ML18153C602
| ML18153C602 | |
| Person / Time | |
|---|---|
| Site: | Surry |
| Issue date: | 03/22/1991 |
| From: | Pebbles T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Stewart W VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| Shared Package | |
| ML18153C603 | List: |
| References | |
| NUDOCS 9104230050 | |
| Download: ML18153C602 (2) | |
Text
,),
March 22, 1*991 Virginia Electric and Power Company ATTN:
Mr. w~ L. Stewart, Senior.
Yice President - Nuclear 5000 Dominion Boulevard Glen Allen, VA 23060 Gentlemen:
SUBJECT:
SURRY REQUALIFICATION RETAKE EXAMINATION REPORT NO.
5Q-280/0L-9_i-Ol.
- The NRC administered. Requalification Retake exam.ination during the week of March 4, 1991, to employees of,your c~mpany who curiently hold licenses to*
operate the Surry Power Station. At-the conclusion of the examination, preliminary findings were discussed with.those members (?f your staff i dent i fi ed in. the enc 1 osed re'port.
Due to the ~mall sample size, no Requalification Program Evaluation was made.
In accordance with 10 CFR 2.790 of the Commission's regulations,*a copy of this letter and its enclosures will be placed in the NRC Publit Document Room.
Should you have any questions concerning this examination, please contact us.
Enclosure:
Examination Report No. 50-280/0L-91-0l cc w/encl :.
M. R. Kansler, Station Manager T. M. Williams, Manager, Power Training Services.
A. Friedman, Superintendent, Nuclear Training Commonwealth of Virginia bee w/encl:
(See Page 2) 9104230050 9!~~2280 coR ADOCK O"""'pDR r";,rj i -. :i 3 3
'~-* ~;.,* '
I '* l Sincerely, (Original signed py T. A. Peebles)
Thomas A. Pe~bles, Chief Operations Branch Division of Reactor Safety
e Virginia Electric and Power Company
- 2 bccw/encl:
B. Buckley, NRR A~ Gibson, DRS -
P. Fredrickson,.DRP.
W. Holland, Surry, Senior Resident Inspector R. Aiello, DRS R. Baldwin DRS Operator Licensing Branch, NRR Document Control Desk RII: DRS RB~in:sd 031.zr /91 RII~
PFrLdr 1i ckson 03/i;y/91 R~~
~Jbles 03/.z_u91 March 22, 1991