Text
I.
September 20, 1991
Docket Nos. 50-280, 50-281
Virginia Electric and Power Company
ATTN:
Mr. W. L. Stewart
Senior Vice President - Nuclear
5000 Dominion Boulevard
Glen Allen, VA
23060
Gentlemen:
SUBJECT:
(NRC INSPECTION REPORT NOS. 50-280/91-20 AND 50-281/91-20}
This refers to the inspection conducted by P. T. Burnett of this office on
July 8-12, 1991.
The inspection included a review of activities authorized for
your Surry facility.
At the conclusion of the inspection, the findings were
discussed with those members of your staff identified in the report .
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
Based on the results of this inspection, certain of your activities appeared to be
in violation of NRC requirements, as specified in the enclosed Notice of
Violation.
We are concerned about the violation because the interval between
determinations of continued core operability was excessive.
You are required to respond to this letter and should follow the instructions
specified in the enclosed Notice when preparing your response.
In your response,
you should document the specific actions taken and any additional actions you plan
to prevent recurrence. After reviewing your response to this Notice, including
your proposed corrective actions and the results of future inspections, the NRC
will determine whether further NRC enforcement action is necessary to ensure
compliance with NRC regulatory requirements.
In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this
letter and its enclosures will be placed in the NRC Public Document Room.
111oosooa9 910920
GDR
AD0CK 05000280
Virginia Electric and Power Company
2
September 20, 1991
Should you have any questions concerning this letter, please contact us.
Enclosures:
2.
NRC Inspection Report
cc w/encls:
E. W. Harrell
Vice President - Nuclear Operations
Virginia Electric & Power Company
5000 Dominion Boulevard
Glen Allen, VA
23060
J. P. O'Hanlon
Vice President - Nuclear Services
Virginia Electric & Power Company
5000 Dominion Boulevard
Glen Allen, VA
23060
M. R. Kansler
Station Manager
Surry Power Station
P. 0. Box 315
Surry, VA
23883
M. L. Bowling, Jr., Manager
Nuclear Licensing
Virginia Electric & Power Co.
5000 Dominion Boulevard
Glen Allen, VA
23060
Sherlock Holmes, Chairman
Board of Supervisors of Surry County
Surry County Courthouse
Surry, VA
23683
(cc w/encls cont'd - see page 2)
Sincerely,
(ORIGINAL SIGNED BY T. A. PEEBLES)
Thomas A. Peebles, Chief
Operations Branch
Division of Reactor Safety
Virginia Electric and Power Company
(cc w/encls cont'd)
Dr. W. T. Lough
Virginia State Corporation
Commission
Division of Energy Regulation
P. 0. Box 1197
Richmond, VA
23209
Michael W. Maupin
Hunton and Williams
P. 0. Box 1535
Richmond, VA
23212
C. M. G. Buttery, M.D., M.P.H.
State Health Commissioner
Office of the Commissioner
P. 0. Box 2448
Richmond, VA
23218
Attorney General
Supreme Court Building
101 North 8th Street
Richmond, VA
23219
Commonwealth of Virginia
b~/encls:
'Vf)ocument Control Desk
P. Fredrickson, RII
B. Buckley, NRR
NRC Resident Inspector
U.S. Nuclear Regulatory Commission
Route 1, Box 166
Surry, VA
23883
NRC Resident Inspector
U.S. Nuclear Regulatory Commission
Route 2, Box 78-A
Mineral, VA
23117
3
- FOR PREVIOUS CONCURRENCE SEE ATTACHED COPY
RII: DRS
- P~
09_a)/91
RII: DRS
iw-*Rdfitnjak
\\ 09/ /91
RI~
PF~e/l.ickson
09yv /91
September 20, 1991
RII
1:,,D~
ifeltkes
09/:2.0/91