Informs That Changes to Operational QA Program Consistent W/Provisions in 10CFR50,App B & Acceptable
ML18153C720
Person / Time
Site: Surry, North Anna  Dominion icon.png
Issue date: 08/27/1991
From: Gibson A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
References
NUDOCS 9109100309
Download: ML18153C720 (4)


Text

i.

e Docket Nos. 50-280, 50-281 50-338, 50-339 License Nos. DPR-32, DPR-37 NPF-4, NPF-7 August 27, 1991 Virginia Electric and Power Company ATTN:

Mr. W. L. Stewart

  • Senior Vice President - Nuclear 5000 Dominion Boulevard Glen Allen, VA. 23060 Gentlemen:

SUBJECT:

ACCEPTANCE OF CHANGES TO THE OPERATIONAL QUALITY ASSURANCE PROGRAM (VEP-1-5A FOR SURRY UNITS 1 AND 2 AND NORTH ANNA UNITS 1 AND 2)

Thank you for your letter dated June 20, 1991 notifying us of changes to your Operational Quality Assurance Program in accordance with 10 CFR 50.54 (e). The proposed change to Section 17.2.0 of your plan would replace the commitment to review procedures on a two year cycle as stated in ANSI Standard N18.7-1976 with a commitment to review procedures on a fl ex i b 1 e schedule not to exceed four years.

We have reviewed this change.and agree that it provides an acceptable alt~rnative

  • and that your program will continue to meet th*e requirements o~ 10* CFR 50 Appendix B.

This proposed change was discussed with Ms. Julie Reynolds of yo*ur staff on August 12~ 1991.

Based on that discussion, we understand that your administra-tive controls for plant procedures contain elements for a review when a pro-cedure fs affected by other changes in the plant.

The controls which apply to

  • changes in vendor manuals, Technical Spec_ification amendments, the design change process, and the events reporting system, all contain elements to ensure that affected procedures are reviewed.

In addition, you have committed to institute a sampling of procedures for added assurance of timely revision of procedures.

With the above sampling provision and the maximum cycle of four years, we believe that the change is an acceptable alternative commitment and that your program as rev.ised will *continue to meet the requirements of 10 CFR Part 50, Appendix B.

7'109100309 910827 PDR ADOCK 05000280 P

PDR

Virginia Electric and Power Co.

2 August 27, 1991 We appreciate your timely submittal of information as required by 10 CFR 50.54 (a). Please contact Mr. Frank Jape of my staff if you have any questions regarding this matter.

cc w/encl:

E. W. Harrell Vice President - Nuclear Operations Virginia Electric & Power Company 5000 Dominion Boulevard Glen Allen, VA 23060 J. P. O'Hanlon Vice President - Nuclear Services Virginia Electric & Power Company 5000 Dominion Boulevard Glen Allen, VA 23060 M. R. Kansler Station Manager Surry Power Station P. 0. Box 315 Surry, VA 23883 M. L. Bowling, Jr., Manager Nuclear Licensing Virginia Electric & Power Co.

5000 Dominion Boulevard Glen Allen, VA 23060 Sherlock Holmes, Chairman Board of Supervisors of Surry County Surry County Courthouse Surry, VA 23683 Dr. W. T. Lough Virginia State Corporation Commission Division of Energy Regulation P. 0. Box 1197 Richmond, VA 23209 (cc w/encl See page 3)

Sincerely, Original signed by Albert F. Gibson Albert F. Gibson, Director Division of Reactor Safety

e Virginia Electric and Power Co.

(cc w/encl cont'd)

Michael W. Maupin Hunton and Williams P. O. Box 1535 Richmond, VA 23212 C. M. G. Buttery, M.D., M.P.H.

State Health Commissioner Office of the Commissioner Virginia Department of Health P. 0. Box 2448 Richmond, VA 23218 Attorney General Supreme Court Building

. 101 North 8th Street Richmond, VA 23219 G. E. Kane, Station Manager North Anna Power Station P. 0. Box 402 Mineral, VA 23117 Executive Vice President Old Dominion Electric Cooperative 4201 Dominion Boulevard Glen Allen, VA 23209 William C. Porter, Jr.

County Administrator Louisa County

. P. 0. Box 160 Louisa, VA 23093 Patrick A. O'Hare Office of the Attorney General Supreme Court Building 101 North 8th Street Richmond, VA 23219 Commonwealth of Virginia bee w/encl:

LB6fuinent Control Desk P. Fredrickson, RII W. Brach, NRR B. Buckley, NRR L. Engle, NRR E. McKenna, NRR SEE PREVIOUS PAGE FOR CONCURRENCES

'*-RII:DRS MThomas 8/ /91 iRII:DRS FJape 8/ /91

  • RII:DRS CJulian 8/ /91 3
  • RII:DRP MSinkule 8/ /91 e

August 27, 1991

e Virginia Electric and Power Co.

cc w/encl cont'd:

Attorney General Supreme Court Building 101 North 8th Street Richmond, VA 23219 G. E.. Kane, Station Manager North Anna Power Station P. 0. Box 402 Mineral, VA 23117.

Executive Vice Pr~sident Old Dominion Electric Cooperative 4201 Dominion Boulevard Glen Allen, VA 23209 William C. Porter, Jr.

County Adminis'trator Louisa County P. 0. Box 160 Louisa, VA 23093 Patrick A~ 0 1Hare Office ~f the Attorney General Supreme Court Building 101 North 8th Street Richmond, VA 23219 Commonwealth of Virginia bee w/encl:

Document Control Desk P. Fredrickson, RII B *. Bue kl ey, NRR L. Engle, NRR F. Jape, RII E. Mc Kenna, NRR NRC Resident Inspector U.S. Nuclear Regulatory Commission Route 1, Box 166 Surry, VA 23883 NRC Resident Inspector U.S. Nuclear Regulatory Commission Route 2, Box 78-A Mineral, VA 23117 RI I_;DRS

'#?())

fo V MThOJllaS: ms 8/ /~/91 RII:DRS 1/.1-uJ f,;r FJape

. 8/;~/91 3

August 27, 1991 RII~P MS1n;:X~

8/\\1.,/91