VIRGINIA ELECTRIC ARD POWER COMPANY SURRY POWER STATIOR MONTHLY OPERATING REPORT REPORT#
90~8 APPROVED:
POW 34-04
OPERATING DATA REPORT DOCKET NO.:
50-280 DATE: -0~9'1""1/""05..,.;/""'9.,..0-----
COMPLETED BY:
L.A. Warren TELEPHONE:
(804)357-3184 x355 OPERATING STATUS NOTES
- 1. Unit Name:
Surry Unit 1
- 2. Reporting Period: AUG. 01-31, 1990
- 3. Licensed Thennal Power (MWt):2441
- 4. Nameplate Rating (Gross MWe):847.5
- 5. Design Electrical Rating (Net MWe):
788
- 6. Maximum Dependable Capacity (Gross MWe):
820
- 7. Maximum Dependable Capacity (Net MWe):
781
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: ----------------------
- 9. Power Level To Which Restricted, If Any (Net MWe): -----------
- 10. Reason For Restrictions, If Any: ------------------
THIS MONTH YTD CUMULATIVE
- 11. Hours In Reporting Period 744.0 5831.0 155087.0
- 12. Number of Hours Reactor Was Critical 744.0 5540.7 98291.5
- 13. Reactor Reserve Shutdown Hours O
O 3774. 5
- 14. Hours Generator On-Line 744.0 5527.0 96350.2
- 15. Unit Reserve Shutdown Hours O
O 3736.2
- 16. Gross Therma 1 Energy Generated (MWH) 1614105. 0 131-26098. 5 224242901. 5
- 17. Gross Electrical Energy Generated (MWH) 519855.0 4385225.0 72930628.0
- 18. Net Electrical Energy Generated (MWH) 490754.0 4168041.0 69178971.0
- 19. Unit Service Factor 100%
94.8%
62.1%
- 20. Unit Availability Factor 100%
94.8%
64.5%
- 21. Unit Capacfty Factor (Using MDC Net) 84.5%
91.5%
57.6%
- 22. Unit Capacity Factor (Using DER Net) 83.7%
90.7%
56.6%
- 23. Unit Forced Outage Rate O
5.2%
20.8%
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Refueling/Snubber Outage scheduled to begin 10/05/90 1 62 days
- 25. If Shut Down at End of Reper~ Period Estimated Date of Startup:
- 26. Unit In Test Status (Prior t~ Commercial Operation):
FORECAsT*--A......
CH,.,..,I'""'E...,.VE'""'D.---
- ~rTIAL CRITICALITY
- 'I ITIAL ELECTRICITY
~~MERCIAL OPERATION 1
OPERATING DATA REPORT DOCKET NO.:
50-281 DATE: 7"""0*57...,9-0-----
COMPLETED BY:
L.A. Warren TELEPHONE:
(804)357-3184 x355 OPERA TI NG STATUS NOTES
- 1. Unit Name:
Surry Unit 2
- 2. Reporting Period: AUG. 01-31, 1990
- 3. Licensed Thermal Power (MWt):2441
- 4. Nameplate Rating (Gross MWe):847.5
- 5. Design Electrical Rating (Net MWe):
788
- 6. Maximum Dependable Capacity (Gross MWe):
820
- 7. Maximum Dependable Capacity (Net MWe):
781
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: ----------------------
- 9. Power Level To Which Restricted, If Any (Net MWe):
- 10. Reason For Restrictions, If Any:
THIS MONTH YTD CUMULATIVE
- 11. Hours In Reporting Period 744.0 5831.0 151967.0
- 12. Number of Hours Reactor Was Critical 714.2 5655.2 96853.8
- 13. Reactor Reserve Shutdown Hours O
O 328.1
- 14. Hours Generator On-Line
1--0*1...... 4.... -----55..... 3*7-,7--
95286.6
- 15. Unit Reserve Shutdown Hours O
O 0
- 16. Gross Thermal Energy Generated (MWH)
..,..16-3-23..... 1... 5-.0....
-13'"'""4-2-95-3*s-.3-223039873.1
- 17. Gross Electrical Energy Generated (MWH) 526780.0 4460065.0 72540664.0
- 18. Net Electrical Energy Generated (MWH) 498085.0 4237471.0 68778430.0
- 19. Unit Service Factor 95.1%
96.7%
62.7°~
- 20. Unit Availability Factor 95.1% ---9.....
6""".7-t 62.7°;
- 21. Unit Capacity Factor (Using MDC Net) 85.7%
93%
58.l~
- 22. Unit Capacity Factor (Using DER Net) 85.0% --..... 9..... 2--.2-t 57.4%
- 23. Unit Forced Outage Rate 4.9%
3.3%
15.1
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, -a-nd--Du_r..;.a.;..;;ti;.;.;.on of Each):
- 25. If Shut Down at End of Report Period Estimated Date of Startup:
- 26. Unit In Test Status (Prior to Commercial Operation):
FORECAS_.T-...... A C.....,H...,IE.... V... E... D~
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 2
ATIACHMENT2
e VIRGINIA POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH:
August YEAR:
1990 Approved:
~
OPERATING DATA REPORT OPERATING STATUS
- 1. Unit Name: ******.**..***.****.*******..*.* North Ama 1
- 2. Reporting Period:.***********.*****.**.**. August 1990
- 3. Licensed Thermal Power CMWt):.............
