Revised Monthly Operating Repts for Surry & North Anna Power Station Units 1 & 2 for Aug 1990
ML18153C386
Person / Time
Site: Surry, North Anna  Dominion icon.png
Issue date: 08/31/1990
From: Phillips T, Warren L
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
Shared Package
ML18153C385 List:
References
NUDOCS 9010120014
Download: ML18153C386 (7)


Text

VIRGINIA ELECTRIC ARD POWER COMPANY SURRY POWER STATIOR MONTHLY OPERATING REPORT REPORT#

90~8 APPROVED:

POW 34-04

OPERATING DATA REPORT DOCKET NO.:

50-280 DATE: -0~9'1""1/""05..,.;/""'9.,..0-----

COMPLETED BY:

L.A. Warren TELEPHONE:

(804)357-3184 x355 OPERATING STATUS NOTES

1. Unit Name:

Surry Unit 1

2. Reporting Period: AUG. 01-31, 1990
3. Licensed Thennal Power (MWt):2441
4. Nameplate Rating (Gross MWe):847.5
5. Design Electrical Rating (Net MWe):

788

6. Maximum Dependable Capacity (Gross MWe):

820

7. Maximum Dependable Capacity (Net MWe):

781

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: ----------------------
9. Power Level To Which Restricted, If Any (Net MWe): -----------
10. Reason For Restrictions, If Any: ------------------

THIS MONTH YTD CUMULATIVE

11. Hours In Reporting Period 744.0 5831.0 155087.0
12. Number of Hours Reactor Was Critical 744.0 5540.7 98291.5
13. Reactor Reserve Shutdown Hours O

O 3774. 5

14. Hours Generator On-Line 744.0 5527.0 96350.2
15. Unit Reserve Shutdown Hours O

O 3736.2

16. Gross Therma 1 Energy Generated (MWH) 1614105. 0 131-26098. 5 224242901. 5
17. Gross Electrical Energy Generated (MWH) 519855.0 4385225.0 72930628.0
18. Net Electrical Energy Generated (MWH) 490754.0 4168041.0 69178971.0
19. Unit Service Factor 100%

94.8%

62.1%

20. Unit Availability Factor 100%

94.8%

64.5%

21. Unit Capacfty Factor (Using MDC Net) 84.5%

91.5%

57.6%

22. Unit Capacity Factor (Using DER Net) 83.7%

90.7%

56.6%

23. Unit Forced Outage Rate O

5.2%

20.8%

24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Refueling/Snubber Outage scheduled to begin 10/05/90 1 62 days

25. If Shut Down at End of Reper~ Period Estimated Date of Startup:
26. Unit In Test Status (Prior t~ Commercial Operation):

FORECAsT*--A......

CH,.,..,I'""'E...,.VE'""'D.---

~rTIAL CRITICALITY
'I ITIAL ELECTRICITY

~~MERCIAL OPERATION 1

OPERATING DATA REPORT DOCKET NO.:

50-281 DATE: 7"""0*57...,9-0-----

COMPLETED BY:

L.A. Warren TELEPHONE:

(804)357-3184 x355 OPERA TI NG STATUS NOTES

1. Unit Name:

Surry Unit 2

2. Reporting Period: AUG. 01-31, 1990
3. Licensed Thermal Power (MWt):2441
4. Nameplate Rating (Gross MWe):847.5
5. Design Electrical Rating (Net MWe):

788

6. Maximum Dependable Capacity (Gross MWe):

820

7. Maximum Dependable Capacity (Net MWe):

781

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: ----------------------
9. Power Level To Which Restricted, If Any (Net MWe):
10. Reason For Restrictions, If Any:

THIS MONTH YTD CUMULATIVE

11. Hours In Reporting Period 744.0 5831.0 151967.0
12. Number of Hours Reactor Was Critical 714.2 5655.2 96853.8
13. Reactor Reserve Shutdown Hours O

O 328.1

14. Hours Generator On-Line

1--0*1...... 4.... -----55..... 3*7-,7--

95286.6

15. Unit Reserve Shutdown Hours O

O 0

16. Gross Thermal Energy Generated (MWH)

..,..16-3-23..... 1... 5-.0....

-13'"'""4-2-95-3*s-.3-223039873.1

17. Gross Electrical Energy Generated (MWH) 526780.0 4460065.0 72540664.0
18. Net Electrical Energy Generated (MWH) 498085.0 4237471.0 68778430.0
19. Unit Service Factor 95.1%

96.7%

62.7°~

20. Unit Availability Factor 95.1% ---9.....

6""".7-t 62.7°;

21. Unit Capacity Factor (Using MDC Net) 85.7%

93%

58.l~

22. Unit Capacity Factor (Using DER Net) 85.0% --..... 9..... 2--.2-t 57.4%
23. Unit Forced Outage Rate 4.9%

3.3%

15.1

24. Shutdowns Scheduled Over Next 6 Months (Type, Date, -a-nd--Du_r..;.a.;..;;ti;.;.;.on of Each):
25. If Shut Down at End of Report Period Estimated Date of Startup:
26. Unit In Test Status (Prior to Commercial Operation):

FORECAS_.T-...... A C.....,H...,IE.... V... E... D~

INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 2

ATIACHMENT2

e VIRGINIA POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH:

August YEAR:

1990 Approved:

~

OPERATING DATA REPORT OPERATING STATUS

1. Unit Name: ******.**..***.****.*******..*.* North Ama 1
2. Reporting Period:.***********.*****.**.**. August 1990
3. Licensed Thermal Power CMWt):.............

