry Power Station by May 8, 1992. Attachment 1 provides a detailed schedule of actions that have been, or will be, taken in order to comply with GL 91-14. Discussions with the Technical Contacts noted in GL 91-14 were helpful in determining the schedule provided in Attachment 1.

Should you have any questions, please contact us.

Very truly yours, Q.Y.Oll~

p;,r W. L. Stewart Senior Vice President - Nuclear Attachment cc:

U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, N. W.

Suite 2900 Atlanta, Georgia 30323 Mr. M. W. Branch NRC Senior Resident Inspector

, r, ~LJJ!Y_E_9we_r:__ Stati~_!!__

~ r 92042aoo32 920423~-~-

PDR ADOCK 05000280 F

PDR

/JOO!

'I t1

e ATTACHMENT 1 GENERIC LETTER 91-14 EMERGENCY TELECOMMUNICATIONS SURRY POWER STATION IMPLEMENTATION SCHEDULE

~

GENERIC LETTER 91-14 EMERGENCY TELECOMMUNICATIONS SURRY POWER STATION IMPLEMENTATION* SCHEDULE TASK COMPLETED Receipt of Service*

Receipt of Instruments Conference Call with NRC Technical Contact Drafting of FTS 2000 Test Procedures Prepared to Initiate 30-Day Testing Period SCHEDULED DATE 1-22-92 4-1-92 4-13-92 5-8-92 5-8-92

  • This is the date that the local telephone carrier began installation of FTS 2000 service and serves as the start date for the ninety day period indicated on page 2 of Generic Letter 91-14.