2,893
- 4. Nameplate Rating (Gross MWe):.............
947
- 5. Design Electrical Rating (Net MWe):.......
907
- 6.
Maxina.,n Dependable Capacity (Gross MWe):..
959
- 7.
Maxina.,n Dependable Capacity (Net MWe):....
911 DOCKET NO.:
50*338 DATE:
Septesar 4, 90 COMPLETED BY:
T. Phillips PHONE:
(703) 894-2537
- 8. If changes occur in Capacity Ratings (Items No. 3 thru 7) since last report, give reasons:------
_______ N/A. ________________________________ _
- 9. Power level to which restricted, if any (Net MWe): _N/A. __________________ _
- 10. Reasons for restrictions, if any: ________
N/A. __________________ _
- 11. Hours in Reporting Period ****************..*.***.********
- 12. Num>er of Hours Reactor was Critical *****.*..*.*.****.***
- 13. Reactor Reserve Shutdown Hours ******.*****.****.*********
- 14. Hours Generator On-Line ********************.*************
- 15. Unit Reserve Shutdown Hours ***********..*.**.************
- 16. Gross Thermal Energy Generated CMWH) *********************
- 17. Gross Electrical Energy Generated CMWH) ******************
- 18. Net Electrical Energy Generated (MWH) ****.***************
- 19. Unit Service Factor **************************************
- 20. Unit Availability Factor ******************.**************
- 21. Unit Capacity Factor (using MDC Net)....................*
- 22. Unit Capacity Factor (using DER Net).....................
- 23. Forced Outage Rate *********************........**.*...***
This Month 744.0 744.0 o.o 744.0 0.0 2, 148,642.4 707,195.0 672,026.0 100.0X 100.0X 99.21 99.61 0.0 Y*t*D 5,831.0 5,819.4 o.o 5,797.0 0.0 16,706,471.9 5,542,966.0 5,271,222.0 99.4X 99.41
- 99. 11 99.7X 0.6X C~lative 106,883.0 n,061.9 6,603.6 74,291.0 o.o 198,597,249.9 65,249,788.0 61,766,435.0 69.SX 69.5%
64.6X 63.7X 13.0X
- 24. Shutdowns Scheduled OVer Next 6 Months (Type, Date, and Duration of Each): ------------
_*60 day Refueling Outage scheduled 1/4/91 _______________________ _
- 25. If Shutdown et end of Report Period, estimated time of Startup: _N/A. ______________ _
- 26. Units in Test Status (Prior to Conmercial Operation):
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Forecast Achieved
OPERATING DATA REPORT OPERATING STATUS
- 1. Unit Name: ******.****.*********.*****...*. North Arv,a 2
- 2. Reporting Period: *********************.*** August 1990
- 3. Licensed Thermal Power CM\\lt):.............
2893
- 4. Nameplate Rating (Gross MWe):.............
947
- 5. Design Electrical Rating (Net M\\le):.......
907
- 6. Maxi nun Dependable Capacity (Gross M\\le):..
957
- 7.
Maxi.nun Dependable Capacity (Net M\\le):....
909 DOCKET NO. :
50-339 DATE:
Septeaar 4, 90 Cc>>IPLETED BY:
T. Phillips PHONE:
(703) B94-2774
- 8. If changes occur in Capacity Ratings (Items No. 3 thru 7) since laat report, give reasona: ------
.N/A. ________________________________ _
- 9. Power level to which restricted, if any (Net M\\le): _N/A. __________________ _
- 10. Reasona for restrictions, if any: ________ N/A __________________ _
Thia Month Y-t-D C~lative
- 11. Hours in Reporting Period **************.***.*************
744.0 5,831.0 85,151.0
- 12. N~r of Hours Reactor was Critical *********************
483.3 5,570.3 69,692.4
- 13. Reactor Reserve Shutdown Hours ***************************
36.9 36.9 5,891.8
- 14. Hours Generator On-Line **********************************
483.2 5,570.2 68,822.1
- 15. Unit Reserve Shutdown Hours ***************.**************
o.o 0.0 0.0
- 16. Gross Thermal Energy Generated CMWH) ******.**************
593,582.8 15,267,117.4 183,413,464.4
- 17. Groaa Electrical Energy Generated (M\\IH).*......*.**.**.**
289,100.0 5,027,524.0 60,033,041.0
- 18. Net Electrical Energy Generated (MWK) *.........*.********
268,213.0 4,769,708.0 57,608,540.0
- 19. Unit Service Factor ************************.*************
64.91 95.SX so.ax
- 20. Unit Availability Factor *********************************
64.91 95.SX so.ax
- 21. Unit Capacity Factor (uafng MDC Net).....................
39.7X 89.SX 75.3X
- 22. Unit-Capacity Factor (usfng_DER Net).................*.*.
39.7X 90.2%
74.6X
- 23. Forced Outage Rate ******* r* ************..*..*...*********
4.7X 0.4X 6.5X
- 24. Shutdowns Sche<l,led over Next 6 Months (Type, Date, and Duretion of Eech): ------------
_*75 my Refuel ing/10 yeer ISi ouug~ started 8/22/90 ___________________ _
- 25. If Shutdowi at end of Report Period, estimated time of Startup: _____ 11/5/90 _______ _
- 26. Units in Test Status (Prior to Coauercial Operation):
INITIAL CRITICALITY INITIAL ELECTRICITY COflifERCIAL OPERATION Forecast Achieved