2,893

4. Nameplate Rating (Gross MWe):.............

947

5. Design Electrical Rating (Net MWe):.......

907

6.

Maxina.,n Dependable Capacity (Gross MWe):..

959

7.

Maxina.,n Dependable Capacity (Net MWe):....

911 DOCKET NO.:

50*338 DATE:

Septesar 4, 90 COMPLETED BY:

T. Phillips PHONE:

(703) 894-2537

8. If changes occur in Capacity Ratings (Items No. 3 thru 7) since last report, give reasons:------

_______ N/A. ________________________________ _

9. Power level to which restricted, if any (Net MWe): _N/A. __________________ _
10. Reasons for restrictions, if any: ________

N/A. __________________ _

11. Hours in Reporting Period ****************..*.***.********
12. Num>er of Hours Reactor was Critical *****.*..*.*.****.***
13. Reactor Reserve Shutdown Hours ******.*****.****.*********
14. Hours Generator On-Line ********************.*************
15. Unit Reserve Shutdown Hours ***********..*.**.************
16. Gross Thermal Energy Generated CMWH) *********************
17. Gross Electrical Energy Generated CMWH) ******************
18. Net Electrical Energy Generated (MWH) ****.***************
19. Unit Service Factor **************************************
20. Unit Availability Factor ******************.**************
21. Unit Capacity Factor (using MDC Net)....................*
22. Unit Capacity Factor (using DER Net).....................
23. Forced Outage Rate *********************........**.*...***

This Month 744.0 744.0 o.o 744.0 0.0 2, 148,642.4 707,195.0 672,026.0 100.0X 100.0X 99.21 99.61 0.0 Y*t*D 5,831.0 5,819.4 o.o 5,797.0 0.0 16,706,471.9 5,542,966.0 5,271,222.0 99.4X 99.41

99. 11 99.7X 0.6X C~lative 106,883.0 n,061.9 6,603.6 74,291.0 o.o 198,597,249.9 65,249,788.0 61,766,435.0 69.SX 69.5%

64.6X 63.7X 13.0X

24. Shutdowns Scheduled OVer Next 6 Months (Type, Date, and Duration of Each): ------------

_*60 day Refueling Outage scheduled 1/4/91 _______________________ _

25. If Shutdown et end of Report Period, estimated time of Startup: _N/A. ______________ _
26. Units in Test Status (Prior to Conmercial Operation):

INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Forecast Achieved

OPERATING DATA REPORT OPERATING STATUS

1. Unit Name: ******.****.*********.*****...*. North Arv,a 2
2. Reporting Period: *********************.*** August 1990
3. Licensed Thermal Power CM\\lt):.............

2893

4. Nameplate Rating (Gross MWe):.............

947

5. Design Electrical Rating (Net M\\le):.......

907

6. Maxi nun Dependable Capacity (Gross M\\le):..

957

7.

Maxi.nun Dependable Capacity (Net M\\le):....

909 DOCKET NO. :

50-339 DATE:

Septeaar 4, 90 Cc>>IPLETED BY:

T. Phillips PHONE:

(703) B94-2774

8. If changes occur in Capacity Ratings (Items No. 3 thru 7) since laat report, give reasona: ------

.N/A. ________________________________ _

9. Power level to which restricted, if any (Net M\\le): _N/A. __________________ _
10. Reasona for restrictions, if any: ________ N/A __________________ _

Thia Month Y-t-D C~lative

11. Hours in Reporting Period **************.***.*************

744.0 5,831.0 85,151.0

12. N~r of Hours Reactor was Critical *********************

483.3 5,570.3 69,692.4

13. Reactor Reserve Shutdown Hours ***************************

36.9 36.9 5,891.8

14. Hours Generator On-Line **********************************

483.2 5,570.2 68,822.1

15. Unit Reserve Shutdown Hours ***************.**************

o.o 0.0 0.0

16. Gross Thermal Energy Generated CMWH) ******.**************

593,582.8 15,267,117.4 183,413,464.4

17. Groaa Electrical Energy Generated (M\\IH).*......*.**.**.**

289,100.0 5,027,524.0 60,033,041.0

18. Net Electrical Energy Generated (MWK) *.........*.********

268,213.0 4,769,708.0 57,608,540.0

19. Unit Service Factor ************************.*************

64.91 95.SX so.ax

20. Unit Availability Factor *********************************

64.91 95.SX so.ax

21. Unit Capacity Factor (uafng MDC Net).....................

39.7X 89.SX 75.3X

22. Unit-Capacity Factor (usfng_DER Net).................*.*.

39.7X 90.2%

74.6X

23. Forced Outage Rate ******* r* ************..*..*...*********

4.7X 0.4X 6.5X

24. Shutdowns Sche<l,led over Next 6 Months (Type, Date, and Duretion of Eech): ------------

_*75 my Refuel ing/10 yeer ISi ouug~ started 8/22/90 ___________________ _

25. If Shutdowi at end of Report Period, estimated time of Startup: _____ 11/5/90 _______ _
26. Units in Test Status (Prior to Coauercial Operation):

INITIAL CRITICALITY INITIAL ELECTRICITY COflifERCIAL OPERATION Forecast Achieved